200 Hart Boulevard
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 2.88, against a residential limit of 0.75 — it is over that limit by 2.13. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
Unresolved conditions on record
15 violations remain open across 47 residential units (about 0.3 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Development & zoning
Floor-area ratio
| Built | 2.88 |
|---|---|
| Residential limit | 0.75 |
| Commercial limit | 0.00 |
| Community-facility limit | 1.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 1.00 |
|---|---|
| Unused ratio | -1.88 |
| Unused buildable area | — |
| Lot area | 14,375 sq ft |
Value & taxes
Assessment
| Assessed total | $2,405,707 |
|---|---|
| Assessed land | $56,265 |
| Assessed building | $2,349,442 |
| Market value on record | $0 |
| Assessed as % of market | — |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $0 |
| Tax rate | 12.502% |
| Estimated annual levy | — |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $0 | — |
| 2026 | $0 | — |
| 2025 | $0 | — |
| 2024 | $0 | — |
| 2023 | $0 | — |
Building & occupancy
Structure
| Year built | 1937 |
|---|---|
| Floors | 6 |
| Building area | 41,348 sq ft |
| Residential area | 41,348 sq ft |
| Commercial area | — |
Occupancy
| Ownership | Condominium |
|---|---|
| Total units | 47 |
| Residential units | 47 |
| Residential Avg unit size | 880 sq ft (calculated) |
| Building class | R4 |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | Stapleton (SIR) — 1.35 mi |
|---|---|
| School district | 31 |
| Police precinct | 120 |
| Nearest firehouse | Engine 156 — 412 Broadway |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Not in an evacuation zone |
Building compliance
| Facade | Repairs required |
|---|
Energy & emissions
| Energy use intensity | 134.4 kBtu/ft² |
|---|---|
| Greenhouse-gas emissions | 395 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 200 Hart Boulevard, 3g | 2026-04-17 | $375,000 | — | — |
| 200 Hart Boulevard, 1h | 2026-04-14 | $364,500 | — | — |
| 236 Hart Boulevard | 2025-08-18 | $840,000 | 1,448 | $580 |
| 222 Hart Boulevard | 2024-08-15 | $955,000 | 1,878 | $509 |
| 200 Hart Boulevard, 5f | 2024-08-12 | $370,000 | — | — |
| 192 Hart Boulevard | 2024-03-20 | $647,500 | 1,316 | $492 |
| 200 Hart Boulevard, 3h | 2023-06-22 | $340,000 | — | — |
| 263 Oakwood Avenue | 2023-01-24 | $730,000 | 1,050 | $695 |
Record activity
Compliance calculated
| Open violations | 15 |
|---|---|
| Open per residential unit | 0.3 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $0.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 66 |
|---|---|
| Permits / alterations | 20 |
| Recorded documents | 0 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Colonial Condominium |
|---|---|
| Parcel | 5002517501 |
| Block | 251 |
| Lot | 7501 |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 6 Aug 2026 | Housing | B | NOV SENT OUT | — | 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH the buildings authority RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| 6 Aug 2026 | Housing | B | NOV SENT OUT | — | 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| 6 Aug 2026 | Housing | B | NOV SENT OUT | — | 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS ON 2ND STORY BALCONY AT 1ST FIRE ESCAPE FROM SOUTH AT BUILDING FRONT |
