26-50 1st Street
Analysis
The building is new and risk‑free from code or legal issues, but the lack of a recent arm‑length sale and the large amount of unused buildable area limit price certainty and future expansion potential.
The good
- Built in 2023, so all systems and finishes are brand new
- Low assessed risk with no open violations, penalties, or legal proceedings
- Zero enforcement and safety violation penalties, meaning no hidden debt from code issues
- Market value on record ($63.8 M) far exceeds assessed value ($28.7 M), indicating strong valuation
The bad
- Last recorded sale price of $10 and no arm‑length sale means there is no recent market transaction to benchmark price
- Unused buildable square footage of 599,100 sq ft suggests the site cannot be expanded despite remaining zoning capacity
- High assessed‑value change of 1345.6 % may signal a recent reassessment shock, which could affect future taxes
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Unused development capacity on the lot
Built floor-area ratio is 2.45 against a permitted 6.50, leaving 4.05 of unused ratio — roughly 599,100 sq ft of buildable area on a lot of 147,926 sq ft. Treat that as a ceiling under the floor-area rules, not a plan: height limits, setbacks, lot coverage, landmark status and sitting tenants can each reduce it, in some cases to nothing.
No open violations on record
Nothing is currently outstanding against this property. Closed violations are not counted here — a violation that was raised and then fixed is a problem that went away, and an older building will have accumulated many of them. What matters is what is still open, and here that is nothing.
No arm's-length sale on record
The last recorded transfer is dated 21 Nov 2023 at a recorded price of $10. Transfers between related parties, estate settlements and corrective filings are legitimately recorded at nominal amounts, so this is neither an error nor a bargain — it means there is no usable sale price here, and every ratio derived from one (price per unit, price against assessed value) is therefore withheld rather than shown as zero.
Assessed value trend
Assessed value has risen 1,345.6% across the 5 assessment years on record (2023 to 2027), standing at $28,714,050. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.
Development & zoning
Floor-area ratio
| Built | 2.45 |
|---|---|
| Residential limit | 5.00 |
| Commercial limit | 0.00 |
| Community-facility limit | 6.50 |
Development headroom (calculated) calculated
| Highest permitted ratio | 6.50 |
|---|---|
| Unused ratio | 4.05 |
| Unused buildable area | 599,100 sq ft |
| Lot area | 147,926 sq ft |
Value & taxes
Assessment
| Assessed total | $28,714,050 |
|---|---|
| Assessed land | $4,451,850 |
| Assessed building | $24,262,200 |
| Market value on record | $63,809,000 |
| Assessed as % of market | 45.0% |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $28,706,028 |
| Tax rate | 12.502% |
| Estimated annual levy | $3,588,827.62 |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $28,714,050 | — |
| 2026 | $21,992,400 | +30.6% |
| 2025 | $9,433,350 | +133.1% |
| 2024 | $4,451,850 | +111.9% |
| 2023 | $1,986,300 | +124.1% |
Building & occupancy
Structure
| Year built | 2023 |
|---|---|
| Floors | 26 |
| Building area | 362,533 sq ft |
| Residential area | 326,590 sq ft |
| Commercial area | 35,943 sq ft |
Occupancy
| Total units | 295 |
|---|---|
| Residential units | 294 |
| Rent-stabilized | 647 |
| Residential Avg unit size | 1,111 sq ft (calculated) |
| Commercial Avg unit size | 35,943 sq ft (calculated) |
| Building class | D6 |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | 96 St (Q) — 0.79 mi |
|---|---|
| School district | 30 |
| Police precinct | 114 |
| Nearest firehouse | Engine 262 — 30-89 21st Street |
Location risk
| Flood zone | High-risk (Zone AE) |
|---|---|
| Hurricane evacuation zone | Zone 1 |
| Projected floodplain | In the projected 2050s floodplain |
| Environmental restriction | Hazardous materials, air quality, noise |
Record activity
Compliance calculated
| Open violations | 0 |
|---|---|
| Open per residential unit | 0.0 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $0.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 150 |
|---|---|
| Permits / alterations | 59 |
| Recorded documents | 72 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Halletts Building 3 Spe LLC |
|---|---|
| Parcel | 4009160010 |
| Block | 916 |
| Lot | 10 |
| Mortgage on record | $56,208,247 (2024) |
| Fixture liens | 4 active fixture liens |
Last recorded transfer
| Date | 21 Nov 2023 |
|---|---|
| Recorded price | $10 |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 8 Aug 2026 | Loud Music/Party | Noise - Residential | Closed | 9 Aug 2026 |
| 28 Jul 2026 | Unleashed Dog in Public | Unleashed Dog | Closed | 4 Aug 2026 |
| 26 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 26 Jul 2026 |
| 25 Jul 2026 | Blocked Bike Lane | Illegal Parking | Closed | 25 Jul 2026 |
| 21 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 21 Jul 2026 |
