499 President Street
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 6.47, against a residential limit of 3.00 — it is over that limit by 3.47. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
A light open-violation load
Only 3 violations are currently open across 350 residential units, with $0.00 outstanding. For a building of this age that is a modest figure.
Last recorded sale
Recorded at $75,969,073 on 18 May 2023 — $217,054 per residential unit, $231 per built square foot, 1.89× the assessed value.
Assessed value trend
Assessed value has risen 9,857.3% across the 5 assessment years on record (2023 to 2027), standing at $40,147,650. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.
Development & zoning
Floor-area ratio
| Built | 6.47 |
|---|---|
| Residential limit | 3.00 |
| Commercial limit | 2.00 |
| Community-facility limit | 3.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 3.00 |
|---|---|
| Unused ratio | -3.47 |
| Unused buildable area | — |
| Lot area | 50,748 sq ft |
Value & taxes
Assessment
| Assessed total | $40,147,650 |
|---|---|
| Assessed land | $1,489,950 |
| Assessed building | $38,657,700 |
| Market value on record | $89,217,000 |
| Assessed as % of market | 45.0% |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $40,147,650 |
| Tax rate | 12.502% |
| Estimated annual levy | $5,019,259.20 |
| Tax exemption (assessed value) | 421-a — $38,301,150 (through 2062) |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $40,147,650 | — |
| 2026 | $11,493,000 | +249.3% |
| 2025 | $4,409,100 | +160.7% |
| 2024 | $1,489,990 | +195.9% |
| 2023 | $403,200 | +269.5% |
Building & occupancy
Structure
| Year built | 2023 |
|---|---|
| Floors | 9 |
| Building area | 328,556 sq ft |
| Residential area | 298,183 sq ft |
| Commercial area | 30,373 sq ft |
Occupancy
| Total units | 351 |
|---|---|
| Residential units | 350 |
| Rent-stabilized | 350 |
| Residential Avg unit size | 852 sq ft (calculated) |
| Commercial Avg unit size | 30,373 sq ft (calculated) |
| Building class | D7 |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | Union St (R) — 0.22 mi |
|---|---|
| School district | 15 |
| Police precinct | 78 |
| Nearest firehouse | Engine 239 — 395 4th Ave. |
Location risk
| Flood zone | Moderate — 0.2% annual chance (Zone X) |
|---|---|
| Hurricane evacuation zone | Zone 2 |
| Environmental restriction | Hazardous materials, air quality, noise |
| Cleanup site | Environmental cleanup site (completed) |
Energy & emissions
| Energy use intensity | 1.2 kBtu/ft² |
|---|---|
| Greenhouse-gas emissions | 44 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 544-546 Union Street | 2025-06-27 | $5,000,000 | 6,956 | $719 |
| 548-550 Union Street | 2025-06-27 | $4,000,000 | 4,552 | $879 |
| 511 President Street | 2025-06-20 | $1,870,000 | 3,240 | $577 |
| 507 President Street, 3r | 2024-06-28 | $699,000 | — | — |
| 507 President Street, 3l | 2024-03-05 | $690,000 | — | — |
| 548 Union St | 2024-02-28 | $4,000,000 | 4,552 | $879 |
| 305-307 Nevins Street | 2023-04-28 | $4,350,000 | 5,040 | $863 |
| 514 Union Street | 2023-04-28 | $75,969,073 | 17,000 | $4,469 |
Record activity
Compliance calculated
| Open violations | 3 |
|---|---|
| Open per residential unit | 0.0 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $1,000.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 131 |
|---|---|
| Permits / alterations | 48 |
| Recorded documents | 64 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Gowanus President Owner LLC |
|---|---|
| Parcel | 3004400001 |
| Block | 440 |
| Lot | 1 |
| Mortgage on record | $84,133,112 (2023) — Manufacturers And Traders Trust Company |
| Fixture liens | 5 active fixture liens |
Last recorded transfer
| Date | 18 May 2023 |
|---|---|
| Recorded price | $75,969,073 |
| Price per unit | $217,054 |
| Price vs assessed | 1.89× |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 14 Nov 2025 | Building | Boiler | Active | — | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| 13 Nov 2025 | Housing | A | NOT COMPLIED WITH | — | 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY |
| 13 Nov 2025 | Housing | A | NOT COMPLIED WITH | — | 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR [ MISSING FRAME ] AT PUBLIC HALL, 1st STORY |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 15 Jul 2026 | Catch Basin Clogged/Flooding (Use Comments) (SC | Sewer | Open | — |
| 14 Jul 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 18 Jul 2026 |
| 28 Jun 2026 | Trash | Dirty Condition | Closed | 29 Jun 2026 |
| 15 Jun 2026 | Noise: Private Carting Noise (NQ1 | Noise | Closed | 23 Jun 2026 |
| 30 May 2026 | New Basket | Litter Basket Request | Closed | 1 Jun 2026 |
| 25 May 2026 | Banging/Pounding | Noise - Residential | Closed | 25 May 2026 |
| 20 May 2026 | Inadequate Sweeping | Street Sweeping Complaint | Closed | 21 May 2026 |
| 20 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 20 May 2026 |
| 12 May 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 12 May 2026 |
| 12 May 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 12 May 2026 |
| 30 Apr 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 30 Apr 2026 |
| 24 Apr 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 24 Apr 2026 |
| 14 Apr 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 14 Apr 2026 |
| 13 Apr 2026 | Loud Television | Noise - Residential | Closed | 14 Apr 2026 |
| 13 Apr 2026 | Banging/Pounding | Noise - Residential | Closed | 13 Apr 2026 |
| 8 Apr 2026 | Banging/Pounding | Noise - Residential | Closed | 8 Apr 2026 |
| 7 Apr 2026 | Chemical Vapors/Gases/Odors | Indoor Air Quality | Closed | 7 Apr 2026 |
| 2 Apr 2026 | Banging/Pounding | Noise - Residential | Closed | 2 Apr 2026 |
| 2 Apr 2026 | Chemical Vapors/Gases/Odors | Indoor Air Quality | Closed | 2 Apr 2026 |
| 1 Apr 2026 | Banging/Pounding | Noise - Residential | Closed | 2 Apr 2026 |
| 1 Apr 2026 | Catch Basin Clogged/Flooding (Use Comments) (SC | Sewer | Closed | 2 Apr 2026 |
| 26 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 26 Mar 2026 |
| 23 Mar 2026 | Loud Music/Party | Noise - Residential | Closed | 24 Mar 2026 |
| 22 Mar 2026 | Banging/Pounding | Noise - Residential | Closed | 23 Mar 2026 |
| 20 Mar 2026 | New Basket | Litter Basket Request | Closed | 21 Mar 2026 |
| 18 Mar 2026 | Banging/Pounding | Noise - Residential | Closed | 18 Mar 2026 |
| 17 Mar 2026 | Banging/Pounding | Noise - Residential | Closed | 18 Mar 2026 |
| 17 Mar 2026 | Banging/Pounding | Noise - Residential | Closed | 17 Mar 2026 |
| 14 Mar 2026 | Banging/Pounding | Noise - Residential | Closed | 14 Mar 2026 |
| 12 Mar 2026 | Banging/Pounding | Noise - Residential | Closed | 12 Mar 2026 |
| 11 Mar 2026 | Banging/Pounding | Noise - Residential | Closed | 11 Mar 2026 |
| 10 Mar 2026 | Banging/Pounding | Noise - Residential | Closed | 11 Mar 2026 |
| 10 Mar 2026 | Banging/Pounding | Noise - Residential | Closed | 10 Mar 2026 |
| 6 Mar 2026 | Sign | Obstruction | Closed | 9 Mar 2026 |
| 2 Mar 2026 | Banging/Pounding | Noise - Residential | Closed | 3 Mar 2026 |
| 23 Feb 2026 | Allowed in Smoke Free Area | Smoking or Vaping | Closed | 24 Apr 2026 |
| 13 Feb 2026 | Vent/Exhaust - Illegal/Improper | General Construction/Plumbing | Closed | 1 Jun 2026 |
| 9 Feb 2026 | Loud Television | Noise - Residential | Closed | 9 Feb 2026 |
| 3 Feb 2026 | Chemical Vapors/Gases/Odors | Indoor Air Quality | Closed | 3 Feb 2026 |
| 27 Jan 2026 | Noise, Barking Dog (NR5 | Noise | Closed | 29 Jan 2026 |
| 17 Jan 2026 | Noise: Construction Equipment (NC1 | Noise | Closed | 20 Jan 2026 |
| 15 Jan 2026 | Blocked Sidewalk | Illegal Parking | Closed | 15 Jan 2026 |
| 23 Dec 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 23 Dec 2025 |
| 2 Dec 2025 | Blocked Hydrant | Illegal Parking | Closed | 2 Dec 2025 |
| 2 Dec 2025 | Ventilation | Indoor Air Quality | Closed | 2 Dec 2025 |
| 1 Dec 2025 | VENTILATION SYSTEM | GENERAL | Closed | 26 May 2026 |
| 1 Dec 2025 | Allowed in Smoke Free Area | Smoking or Vaping | Closed | 30 Jan 2026 |
| 30 Nov 2025 | Ventilation | Indoor Air Quality | Closed | 1 Dec 2025 |
| 30 Nov 2025 | Ventilation | Indoor Air Quality | Closed | 30 Nov 2025 |
| 30 Nov 2025 | VENTILATION SYSTEM | GENERAL | Closed | 2 Dec 2025 |
