1089 President Street
Analysis
The property offers a modern, spacious building with no current fines, but its over‑built residential floor area and open violations create moderate risk for investors.
The good
- Built in 2019, so the structure is modern and likely has up‑to‑date systems.
- Average unit size of 772 sq ft provides spacious apartments for renters or buyers.
- Enforcement and safety violation penalties are zero, indicating no outstanding fines.
- No legal proceedings, tax lien, or unpaid safety violation balances.
The bad
- Construction exceeds the residential floor‑area limit (built FAR 8.18 vs limit 3.44), meaning the building is over‑built and cannot be expanded.
- 22 open violations (0.1 per unit) suggest compliance issues that may require remediation.
- No arms‑length sale recorded; market value on record is zero, limiting price benchmarks.
- Over‑built status is a structural constraint for future development or re‑zoning.
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 8.18, against a residential limit of 3.44 — it is over that limit by 4.74. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
Unresolved conditions on record
22 violations remain open across 415 residential units (about 0.1 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Development & zoning
Floor-area ratio
| Built | 8.18 |
|---|---|
| Residential limit | 3.44 |
| Commercial limit | 0.00 |
| Community-facility limit | 6.50 |
Development headroom (calculated) calculated
| Highest permitted ratio | 6.50 |
|---|---|
| Unused ratio | -1.68 |
| Unused buildable area | — |
| Lot area | 45,293 sq ft |
Value & taxes
Assessment
| Assessed total | $44,087,399 |
|---|---|
| Assessed land | $1,630,350 |
| Assessed building | $42,457,049 |
| Market value on record | $0 |
| Assessed as % of market | — |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $0 |
| Tax rate | 12.502% |
| Estimated annual levy | — |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $0 | — |
| 2026 | $0 | — |
| 2025 | $0 | — |
Building & occupancy
Structure
| Year built | 2019 |
|---|---|
| Floors | 8 |
| Building area | 370,568 sq ft |
| Residential area | 320,544 sq ft |
| Commercial area | 50,024 sq ft |
Occupancy
| Ownership | Condominium |
|---|---|
| Total units | 417 |
| Residential units | 415 |
| Rent-stabilized | 191 |
| Free Market / Other | 224 |
| Residential Avg unit size | 772 sq ft (calculated) |
| Commercial Avg unit size | 25,012 sq ft (calculated) |
| Building class | RM |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | President St-Medgar Evers College (2, 5) — 0.22 mi |
|---|---|
| School district | 17 |
| Police precinct | 71 |
| Nearest firehouse | Engine 280/Ladder 132 — 489 Saint John's Place |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Not in an evacuation zone |
| City emergency repairs | 1 orders — $0 billed (through 2026) |
Energy & emissions
| Energy use intensity | 15.0 kBtu/ft² |
|---|---|
| Greenhouse-gas emissions | 597 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 208 Rogers Avenue | 2016-11-16 | $765,000 | 3,300 | $232 |
Record activity
Compliance calculated
| Open violations | 22 |
|---|---|
| Open per residential unit | 0.1 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $0.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 242 |
|---|---|
| Permits / alterations | 19 |
| Recorded documents | 0 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | City of New York |
|---|---|
| Parcel | 3012747501 |
| Block | 1274 |
| Lot | 7501 |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 5 Oct 2026 | Housing | B | NOV SENT OUT | — | 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 607, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| 5 Oct 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 607, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| 5 Oct 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 607, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| 5 Oct 2026 | Housing | B | NOV SENT OUT | — | 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 607, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| 10 Sep 2026 | Housing | B | NOV SENT OUT | — | 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 916, 9th STORY, 3rd APARTMENT FROM WEST AT NORTH |
