213-06 75 Avenue
Analysis
The building’s compliance and tenant‑satisfaction problems outweigh its solid size and compliance with FAR limits, resulting in a medium risk rating.
The good
- Built FAR 1.04 is well below the residential limit of 1.5, indicating no over‑building risk
- No enforcement penalties are recorded
- Large building footprint (644,836 sq ft) provides ample space for existing tenants
- Assessed value has risen 10.9%
The bad
- 103 open violations (0.2 per unit) signal ongoing compliance issues
- Safety‑violation penalties of $3,000 are owed and reflect missing boiler/elevator reports
- 815 complaints suggest tenant dissatisfaction
- No arm‑length sale since 1974 and last recorded sale price of $0 limit pricing transparency
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Unused development capacity on the lot
Built floor-area ratio is 1.04 against a permitted 2.00, leaving 0.96 of unused ratio — roughly 596,450 sq ft of buildable area on a lot of 621,302 sq ft. Treat that as a ceiling under the floor-area rules, not a plan: height limits, setbacks, lot coverage, landmark status and sitting tenants can each reduce it, in some cases to nothing.
Unresolved conditions on record
103 violations remain open across 567 residential units (about 0.2 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
No arm's-length sale on record
The last recorded transfer is dated 16 Apr 1974 at a recorded price of $0. Transfers between related parties, estate settlements and corrective filings are legitimately recorded at nominal amounts, so this is neither an error nor a bargain — it means there is no usable sale price here, and every ratio derived from one (price per unit, price against assessed value) is therefore withheld rather than shown as zero.
Assessed value trend
Assessed value has risen 10.9% across the 5 assessment years on record (2023 to 2027), standing at $29,011,950. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.
Development & zoning
Floor-area ratio
| Built | 1.04 |
|---|---|
| Residential limit | 1.50 |
| Commercial limit | 0.00 |
| Community-facility limit | 2.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 2.00 |
|---|---|
| Unused ratio | 0.96 |
| Unused buildable area | 596,450 sq ft |
| Lot area | 621,302 sq ft |
Value & taxes
Assessment
| Assessed total | $29,011,950 |
|---|---|
| Assessed land | $11,183,400 |
| Assessed building | $17,828,550 |
| Market value on record | $64,471,000 |
| Assessed as % of market | 45.0% |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $27,703,260 |
| Tax rate | 12.502% |
| Estimated annual levy | $3,463,461.57 |
| Tax exemption (assessed value) | $478,920 |
| Tax abatement | Co-op/condo — $632,297 |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $29,011,950 | — |
| 2026 | $28,444,950 | +2.0% |
| 2025 | $27,967,050 | +1.7% |
| 2024 | $27,040,500 | +3.4% |
| 2023 | $26,153,550 | +3.4% |
Building & occupancy
Structure
| Year built | 1965 |
|---|---|
| Floors | 6 |
| Building area | 644,836 sq ft |
| Residential area | 644,836 sq ft |
| Commercial area | — |
Occupancy
| Ownership | Cooperative |
|---|---|
| Total units | 567 |
| Residential units | 567 |
| Rent-stabilized | 2 |
| Free Market / Other | 565 |
| Residential Avg unit size | 1,137 sq ft (calculated) |
| Building class | D4 |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | Jamaica-179 St (F) — 2.16 mi |
|---|---|
| School district | 26 |
| Police precinct | 111 |
| Nearest firehouse | Battalion 53/Engine 326/Ladder 160 — 64-04 Springfield Blvd. |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Not in an evacuation zone |
| City emergency repairs | 14 orders — $10,341 billed (through 2026) |
| Evictions on record | 5 (most recent 2026) |
Building compliance
| Facade | Repairs required |
|---|
Energy & emissions
| Energy use intensity | 52.1 kBtu/ft² |
|---|---|
| Greenhouse-gas emissions | 2,537 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 211-02 75th Avenue, 6p | 2026-09-16 | $295,000 | — | — |
| 75-15 210th Street, 5f | 2026-09-09 | $345,000 | — | — |
