Searching…

35-53 35 Avenue

Queens · Parcel 4003350002
579
Residential units
1959
Year built
502,525 sq ft
Building area
28
Open violations
$19,156,500
Assessed value

Analysis

AI-generated Risk: High

The building carries significant safety‑related financial exposure and cannot be expanded, outweighing its solid equity and zoning compliance.

The good

  • assessed value of $19,156,500 and market value on record of $42,570,000 indicate strong equity
  • built floor-area ratio of 1.19 is well below the residential limit of 1.5, showing compliance with zoning
  • no tax lien and no legal proceedings against the building
  • open violations per unit is 0, meaning the building’s violation count is not high relative to its size

The bad

  • safety violation penalties of $518,000 and 17 unpaid safety violations represent a material hidden debt
  • total of 28 open violations signals ongoing compliance issues
  • risk rating is high because penalties exceed $25,000
  • unused buildable square footage of 341,206 sq ft cannot be added to residential space, limiting expansion potential

Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.

What the numbers say

Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.

Unused development capacity on the lot

Built floor-area ratio is 1.19 against a permitted 2.00, leaving 0.81 of unused ratio — roughly 341,206 sq ft of buildable area on a lot of 421,242 sq ft. Treat that as a ceiling under the floor-area rules, not a plan: height limits, setbacks, lot coverage, landmark status and sitting tenants can each reduce it, in some cases to nothing.

Unresolved conditions on record

28 violations remain open across 579 residential units (about 0.0 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.

Assessed value trend

Assessed value has risen 31.5% across the 5 assessment years on record (2023 to 2027), standing at $19,156,500. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.

Development & zoning

Floor-area ratio

Built1.19
Residential limit1.50
Commercial limit0.00
Community-facility limit2.00

Development headroom (calculated) calculated

Highest permitted ratio2.00
Unused ratio0.81
Unused buildable area341,206 sq ft
Lot area421,242 sq ft

Value & taxes

Assessment

Assessed total$19,156,500
Assessed land$7,582,500
Assessed building$11,574,000
Market value on record$42,570,000
Assessed as % of market45.0%

Tax

Tax class2
Taxable assessed$19,156,500
Tax rate12.502%
Estimated annual levy$2,394,945.63
Tax exemption (assessed value)Nyc Housing Auth — $19,156,500 (through 2028)

The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.

Assessed value by year

YearAssessed valueChange
2027$19,156,500
2026$17,317,800+10.6%
2025$16,680,600+3.8%
2024$15,134,850+10.2%
2023$14,572,350+3.9%

Building & occupancy

Structure

Year built1959
Floors6
Building area502,525 sq ft
Residential area499,525 sq ft
Commercial area3,000 sq ft

Occupancy

Total units579
Residential units579
Residential Avg unit size863 sq ft (calculated)
Building classD1

Neighborhood, risk & energy

Neighborhood & transit

Nearest subway36 Av (N, W) — 0.35 mi
School district30
Police precinct114
Nearest firehouseEngine 260 — 11-15 37th Avenue

Location risk

Flood zoneMinimal hazard (Zone X)
Hurricane evacuation zoneZone 3
Evictions on record10 (most recent 2026)

Record activity

Compliance calculated

Open violations28
Open per residential unit0.0 (calculated)
Enforcement penalties$0.00
Safety-violation penaltiesNot available
Total penalties owed$518,000.00 (calculated)
On tax-lien sale listNo

Activity

Complaints recorded698
Permits / alterations177
Recorded documents3
Legal proceedings0

Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.

Ownership & last recorded sale

Owner of record

OwnerCity of New York
Parcel4003350002
Block335
Lot2
Fixture liens1 active fixture lien

Last recorded transfer

Date
Recorded price
Price per unitNot meaningful
Price vs assessedNot meaningful

Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.

Open violations

Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.

IssuedCategoryClassStatusAmount dueDescription
14 Nov 2025BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
23 Sep 2024BuildingBoilerActiveViolation Issued-Failure To File 2023 External Low Pressure Inspection Report
30 Jun 2023BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
30 Jun 2023BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
20 Jun 2023BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
20 Jun 2023BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
25 Apr 2023BuildingBoilerActiveVIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
2 Dec 2022EnforcementCLASS - 2ACTIVEFAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#910566.REMEDY:SUBMIT ACCEPTABLE REQUIRE
2 Dec 2022EnforcementCLASS - 2ACTIVEFAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#910561.REMEDY:SUBMIT ACCEPTABLE REQUIRE
2 Dec 2022EnforcementCLASS - 2ACTIVEFAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#910564.REMEDY:SUBMIT ACCEPTABLE REQUIRE
2 Dec 2022EnforcementCLASS - 2ACTIVEFAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#910654.REMEDY:SUBMIT ACCEPTABLE REQUIRE
2 Dec 2022EnforcementCLASS - 2ACTIVEFAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#912035.REMEDY:SUBMIT ACCEPTABLE REQUIRE
2 Dec 2022EnforcementCLASS - 2ACTIVEFAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#910563.REMEDY:SUBMIT ACCEPTABLE REQUIRE
2 Dec 2022EnforcementCLASS - 2ACTIVEFAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#910560.REMEDY:SUBMIT ACCEPTABLE REQUIRE
2 Dec 2022EnforcementCLASS - 2ACTIVEFAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#910565.REMEDY:SUBMIT ACCEPTABLE REQUIRE
2 Dec 2022EnforcementCLASS - 2ACTIVEFAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#910562.REMEDY:SUBMIT ACCEPTABLE REQUIRE
22 Feb 2022BuildingV-Building VIOLATION - ACTIVEFAILED TO FILE facade inspection CYCLE 9A TECHNICAL REPORT BY 02/21/2022
22 Feb 2022BuildingFacadesActiveFAILED TO FILE facade inspection CYCLE 9A TECHNICAL REPORT BY 02/21/2022
22 Feb 2022BuildingFacadesActiveFAILED TO FILE facade inspection CYCLE 9A TECHNICAL REPORT BY 02/21/2022
22 Feb 2022BuildingFacadesActiveFAILED TO FILE facade inspection CYCLE 9A TECHNICAL REPORT BY 02/21/2022
22 Feb 2022BuildingFacadesActiveFAILED TO FILE facade inspection CYCLE 9A TECHNICAL REPORT BY 02/21/2022
22 Feb 2022BuildingFacadesActiveFAILED TO FILE facade inspection CYCLE 9A TECHNICAL REPORT BY 02/21/2022
22 Feb 2022BuildingFacadesActiveFAILED TO FILE facade inspection CYCLE 9A TECHNICAL REPORT BY 02/21/2022
22 Feb 2022BuildingFacadesActiveFAILED TO FILE facade inspection CYCLE 9A TECHNICAL REPORT BY 02/21/2022
22 Feb 2022BuildingFacadesActiveFAILED TO FILE facade inspection CYCLE 9A TECHNICAL REPORT BY 02/21/2022
8 Nov 2019BuildingBoilerActiveVIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
6 Apr 2018BuildingBoilerActiveVIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
24 Feb 2017BuildingBoilerActiveVIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT

Complaints

A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.

