600 Euclid Avenue

Brooklyn · Parcel 3042920061
1,444
Residential units
1954
Year built
1,136,208 sq ft
Building area
71
Open violations
$41,786,100
Assessed value

Analysis

AI-generated Risk: Medium

The building has solid valuation and ample FAR capacity, but the open violations, unpaid safety penalties, and lack of a recent arm‑length sale create notable risk for investors.

The good

  • Market value ($92,858,000) is more than double the assessed value, indicating strong valuation
  • Built FAR (0.86) is well below the residential limit (1.5), so no over‑building constraints
  • Average unit size (787 sq ft) is generous for a 7‑story building
  • Enforcement penalties are $0, showing no fines from summonses

The bad

  • 71 open violations and 7 unpaid safety violations represent compliance risk
  • Safety‑violation penalties of $7,000 are owed and are material for a buyer
  • No arm‑length sale recorded, suggesting limited recent market transaction data
  • 3027 complaints and 260 permits indicate ongoing issues and high maintenance activity

Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.

What the numbers say

Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.

Unused development capacity on the lot

Built floor-area ratio is 0.86 against a permitted 2.00, leaving 1.14 of unused ratio — roughly 1,502,295 sq ft of buildable area on a lot of 1,317,803 sq ft. Treat that as a ceiling under the floor-area rules, not a plan: height limits, setbacks, lot coverage, landmark status and sitting tenants can each reduce it, in some cases to nothing.

Unresolved conditions on record

71 violations remain open across 1,444 residential units (about 0.0 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.

Assessed value trend

Assessed value has risen 35.0% across the 5 assessment years on record (2023 to 2027), standing at $41,786,100. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.

Development & zoning

Floor-area ratio

Built0.86
Residential limit1.50
Commercial limit0.00
Community-facility limit2.00

Development headroom (calculated) calculated

Highest permitted ratio2.00
Unused ratio1.14
Unused buildable area1,502,295 sq ft
Lot area1,317,803 sq ft

Value & taxes

Assessment

Assessed total$41,786,100
Assessed land$11,860,200
Assessed building$29,925,900
Market value on record$92,858,000
Assessed as % of market45.0%

Tax

Tax class2
Taxable assessed$41,786,100
Tax rate12.502%
Estimated annual levy$5,224,098.22
Tax exemption (assessed value)Nyc Housing Auth — $41,786,100 (through 2028)

The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.

Assessed value by year

YearAssessed valueChange
2027$41,786,100—
2026$39,381,750+6.1%
2025$36,944,550+6.6%
2024$31,662,450+16.7%
2023$30,964,050+2.3%

Building & occupancy

Structure

Year built1954
Floors7
Building area1,136,208 sq ft
Residential area1,136,208 sq ft
Commercial area—

Occupancy

Total units1,444
Residential units1,444
Residential Avg unit size787 sq ft (calculated)
Building classD3

Neighborhood, risk & energy

Neighborhood & transit

Nearest subwayEuclid Av (A, C) — 0.22 mi
School district19
Police precinct75
Nearest firehouseEngine 236 — 998 Liberty Ave.

Location risk

Flood zoneMinimal hazard (Zone X)
Hurricane evacuation zoneZone 3
Evictions on record27 (most recent 2026)

Building compliance

FacadeUnsafe

Energy & emissions

Energy use intensity126.8 kBtu/ft²
Greenhouse-gas emissions10,738 metric tons/yr

Record activity

Compliance calculated

Open violations71
Open per residential unit0.0 (calculated)
Enforcement penalties$0.00
Safety-violation penaltiesNot available
Total penalties owed$7,000.00 (calculated)
On tax-lien sale listNo

Activity

Complaints recorded3,027
Permits / alterations260
Recorded documents2
Legal proceedings0

Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.

Ownership & last recorded sale

Owner of record

OwnerCity of New York
Parcel3042920061
Block4292
Lot61
Fixture liens1 active fixture lien

Last recorded transfer

Date—
Recorded price—
Price per unitNot meaningful
Price vs assessedNot meaningful

Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.

Open violations

Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.

