16 Dupont Street
Analysis
The building’s new age, clean penalty record, and recent arms‑length sale are positives, but the over‑built status and existing violations create moderate risk.
The good
- New construction (2023) with modern amenities
- Zero enforcement and safety violation penalties
- No legal proceedings, tax lien, or outstanding safety violations
- Arms‑length sale recorded in 2021
The bad
- Built beyond its residential floor‑area limit (over‑built)
- Six open violations remain on record
- Assessed value jumped over 10,000% since the last assessment
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 22.25, against a residential limit of 6.02 — it is over that limit by 16.23. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
A light open-violation load
Only 6 violations are currently open across 381 residential units, with $0.00 outstanding. For a building of this age that is a modest figure.
Last recorded sale
Recorded at $22,931,881 on 19 Jul 2021 — $60,189 per residential unit, $49 per built square foot, 0.41× the assessed value.
Assessed value trend
Assessed value has risen 10,251.8% across the 5 assessment years on record (2023 to 2027), standing at $55,899,900. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.
Development & zoning
Floor-area ratio
| Built | 22.25 |
|---|---|
| Residential limit | 6.02 |
| Commercial limit | 0.00 |
| Community-facility limit | 6.50 |
Development headroom (calculated) calculated
| Highest permitted ratio | 6.50 |
|---|---|
| Unused ratio | -15.75 |
| Unused buildable area | — |
| Lot area | 20,890 sq ft |
Value & taxes
Assessment
| Assessed total | $55,899,900 |
|---|---|
| Assessed land | $940,050 |
| Assessed building | $54,959,850 |
| Market value on record | $124,222,000 |
| Assessed as % of market | 45.0% |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $55,739,880 |
| Tax rate | 12.502% |
| Estimated annual levy | $6,968,599.80 |
| Tax exemption (assessed value) | 421-a — $55,727,580 (through 2062) |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $55,899,900 | — |
| 2026 | $49,793,400 | +12.3% |
| 2025 | $8,536,050 | +483.3% |
| 2024 | $540,000 | +1,480.8% |
| 2023 | $540,000 | 0.0% |
Building & occupancy
Structure
| Year built | 2023 |
|---|---|
| Floors | 41 |
| Building area | 464,814 sq ft |
| Residential area | 435,973 sq ft |
| Commercial area | 28,841 sq ft |
Occupancy
| Total units | 383 |
|---|---|
| Residential units | 381 |
| Rent-stabilized | 311 |
| Free Market / Other | 70 |
| Storefronts | 3 |
| Residential Avg unit size | 1,144 sq ft (calculated) |
| Commercial Avg unit size | 14,421 sq ft (calculated) |
| Building class | D7 |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | Greenpoint Av (G) — 0.38 mi |
|---|---|
| School district | 14 |
| Police precinct | 94 |
| Nearest firehouse | Engine 238/Ladder 106 — 205 Greenpoint Ave. |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Zone 2 |
| Projected floodplain | In the projected 2050s floodplain |
| Environmental restriction | Hazardous materials, air quality, noise |
| Cleanup site | Voluntary cleanup site (completed) |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 233 Franklin Street | 2025-11-17 | $20,000,000 | 27,309 | $732 |
Record activity
Compliance calculated
| Open violations | 6 |
|---|---|
| Open per residential unit | 0.0 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $0.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 180 |
|---|---|
| Permits / alterations | 32 |
| Recorded documents | 70 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Greenpoint Landing Lot 6 LLC |
|---|---|
| Parcel | 3024940006 |
| Block | 2494 |
| Lot | 6 |
| Mortgage on record | $158,972,988 (2022) — Sumitomo Mitsui Trust Bank, Limited, Ny Branch |
| Fixture liens | 1 active fixture lien |
Last recorded transfer
| Date | 19 Jul 2021 |
|---|---|
| Recorded price | $22,931,881 |
| Price per unit | $60,189 |
| Price vs assessed | 0.41× |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 22 Oct 2025 | Housing | A | NOV SENT OUT | — | 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY |
| 22 Oct 2025 | Housing | A | NOV SENT OUT | — | 27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS MISSING |
