10 Bay Street Landing
Analysis
The building’s over‑built status and open violations create material risk, but strong market‑vs‑assessed value and solid unit size are positives. Proceed with caution and factor remediation costs.
The good
- market value on record ($12,294,000) exceeds assessed value ($5,532,300)
- no enforcement penalties and no legal proceedings
- property is not on a tax lien sale list
- average unit size (1,343 sq ft) is large for the market
The bad
- built beyond residential floor‑area limit (residential FAR 4.3 vs limit 2.43)
- 44 open violations (0.3 per unit) and 14 unpaid safety violations totaling $14,000
- no arms‑length sale recorded, indicating lack of market price confirmation
- over‑built residential floor area leaves 20,000 sq ft of unused buildable space, limiting future expansion
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 4.30, against a residential limit of 2.43 — it is over that limit by 1.87. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands. A higher limit of 4.80 does apply to community-facility use, which produces an apparent 20,000 sq ft of headroom — but that is not residential floor area and is not interchangeable with it. Reading that number as room for more apartments is the most expensive mistake available in this data.
Unresolved conditions on record
44 violations remain open across 128 residential units (about 0.3 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Assessed value trend
Assessed value has risen 6.9% across the 5 assessment years on record (2023 to 2027), standing at $5,532,300. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.
Development & zoning
Floor-area ratio
| Built | 4.30 |
|---|---|
| Residential limit | 2.43 |
| Commercial limit | 3.40 |
| Community-facility limit | 4.80 |
Development headroom (calculated) calculated
| Highest permitted ratio | 4.80 |
|---|---|
| Unused ratio | 0.50 |
| Unused buildable area | 20,000 sq ft |
| Lot area | 40,000 sq ft |
Value & taxes
Assessment
| Assessed total | $5,532,300 |
|---|---|
| Assessed land | $450,000 |
| Assessed building | $5,082,300 |
| Market value on record | $12,294,000 |
| Assessed as % of market | 45.0% |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $5,180,130 |
| Tax rate | 12.502% |
| Estimated annual levy | $647,619.85 |
| Tax exemption (assessed value) | $112,587 |
| Tax abatement | Co-op/condo — $128,276 |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $5,532,300 | — |
| 2026 | $5,103,000 | +8.4% |
| 2025 | $5,044,500 | +1.2% |
| 2024 | $5,043,600 | +0.0% |
| 2023 | $5,177,250 | -2.6% |
Building & occupancy
Structure
| Year built | 1984 |
|---|---|
| Floors | 9 |
| Building area | 171,935 sq ft |
| Residential area | 171,935 sq ft |
| Commercial area | — |
Occupancy
| Ownership | Cooperative |
|---|---|
| Total units | 128 |
| Residential units | 128 |
| Residential Avg unit size | 1,343 sq ft (calculated) |
| Building class | D0 |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | Tompkinsville (SIR) — 0.09 mi |
|---|---|
| School district | 31 |
| Police precinct | 120 |
| Nearest firehouse | Marine 9 — 305 Front Street |
Location risk
| Flood zone | Moderate — 0.2% annual chance (Zone X) |
|---|---|
| Hurricane evacuation zone | Zone 1 |
| Projected floodplain | In the projected 2050s floodplain |
| City emergency repairs | 1 orders — $0 billed (through 1999) |
Energy & emissions
| Energy use intensity | 43.2 kBtu/ft² |
|---|---|
| Greenhouse-gas emissions | 564 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 155 Bay Street, 4f | 2026-05-21 | $495,000 | — | — |