| 21106 75th Avenue, 1g | 2026-07-22 | $278,000 | — | — |
| 211-06 75th Avenue, 2e | 2026-07-17 | $435,000 | — | — |
| 211-02 75th Avenue, 17-1l | 2026-06-29 | $226,000 | — | — |
| 211-06 75th Ave, 4g | 2026-06-18 | $275,000 | — | — |
| 211-06 75th Avenue, 5f | 2026-05-08 | $330,000 | — | — |
| 211-02 75th Avenue, 4n | 2026-03-20 | $240,000 | — | — |
Record activity
Compliance calculated
| Open violations | 103 |
|---|---|
| Open per residential unit | 0.2 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $3,000.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 815 |
|---|---|
| Permits / alterations | 148 |
| Recorded documents | 250 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Wp Owners Corp. |
|---|---|
| Parcel | 4077480500 |
| Block | 7748 |
| Lot | 500 |
| Mortgage on record | $34,250,000 (2016) — Capital One Multifamily Finance, LLC — note assigned |
Last recorded transfer
| Date | 16 Apr 1974 |
|---|---|
| Recorded price | $0 |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 19 Oct 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| 19 Oct 2026 | Housing | B | NOV SENT OUT | — | 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| 19 Oct 2026 | Housing | A | NOV SENT OUT | — | 27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/Housing/SERVICES-AND-INFOR |
| 13 Oct 2026 | Housing | C | NOV SENT OUT | — | 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT HOPPER DOOR INSIDE COMPACTOR CLOSET AT PUBLIC HALL AT CELLAR |
| 13 Oct 2026 | Housing | C | NOV SENT OUT | — | 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT COMPACTOR CLOSET AT PUBLIC HALL AT CELLAR |
| 13 Oct 2026 | Housing | C | NOV SENT OUT | — | 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT FIRE STAIRS EXIT DOOR 2ND FROM WEST AT NORTH AT WEST WALL AT PUBLIC HALL AT CELLAR |
| 13 Oct 2026 | Housing | A | NOV SENT OUT | — | 27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/Housing/SERVICES-AND-INFOR |
| 13 Oct 2026 | Housing | C | NOV SENT OUT | — | 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT LAUNDRY ROOM AT PUBLIC HALL AT CELLAR |
| 13 Oct 2026 | Housing | C | NOV SENT OUT | — | 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AND LATCH SET IN THE ENTRANCE LOCATED AT COMPACTOR CLOSET, 2nd STORY |
| 9 Oct 2026 | Housing | C | NOV SENT OUT | — | 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT COMPACTOR CLOSET, 1st STORY |
| 6 Oct 2026 | Housing | A | NOV CERTIFIED ON TIME | — | 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING AT COMPACTOR CLOSET, 5th STORY |
| 25 Sep 2026 | Building | Benchmarking - a local law | Active | — | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| 14 Sep 2026 | Housing | C | NOT COMPLIED WITH | — | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| 14 Sep 2026 | Housing | A | NOV CERTIFIED ON TIME | — | 27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/Housing/SERVICES-AND-INFOR |
| 4 Dec 2025 | Housing | C | NOV SENT OUT | — | 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 4, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTM |
| 6 Oct 2025 | Housing | C | FALSE CERTIFICATION | — | 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR FRAME AND LATCH AT COMPACTOR CLOSET DOOR AT PUBLIC HALL, 2nd STORY |
| 23 Sep 2025 | Housing | C | INVALID CERTIFICATION | — | 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES BATHTUB IN THE BATHROOM LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| 23 Sep 2025 | Housing | C | INVALID CERTIFICATION | — | 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASH BASIN IN THE BATHROOM LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| 25 Mar 2025 | Housing | B | NOT COMPLIED WITH | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH ASSEMBLY ON COMPACTOR CLOSET DOOR AT PUBLIC HALL, 5th STORY |
| 10 Mar 2025 | Housing | C | NOTICE OF ISSUANCE SENT TO TENANT | — | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| 5 Feb 2025 | Housing | B | INVALID CERTIFICATION | — | 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| 5 Feb 2025 | Housing | B | INVALID CERTIFICATION | — | 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| 5 Feb 2025 | Housing | C | INVALID CERTIFICATION | — | 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING |
| 31 Jan 2025 | Building | Gas Piping - a local law | Active | — | Cycle 1, Sub-cycle D (premises is in Community District 11 |
| 3 Jan 2025 | Housing | A | NOV SENT OUT | — | 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CONCRETE LANDING PAD UNDER DROP LADDER AT 1ST STACK FROM NORTH AT EAST AT FIRE ESCAPE |
| 3 Jan 2025 | Housing | A | NOV SENT OUT | — | 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CONCRETE LANDING PAD UNDER DROP LADDER AT 1ST STACK FROM EAST AT SOUTH (BUILDING FRONT) AT FIRE ESCAPE |
| 3 Jan 2025 | Housing | A | NOV SENT OUT | — | 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CONCRETE LANDING PAD UNDER DROP LADDER AT 1ST STACK FROM SOUTH AT WEST AT FIRE ESCAPE |
| 3 Jan 2025 | Housing | A | INVALID CERTIFICATION | — | 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/Housing. AT BASEMENT |
| 3 Jan 2025 | Housing | A | INVALID CERTIFICATION | — | 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT BASEMENT |
| 3 Jan 2025 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT 1ST FIRE DOOR FROM WEST AT NORTH LEADING TO STAIR A AT PUBLIC HALL, 1st STORY |
| 3 Jan 2025 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT 1ST FIRE DOOR FROM WEST AT NORTH LEADING TO STAIR A AT PUBLIC HALL, BASEMENT ENTRANCE STORY |
| 3 Jan 2025 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT 1ST FIRE DOOR LEADING FROM LOBBY TO LAUNDRY ROOM AT PUBLIC HALL, BASEMENT ENTRANCE STORY |
| 19 Dec 2024 | Housing | A | NOV SENT OUT | — | 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY |
| 19 Dec 2024 | Housing | A | NOV SENT OUT | — | 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY |
| 19 Dec 2024 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT DOOR AT COMPACTOR CLOSET, 1st STORY |
| 13 Dec 2024 | Housing | C | NOV CERTIFIED LATE | — | 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR FRAME AND LATCH, ENTRANCE DOOR AT COMPACTOR CLOSET, 6th STORY |
| 13 Dec 2024 | Housing | B | INVALID CERTIFICATION | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH, ENTRANCE DOOR AT COMPACTOR CLOSET, 6th STORY |
| 13 Dec 2024 | Housing | C | NOV CERTIFIED LATE | — | 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING STRING AND HOOK, ENTRANCE DOOR TO LAUNDRY ROOM AT CELLAR |
| 13 Dec 2024 | Housing | C | NOV CERTIFIED LATE | — | 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR FRAME AT ENTRANCE DOOR TO LAUNDRY ROOM AT CELLAR |
| 13 Dec 2024 | Housing | C | NOV SENT OUT | — | 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING WOOD WEDGE, FIRE DOOR TO WEST SERVICE AREA TO COMPACTOR ROOM AT CELLAR |
| 13 Dec 2024 | Housing | C | NOV SENT OUT | — | 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING WOOD WEDGE AT NORTH FIRE DOOR TO LAUNDRY AREA AT CELLAR |
| 16 Oct 2024 | Housing | B | NOV SENT OUT | — | 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE ENTRANCE LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| 16 Oct 2024 | Housing | C | NOV SENT OUT | — | 27-2005, 2007 HMC: REMOVE THE ILLEGAL DOUBLE CYLINDER KEY OPERATED LOCKING DEVICE AT DOOR .. IN THE ENTRANCE LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| 16 Oct 2024 | Housing | C | NOV SENT OUT | — | 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER 133F AT SINK IN THE KITCHEN LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| 16 Oct 2024 | Housing | B | NOV SENT OUT | — | 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| 16 Oct 2024 | Housing | B | NOV SENT OUT | — | 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| 16 Oct 2024 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| 16 Oct 2024 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| 16 Oct 2024 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| 16 Oct 2024 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL VENTILATION SYSTEM AT SOUTH WALL AT LAUNDRY ROOM |
Showing the 50 most recent of 103. The full set is available in the interactive report.