| 22 Oct 2025 | Housing | A | NOV SENT OUT | — | 27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX MISSING AT PUBLIC HALL, 1st STORY |
| 22 Oct 2025 | Housing | A | NOV SENT OUT | — | 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY |
| 22 Oct 2025 | Housing | A | NOV SENT OUT | — | 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/Housing |
| 22 Oct 2025 | Housing | A | NOV SENT OUT | — | 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 8 Aug 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 8 Aug 2026 |
| 7 Aug 2026 | Blocked Crosswalk | Illegal Parking | Closed | 7 Aug 2026 |
| 4 Aug 2026 | MOLD | UNSANITARY CONDITION | Open | — |
| 3 Aug 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 3 Aug 2026 |
| 27 Jul 2026 | Ventilation | Indoor Air Quality | Closed | 29 Jul 2026 |
| 25 Jul 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 26 Jul 2026 |
| 25 Jul 2026 | Blocked Crosswalk | Illegal Parking | Closed | 26 Jul 2026 |
| 24 Jul 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 24 Jul 2026 |
| 21 Jul 2026 | Blocked Crosswalk | Illegal Parking | Closed | 21 Jul 2026 |
| 14 Jul 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 14 Jul 2026 |
| 13 Jul 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 14 Jul 2026 |
| 10 Jul 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 10 Jul 2026 |
| 10 Jul 2026 | Egress - Doors Locked/Blocked/Improper/No Secondary Means | General Construction/Plumbing | Closed | 12 Jul 2026 |
| 10 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 10 Jul 2026 |
| 7 Jul 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 7 Jul 2026 |
| 3 Jul 2026 | Blocked Crosswalk | Illegal Parking | Closed | 3 Jul 2026 |
| 3 Jul 2026 | SEWAGE | UNSANITARY CONDITION | Closed | 28 Jul 2026 |
| 1 Jul 2026 | MOLD | UNSANITARY CONDITION | Closed | 2 Aug 2026 |
| 1 Jul 2026 | Blocked Crosswalk | Illegal Parking | Closed | 1 Jul 2026 |
| 22 Jun 2026 | VENTILATION SYSTEM | GENERAL | Closed | 27 Jun 2026 |
| 22 Jun 2026 | MOLD | UNSANITARY CONDITION | Closed | 27 Jun 2026 |
| 18 Jun 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 18 Jun 2026 |
| 17 Jun 2026 | Lead Kit Request (Residential) (L10 | Lead | Closed | 18 Jun 2026 |
| 12 Jun 2026 | Boiler - Defective/Inoperative/No Permit | Boilers | Closed | 29 Jun 2026 |
| 8 Jun 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 8 Jun 2026 |
| 7 Jun 2026 | Blocked Crosswalk | Illegal Parking | Closed | 7 Jun 2026 |
| 5 Jun 2026 | Cone | Obstruction | Closed | 8 Jun 2026 |
| 4 Jun 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 4 Jun 2026 |
| 23 May 2026 | Noise: Boat(Engine,Music,Etc) (NR10 | Noise | Closed | 26 May 2026 |
| 22 May 2026 | Sewage Odor | Indoor Air Quality | Closed | 25 May 2026 |
| 21 May 2026 | WATER SUPPLY | PLUMBING | Closed | 15 Jun 2026 |
| 18 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 18 May 2026 |
| 17 May 2026 | Blocked Crosswalk | Illegal Parking | Closed | 17 May 2026 |
| 13 May 2026 | Blocked Crosswalk | Illegal Parking | Closed | 13 May 2026 |
| 12 May 2026 | Elevator - Multiple Devices On Property | Elevator | Closed | 14 May 2026 |
| 12 May 2026 | Blocked Crosswalk | Illegal Parking | Closed | 12 May 2026 |
| 12 May 2026 | Storage Area Not Provided | Residential Disposal Complaint | Closed | 27 May 2026 |
| 6 May 2026 | Other (Explain Below | Indoor Air Quality | Closed | 8 May 2026 |
| 4 May 2026 | Elevator - Multiple Devices On Property | Elevator | Closed | 16 Jun 2026 |
| 2 May 2026 | Storage Area Not Provided | Residential Disposal Complaint | Closed | 5 May 2026 |
| 2 May 2026 | Blocked Crosswalk | Illegal Parking | Closed | 2 May 2026 |
| 1 May 2026 | Blocked Crosswalk | Illegal Parking | Closed | 1 May 2026 |
| 22 Apr 2026 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 23 Apr 2026 |
| 16 Apr 2026 | Blocked Crosswalk | Illegal Parking | Closed | 16 Apr 2026 |
| 16 Apr 2026 | Chemical Vapors/Gases/Odors | Indoor Air Quality | Closed | 16 Apr 2026 |
| 16 Apr 2026 | Blocked Sidewalk | Illegal Parking | Closed | 16 Apr 2026 |
| 15 Apr 2026 | Blocked Crosswalk | Illegal Parking | Closed | 16 Apr 2026 |
| 15 Apr 2026 | Blocked Crosswalk | Illegal Parking | Closed | 15 Apr 2026 |
| 14 Apr 2026 | Blocked Crosswalk | Illegal Parking | Closed | 14 Apr 2026 |