| 90 Bay Street Landing, 7b | 2026-05-13 | $800,000 | — | — |
| 46-52 Bay Street Landing, Q1h | 2026-01-08 | $775,000 | — | — |
| 155 Bay Street, 2l | 2025-11-18 | $520,000 | — | — |
| 90 Bay Street Landing, 6l | 2025-10-09 | $999,000 | — | — |
| 155 Bay Street, 4h | 2025-09-15 | $400,000 | — | — |
| 90 Bay Street Landing, 6b | 2025-08-08 | $920,000 | — | — |
| 80 Bay Street Landing, 5d | 2025-07-15 | $615,000 | — | — |
Record activity
Compliance calculated
| Open violations | 44 |
|---|---|
| Open per residential unit | 0.3 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $14,000.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 63 |
|---|---|
| Permits / alterations | 55 |
| Recorded documents | 132 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Bsl One Owners Corp. |
|---|---|
| Parcel | 5000010216 |
| Block | 1 |
| Lot | 216 |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 19 May 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT PH I UPPER LEVEL, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''WEST |
| 13 Feb 2020 | Enforcement | CLASS - 2 | ACTIVE | — | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #811858 SUBMIT ACCEPTABLE REQUIRED TECH |
| 2 May 2017 | Building | Benchmarking - a local law | Active | — | FTF-EN-BENCH |
| 2 May 2015 | Building | Benchmarking - a local law | Active | — | FTF-EN-BENCH |
| 6 Jun 2014 | Building | Benchmarking - a local law | Active | — | FTF-EN-BENCH |
| 15 May 2014 | Building | Boiler | Active | — | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| 15 May 2014 | Building | Boiler | Active | — | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| 15 May 2014 | Building | Boiler | Active | — | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| 15 May 2014 | Building | Boiler | Active | — | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| 14 Mar 2014 | Housing | A | NOV SENT OUT | — | SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CRACK AT UPPER EAST WALL IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''G-L |
| 3 Jun 2013 | Building | Benchmarking - a local law | Active | — | FTF-EN-BENCH |
| 7 Feb 2013 | Housing | B | NOV SENT OUT | — | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AT PUBLIC HALL, 1st STORY |
| 1 Jan 2012 | Building | Benchmarking - a local law | Active | — | FTF-EN-BENCH |
| 10 Sep 2009 | Housing | A | NOV SENT OUT | — | SECTION 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING AT PUBLIC HALL, 1st STORY |
| 6 Jan 2006 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 6 Jan 2006 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 6 Jan 2006 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 6 Jan 2006 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 6 Jan 2006 | Building | Boiler | Active | — | a local law |
| 6 Jan 2006 | Building | Boiler | Active | — | a local law |
| 6 Jan 2006 | Building | Boiler | Active | — | a local law |
| 6 Jan 2006 | Building | Boiler | Active | — | a local law |
| 31 Jan 2005 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 31 Jan 2005 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 31 Jan 2005 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 31 Jan 2005 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 31 Jan 2005 | Building | Boiler | Active | — | a local law |
| 31 Jan 2005 | Building | Boiler | Active | — | a local law |
| 31 Jan 2005 | Building | Boiler | Active | — | a local law |
| 31 Jan 2005 | Building | Boiler | Active | — | a local law |
| 8 Aug 2002 | Building | — | V-Building VIOLATION - ACTIVE | — | L1198-a local law/98 - FACADE FACADE REQUIRED |