IssuedCategoryClassStatusAmount dueDescription
15 Dec 2025BuildingBoilerActive—Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
15 Dec 2025BuildingBoilerActive—Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
14 Nov 2025BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
14 Nov 2025BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
14 Nov 2025BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
14 Nov 2025BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
14 Nov 2025BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
17 Jul 2025EnforcementCLASS - 2ACTIVE—FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED SPALLING PAINT FROM METER DAMAGE AT FRONT ENTRANCE, CLASS ROOM 1, 3 AND HALLWAY INSIDE UPN CENTER. REMEDY: REPAIR AND/OR REPLACE
17 Jul 2025EnforcementCLASS - 2ACTIVE—FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. EXTERIOR WALLS HAVE BECOME POROUS AND PIPE LEAKING IN HALLWAY WELL. CAUSING DAMAGE TOINTERIOR WALL OF CLASS ROOM AND HALLWAY. REMEDY: REPAIR AND/OR REPLACE
7 May 2025BuildingFacadesActive—CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
7 May 2025BuildingFacadesActive—CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
7 May 2025BuildingFacadesActive—CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
7 May 2025BuildingFacadesActive—CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
7 May 2025BuildingFacadesActive—CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
7 May 2025BuildingFacadesActive—CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
7 May 2025BuildingFacadesActive—CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
23 Sep 2024BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
23 Sep 2024BuildingBoilerActive—Violation Issued-Failure To File 2023 Internal High Pressure Inspection Report
23 Sep 2024BuildingBoilerActive—Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
23 Sep 2024BuildingBoilerActive—Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
19 Aug 2024EnforcementCLASS - 2ACTIVE—FAILURE TO MAINTAIN BUILDING EXTERIOR WALL(S) OR APPURTENANCES. NOTE:-AT THE TIME OF INSPECTION OBSERVED AT EXPO #1, 2 AND 3 NORTH, EAST ANDSOUTH ELEVATION DAMAGED/DETERIORATING MORTAR JOINT AT SEVERAL LOCATION
1 Aug 2024BuildingFacadesActive—FAILURE TO CORRECT SWARMP CONDITIONS
1 Aug 2024BuildingFacadesActive—FAILURE TO CORRECT SWARMP CONDITIONS
22 Feb 2024BuildingFacadesActive—FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024
22 Feb 2024BuildingFacadesActive—FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024
22 Feb 2024BuildingFacadesActive—FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024
22 Feb 2024BuildingFacadesActive—FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024
22 Feb 2024BuildingFacadesActive—FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024
22 Feb 2024BuildingFacadesActive—FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024
22 Feb 2024BuildingFacadesActive—FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024
22 Feb 2024BuildingFacadesActive—FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024
22 Feb 2024BuildingFacadesActive—FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024
22 Feb 2024BuildingFacadesActive—FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024
22 Feb 2024BuildingFacadesActive—FAILED TO FILE facade inspection CYCLE 9C TECHNICAL REPORT BY 2/21/2024
30 Jun 2023BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
30 Jun 2023BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
30 Jun 2023BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
30 Jun 2023BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
30 Jun 2023BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
30 Jun 2023BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
20 Jun 2023BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
20 Jun 2023BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
20 Jun 2023BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
20 Jun 2023BuildingBoilerActive—VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
25 Apr 2023BuildingBoilerActive—VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION
25 Apr 2023BuildingBoilerActive—VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION
16 Mar 2020BuildingBoilerActive—VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
16 Mar 2020BuildingBoilerActive—VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
20 Feb 2020BuildingFacadesActive—NYCHA UNSAFE CYCLE 8 REPORT FILED
8 Jan 2020BuildingFacadesActive—CYCLE 8C UNSAFE REPORT FILED

Showing the 50 most recent of 71. The full set is available in the interactive report.

Complaints

A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.