| 20 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 21 Jul 2026 |
| 17 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 17 Jul 2026 |
| 16 Jul 2026 | In Public | Drinking | Closed | 16 Jul 2026 |
| 16 Jul 2026 | Allowed in Smoke Free Area | Smoking or Vaping | In Progress | — |
| 13 Jul 2026 | Beach/Pool Water | Beach/Pool/Sauna Complaint | Closed | 28 Jul 2026 |
| 11 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 12 Jul 2026 |
| 11 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 12 Jul 2026 |
| 2 Jul 2026 | Unauthorized Bus Layover | Illegal Parking | Closed | 2 Jul 2026 |
| 30 Jun 2026 | No Parking, Standing, Stopping | Street Sign - Missing | In Progress | — |
| 30 Jun 2026 | Blocked Sidewalk | Illegal Parking | Closed | 30 Jun 2026 |
| 29 Jun 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 29 Jun 2026 |
| 28 Jun 2026 | Blocked Hydrant | Illegal Parking | Closed | 29 Jun 2026 |
| 25 Jun 2026 | No Parking, Standing, Stopping | Street Sign - Dangling | Closed | 8 Jul 2026 |
| 19 Jun 2026 | No Access | Blocked Driveway | Closed | 19 Jun 2026 |
| 17 Jun 2026 | Blocked Sidewalk | Illegal Parking | Closed | 17 Jun 2026 |
| 15 Jun 2026 | Partial Access | Blocked Driveway | Closed | 15 Jun 2026 |
| 15 Jun 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 15 Jun 2026 |
| 15 Jun 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 15 Jun 2026 |
| 13 Jun 2026 | No Access | Blocked Driveway | Closed | 13 Jun 2026 |
| 13 Jun 2026 | Partial Access | Blocked Driveway | Closed | 13 Jun 2026 |
| 12 Jun 2026 | No Access | Blocked Driveway | Closed | 12 Jun 2026 |
| 11 Jun 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 11 Jun 2026 |
| 7 Jun 2026 | Facility Maintenance | Beach/Pool/Sauna Complaint | Closed | 26 Jun 2026 |
| 26 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 26 May 2026 |
| 23 May 2026 | No Access | Blocked Driveway | Closed | 23 May 2026 |
| 22 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 22 May 2026 |
| 15 May 2026 | Blocked Sidewalk | Illegal Parking | Closed | 15 May 2026 |
| 30 Apr 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 30 Apr 2026 |
| 27 Apr 2026 | Partial Access | Blocked Driveway | Closed | 27 Apr 2026 |
| 25 Apr 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 25 Apr 2026 |
| 25 Apr 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 25 Apr 2026 |
| 25 Apr 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 25 Apr 2026 |
| 23 Apr 2026 | Chronic | Homeless Person Assistance | Closed | 23 Apr 2026 |
| 2 Apr 2026 | Stop | Street Sign - Damaged | Closed | 3 Apr 2026 |
| 30 Mar 2026 | Banging/Pounding | Noise - Residential | Closed | 31 Mar 2026 |
| 16 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 16 Mar 2026 |
| 14 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 14 Mar 2026 |
| 13 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 13 Mar 2026 |
| 8 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 8 Mar 2026 |
| 8 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 8 Mar 2026 |
| 28 Feb 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 28 Feb 2026 |
| 26 Feb 2026 | Blocked Sidewalk | Illegal Parking | Closed | 26 Feb 2026 |
| 20 Feb 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 20 Feb 2026 |
| 18 Feb 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 18 Feb 2026 |
| 12 Feb 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 12 Feb 2026 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 2 Jan 2025 | Plumbing | Permit Issued | FILED IN CONJUCTION WITH BIS NEW BUILDING APPLICATION 421476931. New Plumbing/Sprinkler/Standpipe fixtures to be installed throughout the entire building |
| 10 Oct 2024 | Boiler Equipment | Signed-off | Installation of eight new conventional type gas fired boilers as per plans filed herewith. No change in use, egress occupancy. Work to be filed in conjunction to new building 421476931 |
| 25 Sep 2024 | Curb Cut | Signed-off | New Curb cut for accessing the trash compactor/recycling loading dock as per plans filed herewith. Work to be filed in conjunction to new building application 421476931 |
| 25 Sep 2024 | Curb Cut | Signed-off | New curb curt to access the main vehicular driveway between Halletts Point Building 20 & 30 as per plans filed herewith. Work to be filed in conjunction to new building application 421476931 |
| 1 Aug 2024 | General Construction | Signed-off | This application is filed for a Temporary office space (temp use permit) as per plans filed herewith in conjunction to the new building application #421476931. Filing fees captured under NB application number 421476931 |
| 29 Jul 2024 | Foundation | Signed-off | FOUNDATION FOR THE MIXED-USE BUILDING AS PER PLANS FILED HEREWITH IN CONJUNCTION TO THE NEW BUILDING APPLICATION #421476931. FILING FEES CAPTURED UNDER NB APPLICATION NUMBER 421476931 |
| 14 Jun 2024 | Protection and Mechanical Methods | Signed-off | USE OF TEMPORARY MINI CRANE CONSTRUCTION EQUIPMENT DURING NEW BUILDING CONSTRUCTION, AS PER PLANS FILED HEREWITH. THIS APPLICATION IS FILED IN CONJUNCTION WITH Building# 421476931 |
| 13 Jun 2024 | Protection and Mechanical Methods | Signed-off | TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 22 May 2024 | Protection and Mechanical Methods | Signed-off | USE OF TELEHANDLER DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 421476931 |
| 14 May 2024 | Protection and Mechanical Methods | Signed-off | USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 421476931 |
| 14 May 2024 | Protection and Mechanical Methods | Signed-off | USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 421476931 |
| 29 Apr 2024 | Plumbing | Signed-off | Design/Installation of a water reuse facility per Appendix C of the NYC Plumbing Code. No change in use, egress, or occupancy. Work filed in conjunction to new building 421476931 |
| 2 Feb 2024 | Boiler Equipment | Signed-off | Installation of eight new conventional type gas fired boilers as per plans filed herewith. No change in use, egress occupancy. Work to be filed in conjunction to new building 421476931 |
| 2 Feb 2024 | Protection and Mechanical Methods | Signed-off | USE OF TELEHANDLER DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 421476931 |
| 9 Jan 2024 | Suspended Scaffold | Signed-off | INSTALLATION OF A TEMPORARY ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022 |
| 4 Dec 2023 | Protection and Mechanical Methods | Signed-off | TEMPORARY OVERHEAD PROTECTION DURING NB CONST, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 4 Dec 2023 | Protection and Mechanical Methods | Signed-off | HOIST CAR 2&3: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEP |
| 4 Dec 2023 | Protection and Mechanical Methods | Signed-off | HOIST CAR 6: INSTALLATION OF SINGLE 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEP |
| 1 Nov 2023 | Plumbing | Signed-off | CIVIL PLUMBING FOR RESIDENTIAL BUILDING, AS PER PLANS FILED HEREWITH. WORK TO BE FILED IN CONJUNCTION TO NEW BUILDING APPLICATION 421476931 |
| 26 Oct 2023 | Standpipe | Signed-off | FILED IN CONJUCTION WITH BIS NEW BUILDING APPLICATION 421476931 |
| 29 Sep 2023 | Supported Scaffold | Signed-off | TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 27 Sep 2023 | Protection and Mechanical Methods | Signed-off | HOIST CAR 1: INSTALLATION OF SINGLE 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY |
| 27 Sep 2023 | Protection and Mechanical Methods | Signed-off | HOIST CAR 4&5: INSTALLATION OF DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEP |
| 11 May 2023 | Protection and Mechanical Methods | Signed-off | USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 421476931 |
| 11 May 2023 | Protection and Mechanical Methods | Signed-off | USE OF MINI CRANE DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER 421476931 |
| 22 Apr 2023 | Protection and Mechanical Methods | Signed-off | CARS 1, 2 & 3) TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. HOIST & ELEVATOR APPL. SUBMITTED SEP |
| 21 Apr 2023 | Protection and Mechanical Methods | Signed-off | CARS 4 & 5) TEMPORARY HOIST RUN-BACK STRUCTURE DURING NB CONST, FILED SEP. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. HOIST & ELEVATOR APPL. SUBMITTED SEP |
| 12 Apr 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION AND USE OF TEMPORARY ULMA PLATFORMS AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 12 Apr 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 13 Mar 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION AND USE OF TEMPORARY LOADING PLATFORMS AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 25 Feb 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION AND USE OF TEMPORARY LOADING PLATFORMS AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 21 Feb 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 7 Feb 2023 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 29 Dec 2022 | Protection and Mechanical Methods | Signed-off | INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORM AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 15 Dec 2022 | NB | ISSUED | — |
| 26 Oct 2022 | Construction Fence | Signed-off | INSTALLATION OF CONSTRUCTION FENCE DURING NB CONST, FILED SEP. FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC. OR EGRESS UNDER THIS APP. FENCE INSTALLED ON SW/RDWY. DOT PERMITS BY OTHERS. CITY CANVAS PROJECT. SEP AGREEMENT ON SITE |
| 11 Oct 2022 | NB | ISSUED | — |
| 29 Sep 2022 | Plumbing | Signed-off | NEW BUILDING: UNDERGROUND PLUMBING FOR RESIDENTIAL BUILDING, AS PER PLANS FILED HEREWITH. WORK TO BE FILED IN CONJUNCTION TO NEW BUILDING APPLICATION 421476931 |
| 19 Dec 2019 | A2 | ISSUED | — |
| 28 Aug 2018 | Construction Fence | Signed-off | INSTALLATION OF PLYWOOD FENCE AS PER PLANS.PLY WOOD FENCE COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 29 Dec 2017 | A2 | ISSUED | — |
| 26 May 2017 | DM | ISSUED | — |
| 25 May 2017 | DM | ISSUED | — |
| 21 Sep 2015 | A3 | ISSUED | — |
| 29 May 2002 | A2 | ISSUED | — |
| 29 May 2002 | A2 | ISSUED | — |
| 29 May 2002 | A2 | ISSUED | — |
| 18 Dec 2000 | DM | ISSUED | — |
| 18 Dec 2000 | DM | ISSUED | — |
| 18 Dec 2000 | DM | ISSUED | — |
Showing the 50 most recent of 59. The full set is available in the interactive report.
Recorded documents
Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.
| Recorded | Type | Amount | From | To |
|---|---|---|---|---|
| 27 Jan 2025 | CERT | — | — | — |
| 31 Dec 2024 | RPTT&RET | — | — | — |
| 20 Nov 2024 | EASE | — | — | — |
| 26 Jun 2024 | Assignment | — | — | — |
| 26 Jun 2024 | DECL | — | — | — |
| 26 Jun 2024 | Assignment | — | — | — |
| 26 Jun 2024 | Agreement | $16,139,100 | — | — |
| 26 Jun 2024 | Mortgage | $56,208,247 | — | — |
| 26 Jun 2024 | Agreement | $56,208,247 | — | — |
| 26 Jun 2024 | Mortgage | $16,139,100 | — | — |
| 17 May 2024 | Mortgage | $16,434,299 | — | — |
| 17 May 2024 | Mortgage | $2,333,164 | — | — |
| 10 Apr 2024 | Mortgage | $3,304,306 | — | — |
| 10 Apr 2024 | Mortgage | $15,580,885 | — | — |
| 2 Apr 2024 | Mortgage | $27,760,903 | — | — |
| 2 Apr 2024 | M&CON | $92,239,097 | — | — |
| 21 Nov 2023 | Deed | $10 | — | — |
| 13 Nov 2023 | SMIS | — | — | — |
| 23 Aug 2023 | SMIS | — | — | — |
| 6 Jan 2022 | SMIS | — | — | — |
| 4 Jun 2018 | EASE | — | — | — |
| 4 Jun 2018 | CERT | — | — | — |
| 4 Jun 2018 | SMIS | — | — | — |
| 4 Jun 2018 | DEVR | $1,687,500 | — | — |
| 12 Oct 2017 | Deed | — | — | — |
| 1 Sep 2017 | SMIS | — | — | — |
| 21 Aug 2017 | SAGE | — | — | — |
| 3 Aug 2017 | CERT | — | — | — |
| 3 Aug 2017 | SMIS | — | — | — |
| 3 Aug 2017 | SMIS | — | — | — |
| 3 Aug 2017 | SMIS | — | — | — |
| 3 Aug 2017 | DEVR | — | — | — |
| 15 Jul 2016 | SMIS | — | — | — |
| 5 Jul 2016 | RPTT&RET | — | — | — |
| 13 Nov 2015 | SMIS | — | — | — |
| 27 Oct 2015 | SMIS | — | — | — |
| 23 Oct 2015 | Release | — | — | — |
| 23 Oct 2015 | Release | — | — | — |
| 19 Oct 2015 | SMIS | — | — | — |
| 19 Oct 2015 | EASE | $10 | — | — |
| 19 Oct 2015 | SMIS | — | — | — |
| 18 Jun 2015 | RPTT&RET | $52,824,422 | — | — |
| 9 Jun 2015 | RPTT&RET | $88,306,636 | — | — |
| 28 Oct 2014 | Deed | — | — | — |
| 15 Oct 2014 | JUDG | — | — | — |
| 9 Oct 2014 | Deed | $58,000,000 | — | — |
| 12 Sep 2014 | MAPS | — | — | — |
| 4 Oct 2013 | SAGE | — | — | — |
| 15 Feb 2005 | AL&R | $2,500,000 | — | — |
| 15 Feb 2005 | Mortgage | $1,663,872 | — | — |
Showing the 50 most recent of 72. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 6 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.