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 11 Oct 2026 | TOILET | PLUMBING | Closed | 17 Oct 2026 |
| 11 Oct 2026 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 12 Oct 2026 |
| 11 Oct 2026 | WATER SUPPLY | PLUMBING | Closed | 12 Oct 2026 |
| 9 Oct 2026 | DOOR | DOOR/WINDOW | Open | — |
| 28 Sep 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 28 Sep 2026 |
| 28 Sep 2026 | SIGNAGE MISSING | GENERAL | Closed | 10 Oct 2026 |
| 28 Sep 2026 | GARBAGE/RECYCLING STORAGE | UNSANITARY CONDITION | Closed | 10 Oct 2026 |
| 28 Sep 2026 | PAVEMENT | OUTSIDE BUILDING | Closed | 10 Oct 2026 |
| 28 Sep 2026 | STAIRS | FLOORING/STAIRS | Closed | 10 Oct 2026 |
| 28 Sep 2026 | MAINTENANCE | ELEVATOR | Closed | 10 Oct 2026 |
| 25 Sep 2026 | PESTS | UNSANITARY CONDITION | Closed | 16 Oct 2026 |
| 25 Sep 2026 | PESTS | UNSANITARY CONDITION | Closed | 5 Oct 2026 |
| 17 Sep 2026 | Chemical Vapors/Gases/Odors | Indoor Air Quality | Closed | 18 Sep 2026 |
| 4 Sep 2026 | DOOR | DOOR/WINDOW | Closed | 5 Oct 2026 |
| 4 Sep 2026 | Branch Cracked and Will Fall | Damaged Tree | Closed | 4 Sep 2026 |
| 3 Sep 2026 | Branch Cracked and Will Fall | Damaged Tree | Closed | 4 Sep 2026 |
| 3 Sep 2026 | Branch Cracked and Will Fall | Damaged Tree | Closed | 4 Sep 2026 |
| 2 Sep 2026 | Blocked - Construction | Sidewalk Condition | Closed | 8 Sep 2026 |
| 30 Aug 2026 | Trash | Dirty Condition | Closed | 31 Aug 2026 |
| 25 Aug 2026 | PESTS | UNSANITARY CONDITION | Closed | 11 Sep 2026 |
| 23 Aug 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 23 Aug 2026 |
| 14 Aug 2026 | PESTS | UNSANITARY CONDITION | Closed | 11 Sep 2026 |
| 4 Aug 2026 | GARBAGE/RECYCLING STORAGE | UNSANITARY CONDITION | Closed | 29 Aug 2026 |
| 1 Aug 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 1 Aug 2026 |
| 30 Jul 2026 | Catch Basin Clogged | Sewer Maintenance | Closed | 31 Jul 2026 |
| 27 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 27 Jul 2026 |
| 24 Jul 2026 | Elevator - Single Device On Property/No Alternate Service | Elevator | Closed | 1 Oct 2026 |
| 13 Jul 2026 | Storage Area Not Provided | Residential Disposal Complaint | Closed | 14 Jul 2026 |
| 13 Jul 2026 | PESTS | UNSANITARY CONDITION | Closed | 29 Aug 2026 |
| 13 Jul 2026 | WATER SUPPLY | PLUMBING | Closed | 8 Sep 2026 |
| 13 Jul 2026 | PESTS | UNSANITARY CONDITION | Closed | 8 Sep 2026 |
| 13 Jul 2026 | PESTS | UNSANITARY CONDITION | Closed | 8 Sep 2026 |
| 13 Jul 2026 | BATHTUB/SHOWER | PLUMBING | Closed | 8 Sep 2026 |
| 1 Jul 2026 | DOOR | DOOR/WINDOW | Closed | 28 Aug 2026 |
| 26 Jun 2026 | COOKING GAS | GENERAL | Closed | 29 Aug 2026 |
| 9 Jun 2026 | Blocked - Construction | Street Condition | Closed | 11 Jun 2026 |
| 6 May 2026 | COOKING GAS | GENERAL | Closed | 31 Aug 2026 |
| 16 Apr 2026 | HEAVY FLOW | WATER LEAK | Closed | 8 Sep 2026 |
| 9 Mar 2026 | Blocked Sidewalk | Illegal Parking | Closed | 9 Mar 2026 |
| 3 Mar 2026 | DOOR | DOOR/WINDOW | Closed | 23 Mar 2026 |
| 28 Feb 2026 | Boiler - Defective/Inoperative/No Permit | Boilers | Closed | 11 Mar 2026 |
| 19 Feb 2026 | DOOR | DOOR/WINDOW | Closed | 23 Mar 2026 |
| 13 Feb 2026 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 18 Feb 2026 |
| 9 Feb 2026 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 16 Feb 2026 |
| 9 Feb 2026 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 14 Feb 2026 |
| 8 Feb 2026 | Boiler - Defective/Inoperative/No Permit | Boilers | Closed | 27 Mar 2026 |
| 8 Feb 2026 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 13 Feb 2026 |
| 8 Feb 2026 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 13 Feb 2026 |
| 4 Feb 2026 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 7 Feb 2026 |
| 4 Feb 2026 | DOOR | DOOR/WINDOW | Closed | 23 Mar 2026 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 11 Jun 2025 | A2 | ISSUED | — |
| 31 May 2024 | Suspended Scaffold | Permit Issued | INSTALLATION OF OUTRIGGER FOR FACADE REPAIR |