| 29 Jan 2026 | Housing | B | NOT COMPLIED WITH | — | 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| 18 Jun 2020 | Housing | B | NOV SENT OUT | — | 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| 18 Jun 2020 | Housing | B | NOV SENT OUT | — | 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM WEST AT NORTH |
| 18 Jun 2020 | Housing | A | NOV SENT OUT | — | 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY |
| 19 Oct 2012 | Housing | B | NOV SENT OUT | — | SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIRCONDITIONER INSTALLED IN WINDOW WITH OUT BRACKETS AT FRONT , 6th STORY, SECTION AT SOUTHEAST |
| 19 Oct 2012 | Housing | B | NOT COMPLIED WITH | — | SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIRCONDITIONER INSTALLED IN WINDOW WITH OUT BRACKETS AT FRONT , 3rd STORY, SECTION AT NORTHEAST |
| 19 Oct 2012 | Housing | B | NOT COMPLIED WITH | — | SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIRCONDITIONER INSTALLED IN WINDOW WITH OUT BRACKETS AT FRONT , 2nd STORY, SECTION AT NORTHEAST |
| 19 Oct 2012 | Housing | B | NOT COMPLIED WITH | — | SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIRCONDITIONER INSTALLED IN WINDOW WITH OUT BRACKETS AT FRONT , 1st STORY, SECTION AT NORTHEAST |
| 24 Oct 2006 | Housing | A | NOV SENT OUT | — | SECTION 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR .. AT PUBLIC HALL, 1st STORY |
| 24 Oct 2006 | Housing | A | NOV SENT OUT | — | SECTION 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY |
| 24 Oct 2006 | Housing | A | NOV SENT OUT | — | SECTION 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX .. AT PUBLIC HALL, 1st STORY |
| 3 Oct 1995 | Housing | B | NOT COMPLIED WITH | — | SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR CONDITIONER EXTENDING OVER WINDOW SILL WITHOUT PROPER SUPPORT BLDG THRU OUT |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 5 Aug 2026 | Banging/Pounding | Noise - Residential | Closed | 5 Aug 2026 |
| 5 Aug 2026 | Banging/Pounding | Noise - Residential | Closed | 5 Aug 2026 |
| 17 Jul 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 17 Jul 2026 |
| 16 Jul 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 16 Jul 2026 |
| 15 Jul 2026 | WATER SUPPLY | PLUMBING | Closed | 16 Jul 2026 |
| 15 Jul 2026 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 16 Jul 2026 |
| 15 Jul 2026 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 16 Jul 2026 |
| 12 Jul 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 12 Jul 2026 |
| 12 Jul 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 12 Jul 2026 |
| 12 Jul 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 12 Jul 2026 |
| 11 Jul 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 11 Jul 2026 |
| 10 Jun 2026 | GARBAGE/RECYCLING STORAGE | UNSANITARY CONDITION | Closed | 14 Jun 2026 |
| 3 Jun 2026 | Human Feces | Indoor Air Quality | Closed | 4 Jun 2026 |
| 1 Jun 2026 | PESTS | UNSANITARY CONDITION | Closed | 18 Jun 2026 |
| 27 Apr 2026 | Ventilation | Indoor Air Quality | Closed | 28 Apr 2026 |
| 3 Apr 2026 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 5 Apr 2026 |
| 25 Feb 2026 | Snow Tracking | Snow or Ice | Closed | 25 Feb 2026 |
| 26 Jan 2026 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 28 Jan 2026 |
| 26 Jan 2026 | Roadway | Snow or Ice | Closed | 2 Feb 2026 |
| 2 Jan 2026 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 6 Jan 2026 |