DateProblemTypeStatusClosed
30 Oct 2026Loud Music/PartyNoise - ResidentialClosed30 Oct 2026
30 Oct 2026Loud TelevisionNoise - ResidentialClosed30 Oct 2026
29 Oct 2026Loud TelevisionNoise - ResidentialClosed29 Oct 2026
28 Oct 2026Other (complaint detailsAnimal-AbuseClosed28 Oct 2026
26 Oct 2026Loud TelevisionNoise - ResidentialClosed27 Oct 2026
26 Oct 2026Loud TelevisionNoise - ResidentialClosed26 Oct 2026
26 Oct 2026Loud Music/PartyNoise - Street/SidewalkClosed26 Oct 2026
26 Oct 2026Loud Music/PartyNoise - ResidentialClosed26 Oct 2026
26 Oct 2026Posted Parking Sign ViolationIllegal ParkingClosed26 Oct 2026
26 Oct 2026Posted Parking Sign ViolationIllegal ParkingClosed26 Oct 2026
26 Oct 2026Posted Parking Sign ViolationIllegal ParkingClosed26 Oct 2026
26 Oct 2026Posted Parking Sign ViolationIllegal ParkingClosed26 Oct 2026
26 Oct 2026Posted Parking Sign ViolationIllegal ParkingClosed26 Oct 2026
26 Oct 2026Posted Parking Sign ViolationIllegal ParkingClosed26 Oct 2026
26 Oct 2026Posted Parking Sign ViolationIllegal ParkingClosed26 Oct 2026
26 Oct 2026Posted Parking Sign ViolationIllegal ParkingClosed26 Oct 2026
25 Oct 2026Loud Music/PartyNoise - ResidentialClosed25 Oct 2026
25 Oct 2026Loud Music/PartyNoise - ResidentialClosed25 Oct 2026
24 Oct 2026Loud TelevisionNoise - ResidentialClosed24 Oct 2026
24 Oct 2026Loud TalkingNoise - Street/SidewalkClosed24 Oct 2026
23 Oct 2026Loud Music/PartyNoise - ResidentialClosed23 Oct 2026
22 Oct 2026Loud TalkingNoise - ResidentialClosed22 Oct 2026
21 Oct 2026DogNoiseClosed23 Oct 2026
20 Oct 2026Loud TelevisionNoise - ResidentialClosed20 Oct 2026
20 Oct 2026Other (complaint detailsAnimal-AbuseClosed20 Oct 2026
20 Oct 2026Banging/PoundingNoise - ResidentialClosed20 Oct 2026
20 Oct 2026Loud Music/PartyNoise - ResidentialClosed20 Oct 2026
19 Oct 2026Loud Music/PartyNoise - ResidentialClosed19 Oct 2026
17 Oct 2026Loud Music/PartyNoise - ResidentialClosed17 Oct 2026
17 Oct 2026Loud Music/PartyNoise - ResidentialClosed17 Oct 2026
17 Oct 2026Loud TelevisionNoise - ResidentialClosed17 Oct 2026
17 Oct 2026Loud TelevisionNoise - ResidentialClosed17 Oct 2026
17 Oct 2026Loud TelevisionNoise - ResidentialClosed17 Oct 2026
16 Oct 2026Loud Music/PartyNoise - ResidentialClosed16 Oct 2026
16 Oct 2026Loud Music/PartyNoise - ResidentialClosed16 Oct 2026
15 Oct 2026Loud Music/PartyNoise - ResidentialClosed15 Oct 2026
12 Oct 2026Loud TelevisionNoise - ResidentialClosed12 Oct 2026
12 Oct 2026Loud TelevisionNoise - ResidentialClosed12 Oct 2026
12 Oct 2026Loud Music/PartyNoise - ResidentialClosed12 Oct 2026
11 Oct 2026Loud TelevisionNoise - ResidentialClosed11 Oct 2026
11 Oct 2026Loud TelevisionNoise - ResidentialClosed11 Oct 2026
9 Oct 2026Loud TalkingNoise - ResidentialClosed9 Oct 2026
9 Oct 2026Loud Music/PartyNoise - ResidentialClosed9 Oct 2026
9 Oct 2026Loud TelevisionNoise - ResidentialClosed9 Oct 2026
8 Oct 2026Loud Music/PartyNoise - Street/SidewalkClosed8 Oct 2026
8 Oct 2026Loud Music/PartyNoise - ResidentialClosed8 Oct 2026
7 Oct 2026Loud Music/PartyNoise - ResidentialClosed7 Oct 2026
6 Oct 2026Loud Music/PartyNoise - ResidentialClosed7 Oct 2026
6 Oct 2026Loud Music/PartyNoise - ResidentialClosed6 Oct 2026
6 Oct 2026Loud TelevisionNoise - ResidentialClosed6 Oct 2026

Showing the 50 most recent of 150. The full set is available in the interactive report.

Permits & alterations

The absence of a permit does not prove no work was done — it may equally mean work was done without one.