| 23 May 2024 | General Construction | Permit Issued | Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress |
| 14 Dec 2023 | General Construction | Permit Issued | FILED TO CORRECT THE CURRENT C/O. THE AMOUNT OF DWELLING UNITS ON THE CO. THE FRONT OF THE CO LIST 104 DWELLING UNITS. AND THE BACK HAS THE CORRECT AMOUNT OF 106 DWELLING UNITS . ALL WORK HAS BEEN COMPLETED AND SIGNED OFF UNDER JOB APPLICATION 402122895 |
| 21 Feb 2023 | General Construction | Signed-off | ALTERATION IN APARTMENT 5H, WORK TO INCLUDE REMOVAL OF SOME PARTITIONS, ERECTION OF NEW PARTITIONS, REPLACEMENT OF PLUMBING FIXTURES. NO CHANGE IN USE , EGRESS OR OCCUPANCY |
| 3 Nov 2022 | Structural | Permit Issued | Filing for column replacement in 1 story garage, No change in use, occupancy or egress |
| 21 Oct 2022 | General Construction | Signed-off | Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress |
| 12 Oct 2022 | Sidewalk Shed | Signed-off | PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 12 Oct 2022 | Sidewalk Shed | Signed-off | PROPOSED INSTALLATION OF A TEMPORARY SIDEWALK SHED AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 29 Jul 2022 | General Construction | Signed-off | Filing facade repair as per plans filed herewith. No change in use, occupancy or egress |
| 13 Jul 2022 | Sidewalk Shed | Signed-off | proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2014 codes, chapter 33. no change in use, egress or occupancy |
| 7 Jan 2022 | Structural | Permit Issued | Filing to repair structural column as per plans filed herewith. No change in use, occupancy or egress |
| 4 Jan 2022 | General Construction | Signed-off | Filing for facade repair as per plans filed herewith. No change to use, occupancy or egress |
| 23 Dec 2021 | General Construction | Signed-off | Filing for facade repairs as per plans filed herewith. No change in use, occupancy or egress |
| 21 Dec 2021 | Supported Scaffold | Signed-off | PROPOSED INSTALLATIONOF A TEMPORARY PIPE SCAFFOLDING AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGES IN USE, EGRSS OROCCUPANCY |
| 18 May 2021 | General Construction | Signed-off | decommission of existing nycwin telecom site. remove all antennas and equipment from the roof. no change in use, egress or occupancy. original installation approved under application # 410055023 |
| 12 Nov 2019 | A1 | ISSUED | — |
| 5 Jun 2019 | A2 | ISSUED | — |
| 3 Oct 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 3 Oct 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 15 Sep 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 15 Sep 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 15 Aug 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 15 Aug 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 3 Aug 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 3 Aug 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 25 Jul 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 24 Jul 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 25 Jun 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 25 Jun 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 27 Dec 2016 | A3 | ISSUED | — |
| 21 Oct 2016 | A3 | ISSUED | — |
| 23 Oct 2015 | A2 | ISSUED | — |
| 23 Sep 2015 | A2 | ISSUED | — |
| 22 Sep 2015 | A2 | ISSUED | — |
| 22 Sep 2015 | A2 | ISSUED | — |
| 19 Aug 2015 | A3 | ISSUED | — |
| 17 Aug 2015 | A3 | ISSUED | — |
| 17 Aug 2015 | A3 | ISSUED | — |
| 30 Jul 2015 | A3 | ISSUED | — |
| 16 Jul 2015 | A2 | ISSUED | — |
| 16 Jul 2015 | A2 | ISSUED | — |
| 15 Jul 2015 | A3 | ISSUED | — |
| 13 Jul 2015 | A3 | ISSUED | — |
| 13 Jul 2015 | A2 | ISSUED | — |
| 29 Jun 2015 | A3 | ISSUED | — |
| 23 Jun 2015 | A3 | ISSUED | — |
| 18 Jun 2015 | A2 | ISSUED | — |
| 18 Jun 2015 | A2 | ISSUED | — |
| 18 Jun 2015 | A2 | ISSUED | — |
Showing the 50 most recent of 148. The full set is available in the interactive report.