| 10 Sep 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 916, 9th STORY, 3rd APARTMENT FROM WEST AT NORTH |
| 8 Sep 2026 | Housing | B | NOV SENT OUT | — | 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1020, 10th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| 8 Sep 2026 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER SYSTEM FROM BUILDING FRONT TO EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 8K, 8th STORY, 1st APARTMENT FROM NORTH AT EAST |
| 8 Sep 2026 | Housing | A | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKSET INSTALLED ON ENTRY DOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 8K, 8th STORY, 1st APARTMENT FROM NORTH AT EAST |
| 8 Sep 2026 | Housing | A | NOV SENT OUT | — | 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR FRAME MISSING AT PUBLIC HALL, 1st STORY |
| 8 Sep 2026 | Housing | A | NOV SENT OUT | — | 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/Housing. AT PUBLIC HALL |
| 3 Sep 2026 | Housing | A | NOV SENT OUT | — | 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE KITCHEN LOCATED AT APT 1020, 10th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| 22 Jun 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 603, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH |
| 22 Jun 2026 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AT DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 603, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH |
| 8 Jun 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 603, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| 8 Jun 2026 | Housing | B | NOV SENT OUT | — | 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 603, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| 9 Jan 2026 | Housing | B | NOV SENT OUT | — | 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1208, 12th STORY, 4th APARTMENT FROM NORTH AT EAST |
| 9 Jan 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1208, 12th STORY, 4th APARTMENT FROM NORTH AT EAST |
| 28 Aug 2025 | Housing | C | NOT COMPLIED WITH | — | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 603, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH |
| 20 Mar 2025 | Housing | C | NOV CERTIFIED LATE | — | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 8K, 8th STORY, 1st APARTMENT FROM NORTH AT EAST |
| 20 Mar 2025 | Housing | A | NOT COMPLIED WITH | — | 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE KITCHEN LOCATED AT APT 8K, 8th STORY, 1st APARTMENT FROM NORTH AT EAST |
| 29 Jun 2023 | Housing | C | NOV SENT OUT | — | 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 5 Oct 2026 | Branch or Limb Has Fallen Down | Damaged Tree | In Progress | — |
| 2 Oct 2026 | Loud Music/Party | Noise - Residential | Closed | 2 Oct 2026 |
| 28 Sep 2026 | SLOW LEAK | WATER LEAK | Open | — |
| 28 Sep 2026 | MOLD | UNSANITARY CONDITION | Closed | 4 Oct 2026 |
| 28 Sep 2026 | SLOW LEAK | WATER LEAK | Closed | 4 Oct 2026 |
| 28 Sep 2026 | Entire Tree Has Fallen Down | Damaged Tree | In Progress | — |
| 25 Sep 2026 | Branch or Limb Has Fallen Down | Damaged Tree | Closed | 26 Sep 2026 |
| 23 Sep 2026 | Branch or Limb Has Fallen Down | Damaged Tree | Closed | 24 Sep 2026 |
| 23 Sep 2026 | Branch or Limb Has Fallen Down | Damaged Tree | Closed | 24 Sep 2026 |
| 12 Sep 2026 | Double Parked Blocking Vehicle | Illegal Parking | Closed | 12 Sep 2026 |
| 9 Sep 2026 | Loud Talking | Noise - Street/Sidewalk | Closed | 10 Sep 2026 |
| 8 Sep 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 8 Sep 2026 |
| 7 Sep 2026 | Unleashed Dog in Public | Unleashed Dog | Closed | 22 Sep 2026 |
| 7 Sep 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 7 Sep 2026 |
| 4 Sep 2026 | SLOW LEAK | WATER LEAK | Closed | 10 Sep 2026 |
| 4 Sep 2026 | MOLD | UNSANITARY CONDITION | Closed | 10 Sep 2026 |
| 2 Sep 2026 | Banging/Pounding | Noise - Residential | Closed | 2 Sep 2026 |
| 23 Aug 2026 | Branch or Limb Has Fallen Down | Damaged Tree | Closed | 24 Sep 2026 |