| 6 Sep 2001 | Building | — | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | — | C-CONSTRUCTION OTHER OPTIONAL |
| 16 Mar 1999 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 16 Mar 1999 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 16 Mar 1999 | Building | Boiler | Active | — | a local law |
| 16 Mar 1999 | Building | Boiler | Active | — | a local law |
| 4 May 1998 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 4 May 1998 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 4 May 1998 | Building | Boiler | Active | — | a local law |
| 4 May 1998 | Building | Boiler | Active | — | a local law |
| 29 Aug 1995 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 29 Aug 1995 | Building | — | V-Building VIOLATION - ACTIVE | — | a local law-a local law/91 - BOILERS BOILER REQUIRED |
| 29 Aug 1995 | Building | Boiler | Active | — | a local law |
| 29 Aug 1995 | Building | Boiler | Active | — | a local law |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 3 Jul 2026 | With License Plate | Abandoned Vehicle | Closed | 3 Jul 2026 |
| 18 Jun 2026 | Trash | Dirty Condition | Closed | 25 Jun 2026 |
| 18 Jun 2026 | PESTS | UNSANITARY CONDITION | Closed | 30 Jun 2026 |
| 11 May 2026 | DAMP SPOT | WATER LEAK | Closed | 18 May 2026 |
| 23 Mar 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 24 Mar 2026 |
| 10 Mar 2026 | Blocked Hydrant | Illegal Parking | Closed | 10 Mar 2026 |
| 26 Feb 2026 | Blocked Hydrant | Illegal Parking | Closed | 26 Feb 2026 |
| 25 Feb 2026 | Blocked Crosswalk | Illegal Parking | Closed | 25 Feb 2026 |
| 24 Feb 2026 | Snow Tracking | Snow or Ice | Closed | 24 Feb 2026 |
| 23 Feb 2026 | Snow Tracking | Snow or Ice | Closed | 23 Feb 2026 |
| 26 Jan 2026 | Snow Tracking | Snow or Ice | Closed | 26 Jan 2026 |
| 15 Jan 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 15 Jan 2026 |
| 21 Dec 2025 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 23 Dec 2025 |
| 15 Dec 2025 | Blocked - Construction | Street Condition | Closed | 16 Dec 2025 |
| 14 Dec 2025 | Snow Tracking | Snow or Ice | Closed | 14 Dec 2025 |
| 14 Dec 2025 | Snow Tracking | Snow or Ice | Closed | 14 Dec 2025 |
| 10 Dec 2025 | Blocked - Construction | Street Condition | Closed | 10 Dec 2025 |
| 5 Dec 2025 | Blocked - Construction | Street Condition | Closed | 8 Dec 2025 |
| 27 Oct 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 28 Oct 2025 |
| 27 Oct 2025 | Blocked Hydrant | Illegal Parking | Closed | 27 Oct 2025 |
| 6 Oct 2025 | Hitting Building | Overgrown Tree/Branches | Closed | 9 Oct 2025 |
| 15 Aug 2025 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 21 Aug 2025 |
| 21 Jul 2025 | Blocked Sidewalk | Illegal Parking | Closed | 21 Jul 2025 |
| 21 Jul 2025 | Blocked Crosswalk | Illegal Parking | Closed | 21 Jul 2025 |
| 26 Jun 2025 | Coming into Apartment | Construction Lead Dust | In Progress | — |
| 4 Apr 2025 | Removal Request | Illegal Dumping | Closed | 6 Apr 2025 |
| 5 Aug 2024 | Planted More Than 2 Years Ago | Dead/Dying Tree | Closed | 10 Oct 2024 |
| 1 Feb 2024 | Building - Vacant, Open And Unguarded | General Construction/Plumbing | Closed | 26 Aug 2024 |
| 11 Jan 2024 | Posted Parking Sign Violation | Illegal Parking | Closed | 11 Jan 2024 |
| 8 Jan 2024 | Posted Parking Sign Violation | Illegal Parking | Closed | 8 Jan 2024 |
| 5 Jan 2024 | Unauthorized Tree Removal | Illegal Tree Damage | Closed | 8 Jan 2024 |
| 15 Sep 2023 | Noise, Barking Dog (NR5 | Noise | Closed | 2 Oct 2023 |
| 19 Apr 2023 | In Common Areas | Construction Lead Dust | In Progress | — |
| 31 Jan 2023 | Ewaste appointment | Electronics Waste Appointment | Closed | 3 Feb 2023 |
| 15 Dec 2022 | Smoking Violation | Smoking | Closed | 4 Jun 2024 |
| 1 Nov 2022 | Engine Idling | Noise - Vehicle | Closed | 1 Nov 2022 |
| 22 Aug 2022 | PESTS | UNSANITARY CONDITION | Closed | 30 Aug 2022 |
| 22 Aug 2022 | PESTS | UNSANITARY CONDITION | Closed | 30 Aug 2022 |
| 29 Jul 2022 | Hydrant Running (WC3 | Water System | Closed | 29 Jul 2022 |
| 28 Jul 2022 | Hydrant Running (WC3 | Water System | Closed | 29 Jul 2022 |
| 11 Jul 2022 | Trash | Dirty Condition | Closed | 12 Jul 2022 |
| 28 May 2022 | Cave-in | Street Condition | Closed | 1 Jun 2022 |
| 28 May 2022 | Cave-in | Street Condition | Closed | 1 Jun 2022 |
| 27 May 2022 | Structure - Outdoors | Maintenance or Facility | Closed | 27 May 2022 |
| 17 Jan 2022 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 24 Jan 2022 |
| 20 Nov 2021 | Removal Request | Illegal Dumping | Closed | 6 Dec 2021 |
| 27 Oct 2021 | Sidewalk Shed/Pipe Scafford - Inadequate Defective/None | General Construction/Plumbing | Closed | 27 Oct 2021 |
| 11 Oct 2021 | Hitting Building | Overgrown Tree/Branches | Closed | 28 Oct 2021 |
| 4 Oct 2021 | Failure To Retain Water/Improper Drainage- (a local law/89 | Plumbing | Closed | 15 Oct 2021 |
| 4 Oct 2021 | Plumbing Work - Unlicensed/Illegal/Improper Work In Progress | Investigations and Discipline (IAD | Closed | 5 Oct 2021 |
Showing the 50 most recent of 63. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 3 Sep 2025 | Sidewalk Shed | Signed-off | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF |
| 29 Aug 2024 | Suspended Scaffold | Permit Issued | FACADE INSPECTION |
| 21 Jun 2024 | General Construction | Signed-off | Limited exterior repairs at north, south, east, and west facades. No change in use, egress, or occupancy |
| 22 Feb 2024 | Sidewalk Shed | Signed-off | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF |
| 1 Sep 2021 | Sidewalk Shed | Signed-off | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF |
| 25 Sep 2018 | A2 | ISSUED | — |
| 18 Jul 2017 | A2 | ISSUED | — |
| 27 Oct 2016 | A3 | ISSUED | — |
| 27 Oct 2016 | A3 | ISSUED | — |
| 24 Jan 2012 | A2 | ISSUED | — |
| 24 Jan 2012 | A2 | ISSUED | — |
| 10 Jan 2012 | A2 | ISSUED | — |
| 13 Oct 2011 | A2 | ISSUED | — |
| 13 Oct 2011 | A2 | ISSUED | — |
| 22 Apr 2011 | A2 | ISSUED | — |
| 15 Dec 2010 | A3 | ISSUED | — |
| 15 Dec 2010 | A3 | ISSUED | — |
| 6 Oct 2010 | A3 | ISSUED | — |
| 1 Oct 2010 | A2 | ISSUED | — |
| 1 Oct 2010 | A2 | ISSUED | — |
| 3 Dec 2009 | A3 | ISSUED | — |
| 3 Dec 2009 | A3 | ISSUED | — |
| 22 Sep 2009 | A3 | ISSUED | — |
| 6 Apr 2009 | A2 | ISSUED | — |
| 10 Feb 2009 | A2 | ISSUED | — |
| 30 Jul 2008 | A3 | ISSUED | — |
| 30 Jul 2008 | A3 | ISSUED | — |
| 30 Jul 2008 | A3 | ISSUED | — |
| 30 Jul 2008 | A3 | ISSUED | — |
| 8 May 2008 | A2 | ISSUED | — |
| 8 May 2008 | A2 | ISSUED | — |
| 30 Jul 2007 | A2 | ISSUED | — |
| 30 Jul 2007 | A2 | ISSUED | — |
| 27 Jun 2007 | A2 | ISSUED | — |
| 7 Dec 2006 | A2 | ISSUED | — |
| 7 Dec 2006 | A2 | ISSUED | — |
| 16 Nov 2006 | A2 | ISSUED | — |
| 18 Jun 2002 | A2 | ISSUED | — |
| 18 Jun 2002 | A2 | ISSUED | — |
| 9 May 2002 | A3 | ISSUED | — |
| 9 May 2002 | A3 | ISSUED | — |
| 8 Jan 2002 | A2 | ISSUED | — |
| 7 Dec 2001 | A2 | ISSUED | — |
| 7 Dec 2001 | A2 | ISSUED | — |
| 25 Jul 2000 | A3 | ISSUED | — |
| 25 Jul 2000 | A3 | ISSUED | — |
| 26 Jun 2000 | A3 | ISSUED | — |
| 16 Aug 1994 | A2 | ISSUED | — |
| 16 Aug 1994 | A2 | ISSUED | — |
| 14 Jul 1993 | A2 | ISSUED | — |
Showing the 50 most recent of 55. The full set is available in the interactive report.
Recorded documents
Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.
| Recorded | Type | Amount | From | To |
|---|---|---|---|---|
| 1 May 2026 | RPTT&RET | $445,000 | — | — |
| 13 Feb 2026 | RPTT&RET | $525,000 | — | — |
| 26 Sep 2025 | RPTT&RET | $368,000 | — | — |
| 15 May 2025 | RPTT&RET | $520,000 | — | — |
| 14 Jan 2025 | RPTT&RET | $475,000 | — | — |
| 5 Dec 2024 | RPTT&RET | $380,000 | — | — |
| 25 Nov 2024 | RPTT&RET | $430,000 | — | — |
| 4 Nov 2024 | RPTT&RET | $630,000 | — | — |
| 22 Oct 2024 | RPTT&RET | $465,000 | — | — |
| 14 Jun 2024 | RPTT&RET | $370,000 | — | — |
| 25 Apr 2024 | RPTT&RET | $350,000 | — | — |
| 26 Mar 2024 | RPTT&RET | $365,000 | — | — |
| 7 Feb 2024 | RPTT&RET | $405,000 | — | — |
| 31 Jan 2024 | RPTT&RET | $705,000 | — | — |
| 18 Jan 2024 | RPTT&RET | $375,000 | — | — |
| 8 Jan 2024 | RPTT&RET | $485,000 | — | — |
| 13 Oct 2023 | RPTT&RET | $425,000 | — | — |
| 14 Sep 2023 | RPTT&RET | $490,000 | — | — |
| 13 Sep 2023 | RPTT&RET | — | — | — |
| 17 Aug 2023 | RPTT&RET | $306,425 | — | — |
| 16 Aug 2023 | RPTT&RET | $325,000 | — | — |
| 7 Aug 2023 | RPTT&RET | $575,000 | — | — |
| 10 Jul 2023 | RPTT&RET | $610,000 | — | — |
| 13 Jun 2023 | RPTT&RET | $500,000 | — | — |
| 12 Jun 2023 | RPTT&RET | $430,000 | — | — |
| 18 Apr 2023 | RPTT&RET | $390,000 | — | — |
| 27 Mar 2023 | RPTT&RET | $485,000 | — | — |
| 23 Nov 2022 | RPTT&RET | $425,000 | — | — |
| 18 Nov 2022 | RPTT&RET | $375,000 | — | — |
| 26 Oct 2022 | RPTT&RET | $525,000 | — | — |
| 9 Sep 2022 | RPTT&RET | — | — | — |
| 2 Sep 2022 | RPTT&RET | $348,000 | — | — |
| 1 Jul 2022 | RPTT&RET | $450,000 | — | — |
| 8 Jun 2022 | RPTT&RET | $345,000 | — | — |
| 13 May 2022 | RPTT&RET | $400,000 | — | — |
| 26 Jan 2022 | RPTT&RET | $400,000 | — | — |
| 12 Oct 2021 | RPTT&RET | $340,000 | — | — |
| 2 Sep 2021 | RPTT&RET | $385,000 | — | — |
| 26 Aug 2021 | RPTT&RET | $395,000 | — | — |
| 6 Aug 2021 | RPTT&RET | $460,000 | — | — |
| 20 Jul 2021 | RPTT&RET | $387,500 | — | — |
| 5 Mar 2021 | RPTT&RET | $445,000 | — | — |
| 11 Feb 2021 | RPTT&RET | $260,000 | — | — |
| 11 Sep 2020 | RPTT&RET | — | — | — |
| 1 Jul 2020 | RPTT&RET | $750,000 | — | — |
| 11 Jun 2020 | RPTT&RET | $407,000 | — | — |
| 22 May 2020 | RPTT&RET | $610,000 | — | — |
| 4 May 2020 | RPTT&RET | $395,000 | — | — |
| 12 Mar 2020 | Transfer tax return | $520,000 | — | — |
| 3 Feb 2020 | RPTT&RET | $357,000 | — | — |
Showing the 50 most recent of 132. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 5 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.