Showing the 50 most recent of 131. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 22 Aug 2025 | Sign | Signed-off | Erect illuminated wall sign and illuminated d/f blade sign. Signs are accessory to Spear |
| 1 Aug 2025 | Mechanical Systems | Signed-off | MODIFICATION OF DUCTWORK AND INSTALLATION OF AC UNITS |
| 23 Jul 2025 | Sprinklers | Signed-off | MODIFICATION AND INSTALLATION OF SPRINKLER HEADS AND RELATED PIPING |
| 22 Jul 2025 | Plumbing | Signed-off | INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING |
| 27 Jun 2025 | General Construction | Signed-off | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, CEILINGS AND FLOORING. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 29 Jan 2025 | General Construction | Signed-off | Herewith filing a temporary construction office in conjunction with NB # 321598400. No change in use, occupancy or egress |
| 18 Dec 2024 | General Construction | Signed-off | TEMPORARY USE PERMIT APPLICATION FOR LEASING OFFICE AND MODEL APARTMENT PURSUANT TO 28-111 AND BUILDING BULLETIN 2010-002 OPTION B. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING 321598400 |
| 25 Sep 2024 | Mechanical Systems | Signed-off | Herewith filing PAA to updated the drawings and the mechanical equipment information as per the AI-1 |
| 24 Sep 2024 | Curb Cut | Signed-off | Installation of new curb-cut in conjunction with NB 321598400 & BPP # 340837429 |
| 17 Jul 2024 | Construction Fence | Signed-off | Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 12 Jun 2024 | Suspended Scaffold | Signed-off | Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy |
| 10 May 2024 | Construction Fence | Signed-off | Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 10 May 2024 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF DUAL 8000# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB FILED SEP. HOISTS SHALL COMPLY WITH THE 2022 BLDG CODES, CH #33. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUBMITTED TO ELEV DEPT UNDER SEPARATE APPLICA |
| 10 May 2024 | Protection and Mechanical Methods | Signed-off | Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 3 May 2024 | Protection and Mechanical Methods | Signed-off | Easy Scale Multipoint Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy |
| 24 Apr 2024 | Standpipe | Signed-off | INSTALLATION OF TEMPORARY DRY PRESSURIZED STANDPIPE WITH HOSE VALVE STATION AT EACH FLOOR FOR THE CONSTRUCTION PHASES OF NEW 10 STORY BUILDING FILED IN CONJUNCTION WITH NB #321598400 |
| 15 Feb 2024 | General Construction | Signed-off | Herewith filing sitework: Test piles including grading and backfill in conjunction with NB # 321598400 and SOE B00595766. No change in use occupancy or egress |
| 1 Feb 2024 | Plumbing | Signed-off | Housing NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing plumbing in conjunction with the NB application # 321598400. Underground plumbing filed under B00641891 |
| 30 Nov 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION AND USE OF TEMPORARY PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 1 Aug 2023 | Structural | Signed-off | Housing NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing structural in conjunction with the NB application # 321598400 |
| 31 Jul 2023 | Sidewalk Shed | Signed-off | Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 15 May 2023 | Plumbing | Signed-off | Housing NB already assigned to HUB. Please assign to HUB plan examiner. Herewith filing underground plumbing in conjunction with the NB application # 321598400 |
| 2 Apr 2023 | Support of Excavation | Signed-off | Herewith filing SOE in conjunction with NB # 321598400 |
| 24 Mar 2023 | Sprinklers | Signed-off | Installation of new automatic combined class 1 standpipe and sprinkler system in conjunction with NB #321598400 |
| 16 Dec 2022 | NB | ISSUED | — |
| 5 Nov 2021 | DM | ISSUED | — |
| 5 Nov 2021 | DM | ISSUED | — |
| 24 Sep 2021 | DM | ISSUED | — |
| 24 Sep 2021 | DM | ISSUED | — |
| 3 Sep 2021 | DM | ISSUED | — |
| 27 Aug 2021 | DM | ISSUED | — |
| 27 Aug 2021 | DM | ISSUED | — |
| 24 Aug 2021 | DM | ISSUED | — |
| 24 Aug 2021 | DM | ISSUED | — |
| 30 Jul 2021 | Construction Fence | