600 Euclid Avenue
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Unused development capacity on the lot
Built floor-area ratio is 0.86 against a permitted 2.00, leaving 1.14 of unused ratio — roughly 1,502,295 sq ft of buildable area on a lot of 1,317,803 sq ft. Treat that as a ceiling under the floor-area rules, not a plan: height limits, setbacks, lot coverage, landmark status and sitting tenants can each reduce it, in some cases to nothing.
Unresolved conditions on record
72 violations remain open across 1,444 residential units (about 0.0 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Assessed value trend
Assessed value has risen 35.0% across the 5 assessment years on record (2023 to 2027), standing at $41,786,100. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.
Development & zoning
Floor-area ratio
| Built | 0.86 |
|---|---|
| Residential limit | 1.50 |
| Commercial limit | 0.00 |
| Community-facility limit | 2.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 2.00 |
|---|---|
| Unused ratio | 1.14 |
| Unused buildable area | 1,502,295 sq ft |
| Lot area | 1,317,803 sq ft |
Value & taxes
Assessment
| Assessed total | $41,786,100 |
|---|---|
| Assessed land | $11,860,200 |
| Assessed building | $29,925,900 |
| Market value on record | $92,858,000 |
| Assessed as % of market | 45.0% |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $41,786,100 |
| Tax rate | 12.502% |
| Estimated annual levy | $5,224,098.22 |
| Tax exemption (assessed value) | Nyc Housing Auth — $41,786,100 (through 2028) |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $41,786,100 | — |
| 2026 | $39,381,750 | +6.1% |
| 2025 | $36,944,550 | +6.6% |
| 2024 | $31,662,450 | +16.7% |
| 2023 | $30,964,050 | +2.3% |
Building & occupancy
Structure
| Year built | 1954 |
|---|---|
| Floors | 7 |
| Building area | 1,136,208 sq ft |
| Residential area | 1,136,208 sq ft |
| Commercial area | — |
Occupancy
| Total units | 1,444 |
|---|---|
| Residential units | 1,444 |
| Residential Avg unit size | 787 sq ft (calculated) |
| Building class | D3 |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | Euclid Av (A, C) — 0.22 mi |
|---|---|
| School district | 19 |
| Police precinct | 75 |
| Nearest firehouse | Engine 236 — 998 Liberty Ave. |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Zone 3 |
| Evictions on record | 27 (most recent 2026) |
Building compliance
| Facade | Unsafe |
|---|
Energy & emissions
| Energy use intensity | 126.8 kBtu/ft² |
|---|---|
| Greenhouse-gas emissions | 10,738 metric tons/yr |
Record activity
Compliance calculated
| Open violations | 72 |
|---|---|
| Open per residential unit | 0.0 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $7,000.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 2,914 |
|---|---|
| Permits / alterations | 260 |
| Recorded documents | 2 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | City of New York |
|---|---|
| Parcel | 3042920061 |
| Block | 4292 |
| Lot | 61 |
| Fixture liens | 1 active fixture lien |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 29 Dec 2025 | Enforcement | CLASS - 1 | ACTIVE | — | FAILURE TO MAINTAIN BUILDING FACADE WALL"S" AND APPURTENANCES. NOTE: AT THE TIME OF INSPECTION I OBSERVED AT EX #1, NORTH ELEVATION, CRACKED/BROKEN GLASS WINDOW AT 7TH FLOOR. UNSECURED OBJECTS ATTACHED TO WINDO |
| 15 Dec 2025 | Building | Boiler | Active | — | Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device |
| 15 Dec 2025 | Building | Boiler | Active | — | Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device |
| 14 Nov 2025 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| 14 Nov 2025 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION |
| 14 Nov 2025 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION |
| 14 Nov 2025 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| 14 Nov 2025 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| 17 Jul 2025 | Enforcement | CLASS - 2 | ACTIVE | — | FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED SPALLING PAINT FROM METER DAMAGE AT FRONT ENTRANCE, CLASS ROOM 1, 3 AND HALLWAY INSIDE UPN CENTER. REMEDY: REPAIR AND/OR REPLACE |
| 17 Jul 2025 | Enforcement | CLASS - 2 | ACTIVE | — | FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. EXTERIOR WALLS HAVE BECOME POROUS AND PIPE LEAKING IN HALLWAY WELL. CAUSING DAMAGE TOINTERIOR WALL OF CLASS ROOM AND HALLWAY. REMEDY: REPAIR AND/OR REPLACE |
| 7 May 2025 | Building | Facades | Active | — | CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS |
| 7 May 2025 | Building | Facades | Active | — | CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS |
| 7 May 2025 | Building | Facades | Active | — | CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS |
| 7 May 2025 | Building | Facades | Active | — | CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS |
| 7 May 2025 | Building | Facades | Active | — | CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS |
| 7 May 2025 | Building | Facades | Active | — | CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS |
| 7 May 2025 | Building | Facades | Active | — | CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS |
| 23 Sep 2024 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION |
| 23 Sep 2024 | Building | Boiler | Active | — | Violation Issued-Failure To File 2023 Internal High Pressure Inspection Report |
| 23 Sep 2024 | Building | Boiler | Active | — | Violation Issued-Failure To File 2023 External Low Pressure Inspection Report |
| 23 Sep 2024 | Building | Boiler | Active | — | Violation Issued-Failure To File 2023 External Low Pressure Inspection Report |
| 19 Aug 2024 | Enforcement | CLASS - 2 | ACTIVE | — | FAILURE TO MAINTAIN BUILDING EXTERIOR WALL(S) OR APPURTENANCES. NOTE:-AT THE TIME OF INSPECTION OBSERVED AT EXPO #1, 2 AND 3 NORTH, EAST ANDSOUTH ELEVATION DAMAGED/DETERIORATING MORTAR JOINT AT SEVERAL LOCATION |
| 1 Aug 2024 | Building | Facades | Active | — | FAILURE TO CORRECT SWARMP CONDITIONS |
| 1 Aug 2024 | Building | Facades | Active | — | FAILURE TO CORRECT SWARMP CONDITIONS |
| 22 Feb 2024 | Building | Facades | Active | — | FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| 22 Feb 2024 | Building | Facades | Active | — | FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| 22 Feb 2024 | Building | Facades | Active | — | FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| 22 Feb 2024 | Building | Facades | Active | — | FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| 22 Feb 2024 | Building | Facades | Active | — | FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| 22 Feb 2024 | Building | Facades | Active | — | FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| 22 Feb 2024 | Building | Facades | Active | — | FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| 22 Feb 2024 | Building | Facades | Active | — | FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| 22 Feb 2024 | Building | Facades | Active | — | FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| 22 Feb 2024 | Building | Facades | Active | — | FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| 22 Feb 2024 | Building | Facades | Active | — | FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024 |
| 30 Jun 2023 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION |
| 30 Jun 2023 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| 30 Jun 2023 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION |
| 30 Jun 2023 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION |
| 30 Jun 2023 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| 30 Jun 2023 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| 20 Jun 2023 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION |
| 20 Jun 2023 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION |
| 20 Jun 2023 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION |
| 20 Jun 2023 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION |
| 25 Apr 2023 | Building | Boiler | Active | — | VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION |
| 25 Apr 2023 | Building | Boiler | Active | — | VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION |
| 16 Mar 2020 | Building | Boiler | Active | — | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION |
| 16 Mar 2020 | Building | Boiler | Active | — | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION |
| 20 Feb 2020 | Building | Facades | Active | — | NYCHA UNSAFE CYCLE 8 REPORT FILED |
Showing the 50 most recent of 72. The full set is available in the interactive report.
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 9 Aug 2026 | Loud Music/Party | Noise - Residential | In Progress | — |
| 7 Aug 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 7 Aug 2026 |
| 7 Aug 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 7 Aug 2026 |
| 7 Aug 2026 | Banging/Pounding | Noise - Residential | Closed | 7 Aug 2026 |
| 7 Aug 2026 | Loud Music/Party | Noise - Residential | Closed | 7 Aug 2026 |
| 7 Aug 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 7 Aug 2026 |
| 3 Aug 2026 | Loud Talking | Noise - Street/Sidewalk | Closed | 3 Aug 2026 |
| 3 Aug 2026 | Loud Music/Party | Noise - Residential | Closed | 3 Aug 2026 |
| 3 Aug 2026 | Loud Music/Party | Noise - Residential | Closed | 3 Aug 2026 |
| 2 Aug 2026 | Loud Music/Party | Noise - Residential | Closed | 2 Aug 2026 |
| 1 Aug 2026 | Elevator - Single Device On Property/No Alternate Service | Elevator | Open | 1 Aug 2026 |
| 31 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 31 Jul 2026 |
| 30 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 30 Jul 2026 |
| 30 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 30 Jul 2026 |
| 30 Jul 2026 | Loud Talking | Noise - Residential | Closed | 30 Jul 2026 |
| 30 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 30 Jul 2026 |
| 27 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 27 Jul 2026 |
| 27 Jul 2026 | Tortured | Animal-Abuse | Closed | 27 Jul 2026 |
| 27 Jul 2026 | Neglected | Animal-Abuse | Closed | 27 Jul 2026 |
| 25 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 25 Jul 2026 |
| 25 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 25 Jul 2026 |
| 25 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 25 Jul 2026 |
| 25 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 25 Jul 2026 |
| 25 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 25 Jul 2026 |
| 24 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 24 Jul 2026 |
| 24 Jul 2026 | Trespassing | Non-Emergency Police Matter | Closed | 24 Jul 2026 |
| 24 Jul 2026 | Loud Talking | Noise - Street/Sidewalk | Closed | 24 Jul 2026 |
| 24 Jul 2026 | Tortured | Animal-Abuse | Closed | 24 Jul 2026 |
| 23 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 23 Jul 2026 |
| 23 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 23 Jul 2026 |
| 23 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 23 Jul 2026 |
| 23 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 23 Jul 2026 |
| 23 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 23 Jul 2026 |
| 22 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 22 Jul 2026 |
| 21 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 21 Jul 2026 |
| 21 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 21 Jul 2026 |
| 21 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 21 Jul 2026 |
| 20 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 20 Jul 2026 |
| 20 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 20 Jul 2026 |
| 19 Jul 2026 | Trespassing | Non-Emergency Police Matter | Closed | 19 Jul 2026 |
| 19 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 19 Jul 2026 |
| 18 Jul 2026 | Trespassing | Non-Emergency Police Matter | Closed | 18 Jul 2026 |
| 18 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 18 Jul 2026 |
| 18 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 18 Jul 2026 |
| 17 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 17 Jul 2026 |
| 17 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 17 Jul 2026 |
| 16 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 16 Jul 2026 |
| 12 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 12 Jul 2026 |
| 12 Jul 2026 | Noise: Alarms (NR3 | Noise | Closed | 13 Jul 2026 |
| 12 Jul 2026 | Noise: Alarms (NR3 | Noise | Closed | 20 Jul 2026 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 29 Jan 2025 | Suspended Scaffold | Signed-off | INSTALLATION OF SUSPENDED SCAFFOLD FOR EMERGENCY FACADE REPAIRS AND FACADE INSPECTIONS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 29 Jan 2025 | Suspended Scaffold | Signed-off | INSTALLATION OF SUSPENDED SCAFFOLD FOR EMERGENCY FACADE REPAIRS AND FACADE INSPECTIONS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 29 Jan 2025 | Suspended Scaffold | Signed-off | INSTALLATION OF SUSPENDED SCAFFOLD FOR EMERGENCY FACADE REPAIRS AND FACADE INSPECTIONS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 14 Jan 2025 | Sidewalk Shed | Signed-off | INSTALLATION OF NEW SIDEWALK SHED AT 1260 SUTTER AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION |
| 6 Jan 2025 | Construction Fence | Signed-off | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1260 SUTTER AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION |
| 6 Jan 2025 | Construction Fence | Signed-off | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1240 SUTTER AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION |
| 30 Jan 2024 | Suspended Scaffold | Permit Issued | added scaffold detail |
| 29 Jan 2024 | Suspended Scaffold | Permit Issued | added scaffold detail |
| 29 Jan 2024 | Suspended Scaffold | Permit Issued | added scaffold detail |
| 26 Jan 2024 | Suspended Scaffold | Permit Issued | added scaffold detail |
| 26 Jan 2024 | Suspended Scaffold | Permit Issued | added scaffold detail |
| 26 Jan 2024 | Suspended Scaffold | Permit Issued | added scaffold detail |
| 24 Jan 2024 | Suspended Scaffold | Permit Issued | added scaffold detail |
| 23 Jan 2024 | Suspended Scaffold | Permit Issued | added scaffold detail |
| 23 Jan 2024 | Suspended Scaffold | Permit Issued | added scaffold detail |
| 10 Jan 2024 | Suspended Scaffold | Signed-off | INSTALLATION OF SUSPENDED SCAFFOLD FOR EXTERIOR FACADE REPAIRS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 10 Jan 2024 | Suspended Scaffold | Signed-off | added scaffold detail |
| 28 Dec 2023 | Suspended Scaffold | Signed-off | added scaffold detail |
| 21 Dec 2023 | Suspended Scaffold | Signed-off | added scaffold detail |
| 19 Dec 2023 | Suspended Scaffold | Permit Issued | added scaffold detail |
| 19 Dec 2023 | Suspended Scaffold | Signed-off | added scaffold detail |
| 19 Dec 2023 | Suspended Scaffold | Signed-off | added scaffold detail |
| 19 Dec 2023 | Suspended Scaffold | Signed-off | added scaffold detail |
| 18 Dec 2023 | Suspended Scaffold | Signed-off | added scaffold detail |
| 18 Dec 2023 | Suspended Scaffold | Signed-off | added scaffold detail |
| 18 Dec 2023 | Suspended Scaffold | Signed-off | Installation of suspended scaffold for facade work or inspection |
| 1 Feb 2023 | Sidewalk Shed | Signed-off | INSTALLATION OF NEW SIDEWALK SHED AT 475 FOUNTAIN AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION |
| 24 Jan 2023 | Construction Fence | Signed-off | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 475 FOUNTAIN AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION |
| 12 Aug 2021 | Mechanical Systems | Permit Issued | INSTALLATION OF TEMPORARY STEAM AND CONDENSATE PIPING TO TEMPORARY BOILERS TO PROVIDE HEAT DURING HEATING SEASON |
| 30 Jul 2021 | General Construction | Permit Issued | TO PROVIDE SHORING AND SHEETING FOR ON GOING CONSTRUCTION ON AN OPEN SPACE. NO EXTERIOR WORK ON BUILDING WILL BE PERFORMED UNDER THIS APPLICATION. STRUCTURAL STABILITY WILL NOT BE AFFECTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 8 Jun 2021 | Construction Fence | Signed-off | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT , AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION |
| 8 Jun 2021 | Construction Fence | Signed-off | INSTALLATION OF TEMPORARY CONSTRUCTION/SECURITY FENCE AS PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 16 Apr 2021 | Plumbing | Signed-off | PLUMING WORK ASSOCIATED WITH THE INSTALLATION OF STORM WATER RETENTION PRACTICES PER Environmental ON-SITE PUBLIC PROPERTY GREEN INFRASTRUCTURE RETROFIT CONTRACT AS APPROVED UNDER ALT2 JOB #322016260. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| 17 Feb 2021 | Construction Fence | Permit Issued | INSTALLATION OF 8 FEET HIGH CHAIN LINK FENCE WITH DEBRIS MESH NETTING IN CONJUNCTION WITH Building # 340623187. NO CHANGE IN USE, EGRESS, AND OCCUPANCY |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 23 Nov 2020 | A2 | ISSUED | — |
| 15 Sep 2020 | Plumbing | Signed-off | As per plans, replacement of twin gas meters, gas piping and gas risers from cellar to 7th. floor for cooking only at Cypress Hill Housing, Building #7 |
| 13 Aug 2020 | Supported Scaffold | Permit Issued | SF/NYCHA Cypress Hills (BLDG #7 ) SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD) TO PROTECT PUBLIC FROM WORK AREAS .NO CHANGE IN USE, OCCUPANCY OR EGRESS |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Recorded documents
Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.
| Recorded | Type | Amount | From | To |
|---|---|---|---|---|
| 23 Feb 2006 | DECL | — | — | — |
| 23 Feb 2001 | PAT | — | — | — |
About this page
Compiled from New York City public records — data retrieved 5 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.