| 22 Aug 2026 | Branch or Limb Has Fallen Down | Damaged Tree | Closed | 24 Sep 2026 |
| 22 Aug 2026 | Loud Music/Party | Noise - Residential | Closed | 22 Aug 2026 |
| 21 Aug 2026 | Branch or Limb Has Fallen Down | Damaged Tree | Closed | 24 Sep 2026 |
| 8 Aug 2026 | Planted More Than 2 Years Ago | Dead/Dying Tree | Closed | 13 Aug 2026 |
| 7 Aug 2026 | Double Parked Blocking Vehicle | Illegal Parking | Closed | 7 Aug 2026 |
| 5 Aug 2026 | Double Parked Blocking Vehicle | Illegal Parking | Closed | 5 Aug 2026 |
| 27 Jul 2026 | PESTS | UNSANITARY CONDITION | Closed | 14 Sep 2026 |
| 27 Jul 2026 | PESTS | UNSANITARY CONDITION | Closed | 14 Sep 2026 |
| 26 Jul 2026 | Noise, Barking Dog (NR5 | Noise | Closed | 28 Jul 2026 |
| 22 Jul 2026 | NO LIGHTING | ELECTRIC | Closed | 4 Sep 2026 |
| 22 Jul 2026 | SLOW LEAK | WATER LEAK | Closed | 3 Sep 2026 |
| 18 Jul 2026 | Remove Debris | Wood Pile Remaining | Closed | 13 Aug 2026 |
| 15 Jul 2026 | DOOR | DOOR/WINDOW | Closed | 4 Sep 2026 |
| 15 Jul 2026 | DOOR | DOOR/WINDOW | Closed | 4 Sep 2026 |
| 15 Jul 2026 | BELL/BUZZER/INTERCOM | GENERAL | Closed | 4 Sep 2026 |
| 14 Jul 2026 | PESTS | UNSANITARY CONDITION | Closed | 3 Aug 2026 |
| 10 Jul 2026 | DOOR | DOOR/WINDOW | Closed | 4 Sep 2026 |
| 10 Jul 2026 | DOOR FRAME | DOOR/WINDOW | Closed | 4 Sep 2026 |
| 10 Jul 2026 | BELL/BUZZER/INTERCOM | GENERAL | Closed | 4 Sep 2026 |
| 8 Jul 2026 | DOOR | DOOR/WINDOW | Closed | 4 Sep 2026 |
| 8 Jul 2026 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 11 Jul 2026 |
| 8 Jul 2026 | Branch or Limb Has Fallen Down | Damaged Tree | Closed | 13 Aug 2026 |
| 27 Jun 2026 | Banging/Pounding | Noise - Residential | Closed | 27 Jun 2026 |
| 20 Jun 2026 | Blocked Sidewalk | Illegal Parking | Closed | 20 Jun 2026 |
| 14 Jun 2026 | PESTS | UNSANITARY CONDITION | Closed | 22 Jun 2026 |
| 14 Jun 2026 | CEILING | PAINT/PLASTER | Closed | 18 Jun 2026 |
| 14 Jun 2026 | No Access | Blocked Driveway | Closed | 14 Jun 2026 |
| 8 Jun 2026 | Loud Talking | Noise - Residential | Closed | 8 Jun 2026 |
| 29 May 2026 | CEILING | PAINT/PLASTER | Closed | 7 Jun 2026 |
| 26 May 2026 | Lead Kit Request (Residential) (L10 | Lead | Closed | 26 May 2026 |
| 14 Apr 2026 | NO LIGHTING | ELECTRIC | Closed | 15 Jun 2026 |
| 14 Apr 2026 | Double Parked Blocking Vehicle | Illegal Parking | Closed | 14 Apr 2026 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 31 Mar 2025 | Suspended Scaffold | Permit Issued | INDUSTRIAL ROPE ACCESS FOR FACADE INSPECTIONS |
| 2 Jul 2024 | Mechanical Systems | Signed-off | Propose Mechanical work as part of interior tenant fitout filed in conjunction with Alt-2 # 340724265 |
| 2 Jul 2024 | A2 | ISSUED | — |
| 20 Mar 2024 | Suspended Scaffold | Signed-off | Rigging for Industrial Rope Access |
| 6 Oct 2023 | Structural | Signed-off | Structural Work as per plans in conjunction with Alt #340724265 . No change in use, egress or occupancy |
| 11 May 2023 | Plumbing | Signed-off | PROPOSE TO INSTALL PLUMBING FIXTURES AND SPRINKLER HEADS AS PART OF INTERIOR TENANT FITOUT FILED IN CONJUNCTION WITH ALT2 # 340724265 |
| 22 Mar 2022 | Construction Fence | Signed-off | Installation of temporary construction fence plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 23 Nov 2021 | NB | ISSUED | — |
| 2 Aug 2021 | A3 | ISSUED | — |
| 7 May 2021 | A2 | ISSUED | — |
| 24 Mar 2021 | Sidewalk Shed | Signed-off | Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 19 Mar 2021 | Supported Scaffold | Signed-off | Installation of temporary supported scaffold as hoist runback structure per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 18 Mar 2021 | Supported Scaffold | Signed-off | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 28 Oct 2020 | A3 | ISSUED | — |
| 22 Sep 2020 | A2 | ISSUED | — |
| 21 Aug 2020 | Supported Scaffold | Signed-off | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 14 Nov 2019 | A2 | ISSUED | — |
| 20 Jun 2019 | A2 | ISSUED | — |
| — | NB | IN PROCESS | — |
About this page
Compiled from New York City public records — retrieved today. Coverage on this parcel: 14 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.