| 6 Sep 2025 | Banging/Pounding | Noise - Residential | Closed | 6 Sep 2025 |
| 17 Mar 2025 | Broken Curb | Curb Condition | Closed | 28 Mar 2025 |
| 30 Dec 2024 | Other/Unknown | Street Sign - Dangling | Closed | 3 Jan 2025 |
| 27 Sep 2024 | Banging/Pounding | Noise - Residential | Closed | 27 Sep 2024 |
| 27 Sep 2024 | Banging/Pounding | Noise - Residential | Closed | 27 Sep 2024 |
| 19 Jul 2024 | Loud Music/Party | Noise - Residential | Closed | 19 Jul 2024 |
| 12 Feb 2024 | MOLD | UNSANITARY CONDITION | Closed | 6 Mar 2024 |
| 7 Jan 2024 | With License Plate | Abandoned Vehicle | Closed | 7 Jan 2024 |
| 17 Jun 2023 | With License Plate | Abandoned Vehicle | Closed | 17 Jun 2023 |
| 6 Mar 2023 | Dumpster - Construction Waste | Street Condition | Closed | 7 Mar 2023 |
| 5 Mar 2023 | Cone | Obstruction | Closed | 6 Mar 2023 |
| 28 Feb 2023 | Cone | Obstruction | Closed | 28 Feb 2023 |
| 13 Aug 2022 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 18 Aug 2022 |
| 13 Aug 2022 | Noise: Construction Equipment (NC1 | Noise | Closed | 20 Aug 2022 |
| 30 Jul 2022 | Commercial Overnight Parking | Illegal Parking | Closed | 30 Jul 2022 |
| 30 Jul 2022 | Blocked Sidewalk | Illegal Parking | Closed | 30 Jul 2022 |
| 4 Jun 2022 | Grass/Weeds | Maintenance or Facility | Closed | 16 Jun 2022 |
| 29 May 2022 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 29 May 2022 |
| 6 Jan 2022 | Boiler - Defective/Inoperative/No Permit | Boilers | Closed | 11 Jan 2022 |
| 5 Jan 2022 | Boiler - Defective/Inoperative/No Permit | Boilers | Closed | 5 Jan 2022 |
| 31 Dec 2021 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 3 Jan 2022 |
| 31 Dec 2021 | GARBAGE/RECYCLING STORAGE | UNSANITARY CONDITION | Closed | 30 Mar 2022 |
| 31 Dec 2021 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 3 Jan 2022 |
| 21 Jul 2021 | 2R Bulk-Missed Recy Collection | Missed Collection (All Materials | Closed | 23 Jul 2021 |
| 19 Jul 2021 | Request Large Bulky Item Collection | Request Large Bulky Item Collection | Closed | 21 Jul 2021 |
| 18 Jul 2021 | Loud Music/Party | Noise - Residential | Closed | 18 Jul 2021 |
| 18 Jul 2021 | Loud Television | Noise - Residential | Closed | 18 Jul 2021 |
| 1 Jul 2021 | Posted Parking Sign Violation | Illegal Parking | Closed | 1 Jul 2021 |
| 1 Jun 2021 | Grass/Weeds | Maintenance or Facility | Closed | 30 Jun 2021 |
| 1 Jun 2021 | Traffic Sign or Signal Blocked | Overgrown Tree/Branches | Closed | 2 Jun 2021 |
Showing the 50 most recent of 66. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 15 Aug 2022 | A2 | ISSUED | — |
| 27 Oct 2015 | A3 | ISSUED | — |
| 11 Aug 2010 | A2 | ISSUED | — |
| 11 Aug 2010 | A2 | ISSUED | — |
| 28 Jun 2010 | A3 | ISSUED | — |
| 28 Jun 2010 | A3 | ISSUED | — |
| 7 Dec 2009 | A3 | ISSUED | — |
| 7 Dec 2009 | A3 | ISSUED | — |
| 17 Jul 2009 | A2 | ISSUED | — |
| 15 Jul 2009 | A3 | ISSUED | — |
| 29 Jan 2007 | A3 | ISSUED | — |
| 29 Jan 2007 | A3 | ISSUED | — |
| 16 Jan 1998 | A3 | ISSUED | — |
| 16 May 1997 | A3 | RE-ISSUED | — |
| 16 May 1997 | A3 | RE-ISSUED | — |
| 29 Jun 1994 | A2 | ISSUED | — |
| 29 Jun 1994 | A2 | ISSUED | — |
| 28 Dec 1993 | A2 | ISSUED | — |
| 28 Dec 1993 | A2 | ISSUED | — |
| 28 Dec 1993 | A2 | ISSUED | — |
About this page
Compiled from New York City public records — data retrieved 6 days ago. Coverage on this parcel: 14 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.