| 14 Apr 2026 | Dog Waste | Dirty Condition | Closed | 20 Apr 2026 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 2 Oct 2025 | Structural | Signed-off | Structural work in conjunction with NB |
| 11 Aug 2025 | Suspended Scaffold | Permit Issued | Window Inspection / Replacement |
| 22 Jul 2025 | Suspended Scaffold | Permit Issued | facade inspection |
| 2 Apr 2025 | Sidewalk Shed | Signed-off | INSTALLATION OF SIDEWALK SHED WITH SECTION OF SHED ON ROADWAY. SIDEWALK SHED IS DESIGNED IN ACCORDANCE WITH NYC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY |
| 9 Jan 2025 | Plumbing | Signed-off | Plumbing work in conjunction with New Building # B00604543 |
| 26 Nov 2024 | Curb Cut | Signed-off | Curb Cut filed in conjunction with NB # B00604543 |
| 22 Nov 2024 | General Construction | Signed-off | THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR A SALES OFFICE IN PURSUANT 28-111 AND BUILDING BULLETIN 2010-002 FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION #B00604543. MPP project number #114 |
| 21 Nov 2024 | Standpipe | Signed-off | Sprinkler/Standpipe work in conjunction with NB |
| 20 Nov 2024 | Sign | Signed-off | Erect halo lit non advertising sign on wall. No change of use, egess or occupancu |
| 29 Jul 2024 | General Construction | Signed-off | Alteration application filed herewith for interior temporary structures (shanties) in conjunction with DOBNOW New Building application #B00604543-I1. No change of use, occupancy or egress |
| 24 Jun 2024 | Supported Scaffold | Signed-off | INSTALLATION OF PIPE SCAFFOLDING AROUND BULKHEAD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 8 Apr 2024 | Supported Scaffold | Signed-off | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 26 Mar 2024 | Sidewalk Shed | Signed-off | INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE |
| 20 Feb 2024 | Protection and Mechanical Methods | Signed-off | Installation of temporary overhead protection for 33 Eagle Street, Brooklyn per plan submitted in conjunction with NB # B00604543 . Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this filing |
| 19 Jan 2024 | Suspended Scaffold | Signed-off | Facade Restoration |
| 28 Aug 2023 | Mechanical Systems | Signed-off | Mechanical systems in conjunction with new building |
| 18 Aug 2023 | General Construction | Permit Issued | New 41 story building |
| 23 May 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION AND USE OF TEMPORARY PROTECTION SCREEN (COCOON) SYSTEM AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 12 Apr 2023 | Protection and Mechanical Methods | Signed-off | USE OF Work Platform AT 16 DUPONT STREET DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER B00604543 |
| 12 Apr 2023 | Protection and Mechanical Methods | Signed-off | USE OF PLACING BOOM AT 16 DUPONT STREET DURING NEW BUILDING CONSTRUCTION, FILED SEPARATELY UNDER B00604543 |
| 11 Apr 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 15 Mar 2023 | Standpipe | Signed-off | Temp Standpipe in conjunction with new building |
| 10 Mar 2023 | Protection and Mechanical Methods | Signed-off | Installation of temporary overhead protection for 233 Franklin Street in conjunction with NB # B00604543 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 26 Jan 2023 | Protection and Mechanical Methods | Signed-off | Installation of 7,100# temporary dual cars personnel/material hoists per plan and application submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 6 Jan 2023 | Protection and Mechanical Methods | Signed-off | Installation of 7,000# temporary single car personnel/material hoist per plan and application submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 5 Jan 2023 | Plumbing | Signed-off | Underground plumbing work in conjunction with new building |
| 10 May 2022 | Foundation | Signed-off | Foundation work in conjunction with New Building |
| 22 Apr 2022 | Support of Excavation | Signed-off | Support of excavation in conjunction with New Building |
| 15 Apr 2022 | Foundation | Signed-off | Early foundation work in conjunction with NB # B00604543 |
| 31 Mar 2022 | Construction Fence | Signed-off | Fence in conjunction with NB |
| 9 Sep 2014 | DM | ISSUED | — |
| 24 Jun 2014 | A3 | ISSUED | — |
Recorded documents
Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.
| Recorded | Type | Amount | From | To |
|---|---|---|---|---|
| 29 Jun 2026 | ZONE | — | — | — |
| 21 Jan 2026 | SAGE | — | — | — |
| 7 Nov 2025 | Satisfaction of mortgage | — | — | — |
| 31 Oct 2025 | DECL | — | — | — |
| 27 Aug 2025 | ZONE | — | — | — |
| 27 Aug 2025 | DEVR | — | — | — |
| 9 Apr 2025 | CERT | — | — | — |
| 9 May 2024 | DECL | — | — | — |
| 22 Sep 2023 | CERR | — | — | — |
| 28 Apr 2023 | SAGE | — | — | — |
| 4 Jan 2023 | Agreement | — | — | — |
| 4 Jan 2023 | SAGE | — | — | — |
| 28 Dec 2022 | DECL | — | — | — |
| 20 Dec 2022 | RPTT&RET | — | — | — |
| 27 Sep 2022 | DECL | — | — | — |
| 30 Aug 2022 | Assignment | — | — | — |
| 30 Aug 2022 | TL&R | — | — | — |
| 30 Aug 2022 | Agreement | $30,000,000 | — | — |
| 30 Aug 2022 | Mortgage | $158,972,988 | — | — |
| 30 Aug 2022 | Mortgage | $42,821,526 | — | — |
| 30 Aug 2022 | AL&R | $231,794,514 | — | — |
| 30 Aug 2022 | SAGE | — | — | — |
| 30 Aug 2022 | SUBM | — | — | — |
| 20 Jul 2022 | SAGE | — | — | — |
| 1 Jul 2022 | RPTT&RET | — | — | — |
| 3 Jun 2022 | SAGE | — | — | — |
| 30 Mar 2022 | CERT | — | — | — |
| 30 Mar 2022 | ZONE | — | — | — |
| 30 Mar 2022 | ZONE | — | — | — |
| 30 Mar 2022 | SMIS | — | — | — |
| 4 Jan 2022 | EASE | — | — | — |
| 9 Dec 2021 | CERT | — | — | — |
| 9 Dec 2021 | SAGE | — | — | — |
| 19 Jul 2021 | SAGE | — | — | — |
| 19 Jul 2021 | Deed | $22,931,881 | — | — |
| 19 Jul 2021 | SAGE | — | — | — |
| 19 Jul 2021 | SMIS | — | — | — |
| 19 Jul 2021 | SMIS | — | — | — |
| 19 Jul 2021 | SMIS | — | — | — |
| 19 Jul 2021 | SMIS | — | — | — |
| 19 Jul 2021 | DEVR | — | — | — |
| 19 Jul 2021 | SMIS | — | — | — |
| 19 Jul 2021 | SMIS | — | — | — |
| 19 Jul 2021 | EASE | — | — | — |
| 19 Jul 2021 | Mortgage | $2,444,878 | — | — |
| 19 Jul 2021 | Mortgage | $30,000,000 | — | — |
| 19 Jul 2021 | AL&R | $30,000,000 | — | — |
| 19 Jul 2021 | SUBM | — | — | — |
| 19 Jul 2021 | SAGE | — | — | — |
| 19 Jul 2021 | CERT | — | — | — |
Showing the 50 most recent of 70. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 4 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.