DateProblemTypeStatusClosed
8 Aug 2026Loud Music/PartyNoise - ResidentialClosed8 Aug 2026
8 Aug 2026AlarmNoiseClosed11 Aug 2026
8 Aug 2026Loud Music/PartyNoise - Street/SidewalkClosed8 Aug 2026
5 Aug 2026Loud TalkingNoise - ResidentialClosed6 Aug 2026
4 Aug 2026TrespassingNon-Emergency Police MatterClosed5 Aug 2026
28 Jul 2026Loud Music/PartyNoise - ResidentialClosed28 Jul 2026
27 Jul 2026Loud Music/PartyNoise - ResidentialClosed27 Jul 2026
26 Jul 2026Loud Music/PartyNoise - ResidentialClosed26 Jul 2026
25 Jul 2026Loud Music/PartyNoise - ResidentialClosed26 Jul 2026
20 Jul 2026Loud Music/PartyNoise - ResidentialClosed20 Jul 2026
19 Jul 2026Loud TalkingNoise - ResidentialClosed19 Jul 2026
19 Jul 2026Loud TalkingNoise - Street/SidewalkClosed19 Jul 2026
17 Jul 2026Loud Music/PartyNoise - Street/SidewalkClosed17 Jul 2026
13 Jul 2026Loud TalkingNoise - ResidentialClosed13 Jul 2026
11 Jul 2026Loud Music/PartyNoise - Street/SidewalkClosed11 Jul 2026
11 Jul 2026Blocked Bike LaneIllegal ParkingClosed11 Jul 2026
6 Jul 2026TrespassingNon-Emergency Police MatterClosed6 Jul 2026
4 Jul 2026Double Parked Blocking VehicleIllegal ParkingClosed4 Jul 2026
30 Jun 2026Loud TalkingNoise - Street/SidewalkClosed30 Jun 2026
28 Jun 2026TorturedAnimal-AbuseClosed28 Jun 2026
26 Jun 2026Loud Music/PartyNoise - Street/SidewalkClosed26 Jun 2026
24 Jun 2026Non-ChronicHomeless Person AssistanceClosed24 Jun 2026
22 Jun 2026Loud Music/PartyNoise - ResidentialClosed22 Jun 2026
18 Jun 2026Loud TalkingNoise - ResidentialClosed18 Jun 2026
5 Jun 2026Loud TalkingNoise - Street/SidewalkClosed5 Jun 2026
2 Jun 2026Loud TalkingNoise - Street/SidewalkClosed2 Jun 2026
26 May 2026Loud Music/PartyNoise - ResidentialClosed26 May 2026
23 May 2026Loud Music/PartyNoise - ResidentialClosed23 May 2026
16 May 2026Loud Music/PartyNoise - Street/SidewalkClosed16 May 2026
13 May 2026Loud Music/PartyNoise - ResidentialClosed13 May 2026
10 May 2026Loud Music/PartyNoise - ResidentialClosed10 May 2026
10 May 2026Banging/PoundingNoise - ResidentialClosed10 May 2026
9 May 2026Loud Music/PartyNoise - ResidentialClosed9 May 2026
6 May 2026Loud TalkingNoise - Street/SidewalkClosed6 May 2026
3 May 2026Loud Music/PartyNoise - ResidentialClosed3 May 2026
28 Apr 2026N/AAsbestosClosed5 Jun 2026
25 Apr 2026Loud Music/PartyNoise - ResidentialClosed25 Apr 2026
24 Apr 2026Loud Music/PartyNoise - ResidentialClosed24 Apr 2026
24 Apr 2026Loud Music/PartyNoise - ResidentialClosed24 Apr 2026
19 Apr 2026Loud Music/PartyNoise - ResidentialClosed20 Apr 2026
19 Apr 2026Loud Music/PartyNoise - ResidentialClosed20 Apr 2026
18 Apr 2026Loud Music/PartyNoise - ResidentialClosed18 Apr 2026
16 Apr 2026Loud TelevisionNoise - ResidentialClosed16 Apr 2026
15 Apr 2026Loud Music/PartyNoise - ResidentialClosed15 Apr 2026
15 Apr 2026Loud Music/PartyNoise - ResidentialClosed15 Apr 2026
14 Apr 2026Banging/PoundingNoise - ResidentialClosed15 Apr 2026
14 Apr 2026Loud Music/PartyNoise - Street/SidewalkClosed14 Apr 2026
14 Apr 2026Loud Music/PartyNoise - Street/SidewalkClosed14 Apr 2026
14 Apr 2026Loud TalkingNoise - ResidentialClosed14 Apr 2026
12 Apr 2026Loud Music/PartyNoise - ResidentialClosed12 Apr 2026

Showing the 50 most recent of 150. The full set is available in the interactive report.

Permits & alterations

The absence of a permit does not prove no work was done — it may equally mean work was done without one.