IssuedTypeStatusWork
20 Mar 2026General ConstructionSigned-offFACADE REPAIR WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
29 Jan 2025Suspended ScaffoldSigned-offINSTALLATION OF SUSPENDED SCAFFOLD FOR EMERGENCY FACADE REPAIRS AND FACADE INSPECTIONS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
29 Jan 2025Suspended ScaffoldSigned-offINSTALLATION OF SUSPENDED SCAFFOLD FOR EMERGENCY FACADE REPAIRS AND FACADE INSPECTIONS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
29 Jan 2025Suspended ScaffoldSigned-offINSTALLATION OF SUSPENDED SCAFFOLD FOR EMERGENCY FACADE REPAIRS AND FACADE INSPECTIONS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
14 Jan 2025Sidewalk ShedSigned-offINSTALLATION OF NEW SIDEWALK SHED AT 1260 SUTTER AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
6 Jan 2025Construction FenceSigned-offINSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1260 SUTTER AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
6 Jan 2025Construction FenceSigned-offINSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 1240 SUTTER AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
30 Jan 2024Suspended ScaffoldPermit Issuedadded scaffold detail
29 Jan 2024Suspended ScaffoldPermit Issuedadded scaffold detail
29 Jan 2024Suspended ScaffoldPermit Issuedadded scaffold detail
26 Jan 2024Suspended ScaffoldPermit Issuedadded scaffold detail
26 Jan 2024Suspended ScaffoldPermit Issuedadded scaffold detail
26 Jan 2024Suspended ScaffoldPermit Issuedadded scaffold detail
24 Jan 2024Suspended ScaffoldPermit Issuedadded scaffold detail
23 Jan 2024Suspended ScaffoldPermit Issuedadded scaffold detail
23 Jan 2024Suspended ScaffoldPermit Issuedadded scaffold detail
10 Jan 2024Suspended ScaffoldSigned-offINSTALLATION OF SUSPENDED SCAFFOLD FOR EXTERIOR FACADE REPAIRS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
10 Jan 2024Suspended ScaffoldSigned-offadded scaffold detail
28 Dec 2023Suspended ScaffoldSigned-offadded scaffold detail
21 Dec 2023Suspended ScaffoldSigned-offadded scaffold detail
19 Dec 2023Suspended ScaffoldPermit Issuedadded scaffold detail
19 Dec 2023Suspended ScaffoldSigned-offadded scaffold detail
19 Dec 2023Suspended ScaffoldSigned-offadded scaffold detail
19 Dec 2023Suspended ScaffoldSigned-offadded scaffold detail
18 Dec 2023Suspended ScaffoldSigned-offadded scaffold detail
18 Dec 2023Suspended ScaffoldSigned-offadded scaffold detail
18 Dec 2023Suspended ScaffoldSigned-offInstallation of suspended scaffold for facade work or inspection
1 Feb 2023Sidewalk ShedSigned-offINSTALLATION OF NEW SIDEWALK SHED AT 475 FOUNTAIN AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
24 Jan 2023Construction FenceSigned-offINSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 475 FOUNTAIN AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
12 Aug 2021Mechanical SystemsPermit IssuedINSTALLATION OF TEMPORARY STEAM AND CONDENSATE PIPING TO TEMPORARY BOILERS TO PROVIDE HEAT DURING HEATING SEASON
30 Jul 2021General ConstructionPermit IssuedTO PROVIDE SHORING AND SHEETING FOR ON GOING CONSTRUCTION ON AN OPEN SPACE. NO EXTERIOR WORK ON BUILDING WILL BE PERFORMED UNDER THIS APPLICATION. STRUCTURAL STABILITY WILL NOT BE AFFECTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY
8 Jun 2021Construction FenceSigned-offINSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT , AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
8 Jun 2021Construction FenceSigned-offINSTALLATION OF TEMPORARY CONSTRUCTION/SECURITY FENCE AS PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY
16 Apr 2021PlumbingSigned-offPLUMING WORK ASSOCIATED WITH THE INSTALLATION OF STORM WATER RETENTION PRACTICES PER Environmental ON-SITE PUBLIC PROPERTY GREEN INFRASTRUCTURE RETROFIT CONTRACT AS APPROVED UNDER ALT2 JOB #322016260. NO CHANGE TO USE, EGRESS OR OCCUPANCY
17 Feb 2021Construction FencePermit IssuedINSTALLATION OF 8 FEET HIGH CHAIN LINK FENCE WITH DEBRIS MESH NETTING IN CONJUNCTION WITH Building # 340623187. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
23 Nov 2020A2ISSUED—
15 Sep 2020PlumbingSigned-offAs per plans, replacement of twin gas meters, gas piping and gas risers from cellar to 7th. floor for cooking only at Cypress Hill Housing, Building #7

Showing the 50 most recent of 150. The full set is available in the interactive report.

Recorded documents

Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.

RecordedTypeAmountFromTo
23 Feb 2006DECL———
23 Feb 2001PAT———

About this page

Compiled from New York City public records — data retrieved 23 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.