Recorded documents
Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.
| Recorded | Type | Amount | From | To |
|---|---|---|---|---|
| 3 Oct 2016 | Assignment | — | — | — |
| 30 Sep 2016 | RPTT&RET | $371,000 | — | — |
| 28 Sep 2016 | RPTT&RET | $182,000 | — | — |
| 22 Sep 2016 | RPTT&RET | $155,000 | — | — |
| 20 Sep 2016 | RPTT&RET | $160,500 | — | — |
| 6 Sep 2016 | RPTT&RET | $325,000 | — | — |
| 30 Aug 2016 | RPTT&RET | $270,000 | — | — |
| 28 Jul 2016 | RPTT&RET | $150,000 | — | — |
| 23 Jun 2016 | RPTT&RET | $181,000 | — | — |
| 23 Jun 2016 | RPTT&RET | $335,000 | — | — |
| 21 Jun 2016 | RPTT&RET | $190,000 | — | — |
| 13 Jun 2016 | RPTT&RET | $171,500 | — | — |
| 2 Jun 2016 | RPTT&RET | $415,000 | — | — |
| 4 May 2016 | RPTT&RET | $180,000 | — | — |
| 21 Apr 2016 | RPTT&RET | $381,000 | — | — |
| 8 Apr 2016 | RPTT&RET | $187,500 | — | — |
| 5 Apr 2016 | RPTT&RET | $170,000 | — | — |
| 17 Mar 2016 | RPTT&RET | $170,000 | — | — |
| 10 Mar 2016 | RPTT&RET | $320,000 | — | — |
| 9 Mar 2016 | RPTT&RET | $175,000 | — | — |
| 12 Feb 2016 | RPTT&RET | $152,100 | — | — |
| 9 Feb 2016 | RPTT&RET | $320,000 | — | — |
| 30 Dec 2015 | RPTT&RET | $170,000 | — | — |
| 17 Dec 2015 | RPTT&RET | $325,000 | — | — |
| 16 Nov 2015 | RPTT&RET | $173,500 | — | — |
| 6 Nov 2015 | RPTT&RET | $158,000 | — | — |
| 15 Oct 2015 | RPTT&RET | $165,000 | — | — |
| 8 Oct 2015 | RPTT&RET | $173,000 | — | — |
| 5 Oct 2015 | RPTT&RET | $175,000 | — | — |
| 15 Sep 2015 | RPTT&RET | $175,000 | — | — |
| 10 Aug 2015 | RPTT&RET | $42,500 | — | — |
| 3 Aug 2015 | RPTT&RET | $320,000 | — | — |
| 31 Jul 2015 | RPTT&RET | $153,000 | — | — |
| 29 Jun 2015 | RPTT&RET | $170,000 | — | — |
| 26 Jun 2015 | RPTT&RET | $367,000 | — | — |
| 4 Jun 2015 | RPTT&RET | $320,000 | — | — |
| 29 May 2015 | RPTT&RET | $320,000 | — | — |
| 1 May 2015 | RPTT&RET | $185,000 | — | — |
| 27 Mar 2015 | RPTT&RET | $165,000 | — | — |
| 25 Mar 2015 | RPTT&RET | — | — | — |
| 19 Mar 2015 | RPTT&RET | $165,000 | — | — |
| 11 Mar 2015 | RPTT&RET | $165,000 | — | — |
| 9 Feb 2015 | RPTT&RET | $165,000 | — | — |
| 22 Jan 2015 | RPTT&RET | $263,000 | — | — |
| 23 Dec 2014 | RPTT&RET | $150,000 | — | — |
| 17 Dec 2014 | RPTT&RET | — | — | — |
| 4 Dec 2014 | RPTT&RET | $170,000 | — | — |
| 2 Dec 2014 | RPTT&RET | $325,000 | — | — |
| 26 Nov 2014 | RPTT&RET | $161,000 | — | — |
| 15 Nov 2014 | RPTT&RET | $375,000 | — | — |
Showing the 50 most recent of 150. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 33 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.