IssuedTypeStatusWork
20 Nov 2025PlumbingSigned-offREMOVE AND REPLACE OR PROVIDE NEW SUMP PUMPS AND DISCHARGE LINES
24 Apr 2025PlumbingSigned-offSUBSEQUENT FILING FOR PL WORK - STORM/DRAINAGE PIPING, DRAINS, DRYWELL RETENTION
9 Apr 2025SolarPermit IssuedInstallation of 40.33 kw solar energy system on roof. No change of occupancy, use or egress
9 Apr 2025SolarPermit IssuedInstallation of 39.785 kw solar energy system on roof. No change occupancy, use or egress
9 Apr 2025SolarPermit IssuedInstallation of 80.66 kw solar energy system on roof. No change occupancy, use or egress
9 Apr 2025SolarPermit IssuedInstallation of 45.235 kw solar energy system on roof. No change of occupancy, use or egress
8 Apr 2025SolarPermit IssuedInstallation of 39.785 kw solar energy system on roof. No change of occupancy, use or egress
8 Apr 2025SolarPermit IssuedInstallation of 78.48 kw solar energy system on roof. No change of occupancy, use or egress
8 Apr 2025SolarPermit IssuedInstallation of 79.025 kw solar energy system on roof. No change of occupancy, use or egress
8 Apr 2025SolarPermit IssuedInstallation of 39.785 kw solar energy system on roof. No change of occupancy, use or egress
8 Apr 2025General ConstructionSigned-offInfrastructure to improve management of stormwater runoff from the tributary impervious surfaces. On-site Green Infrastructure Cloudburst Pilot Project. Environmental Capital Contract No. GQ-H-RAVE, Ravenswood Houses, NYCHA facility
21 Mar 2025Construction FenceSigned-offRAVENSWOOD HOUSES (BUILDING #13), INSTALLATION OF 125 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH Building # Q00455195 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
18 Mar 2025Construction FenceSigned-offRAVENSWOOD HOUSES (BUILDING #16), INSTALLATION OF 100 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH Building # Q00455218 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
18 Mar 2025Support of ExcavationSigned-offRAVENSWOOD HOUSES - BUILDING #15, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH Building # Q01010457. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
18 Mar 2025Construction FenceSigned-offRAVENSWOOD HOUSES (BUILDING #14), INSTALLATION OF 100 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH Building # Q00455204 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
12 Mar 2025Support of ExcavationSigned-offRAVENSWOOD HOUSES - BUILDING #9, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH Building # Q01010451. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
11 Feb 2025Support of ExcavationSigned-offRAVENSWOOD HOUSES - BUILDING #14, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH Building # Q01010456. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
7 Feb 2025Support of ExcavationSigned-offRAVENSWOOD HOUSES - BUILDING #13, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH Building # Q01010455. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
6 Feb 2025PlumbingSigned-offNYCHA BOILER_REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS
31 Jan 2025Support of ExcavationSigned-offRAVENSWOOD HOUSES - BUILDING #16, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH Building # Q01010458. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
10 Jan 2025StructuralPermit IssuedNYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
8 Jan 2025Support of ExcavationSigned-offRAVENSWOOD HOUSES - BUILDING #11, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH Building # Q00455189, Q01010454. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
8 Jan 2025StructuralPermit IssuedNYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
8 Jan 2025Construction FenceSigned-offRAVENSWOOD HOUSES (BUILDING #11), INSTALLATION OF 50 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH Building # Q00455189 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
8 Jan 2025General ConstructionPermit IssuedReplacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
8 Jan 2025General ConstructionPermit IssuedReplacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
8 Jan 2025StructuralPermit IssuedNYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
8 Jan 2025General ConstructionPermit IssuedReplacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
7 Jan 2025Construction FenceSigned-offRAVENSWOOD HOUSES (BUILDING #10), INSTALLATION OF 50 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH Building # Q00455185 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
17 Dec 2024Construction FenceSigned-offRAVENSWOOD HOUSES (BUILDING #9), INSTALLATION OF 8 FEET HIGH CONSTRUCTION FENCE IN CONJUNCTION WITH Building # Q00455180 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
21 Nov 2024Support of ExcavationPermit IssuedRAVENSWOOD HOUSES - BUILDING #12, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH Building # Q01124359, Q00944602-S4. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
28 Oct 2024Support of ExcavationSigned-offRAVENSWOOD HOUSES - BUILDING #10, INSTALLATION OF TEMPORARY SHORING AND SUPPORT FOR EXCAVATION IN CONJUNCTION WITH Building # Q00455185, Q01010452. NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
11 Oct 2024Construction FenceSigned-offRAVENSWOOD HOUSES (BUILDING #12), INSTALLATION OF 50 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH Building # Q00944602 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
11 Oct 2024PlumbingSigned-offNYCHA BOILER_REMOVE AND REPLACE HOT WATER HEATERS AND WATER LINES, RECIRCULATION PUMPS, DRAINS . INSTALL NEW SUMP PUMPS AND DISCHARGE LINES. INSTALL NEW AIR INTAKES AND EXHAUST FOR WATER HEATERS
9 Oct 2024Construction FenceSigned-offRAVENSWOOD HOUSES (BUILDING #15), INSTALLATION OF 100 LINEAR FEET OF CONSTRUCTION FENCE IN CONJUNCTION WITH Building # Q00455213 TO SECURE THE STAGING AREA. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
26 Sep 2024General ConstructionPermit IssuedRemoval of existing concrete entry stairs, installation of new concrete entry stairs, and pads for mechanical equipment, mounting of risers to exterior facade of the building
4 Apr 2024StructuralPermit Issuedremoval of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
25 Mar 2024Mechanical SystemsPermit IssuedNYCHA BOILER_REPLACEMENT OF EXISTING VACUUM AND CONDENSATE PUMPS, INSTALLATION OF COMBUSTION AIR DUCTWORK AND FLUES FOR NEW DOMESTIC AND HOT WATER HEATERS
25 Mar 2024StructuralPermit IssuedNYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
25 Mar 2024StructuralPermit IssuedNYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
25 Mar 2024StructuralPermit IssuedNYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
25 Mar 2024General ConstructionPermit IssuedReplacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
24 Oct 2023General ConstructionPermit IssuedReplacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installation of new gas piping.Replacement of doors and windows
23 Oct 2023StructuralPermit Issuedremoval of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
30 Aug 2016A2ISSUED
20 Oct 2014A2ISSUED
20 Oct 2014A2ISSUED
16 Oct 2014A2ISSUED
16 Oct 2014A2ISSUED
16 Oct 2014A2ISSUED

Showing the 50 most recent of 150. The full set is available in the interactive report.

Recorded documents

Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.

RecordedTypeAmountFromTo
23 Sep 2013SMIS
13 Apr 2012SMIS
23 Feb 1981EASE

About this page

Compiled from New York City public records — data retrieved 1 day ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.

This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.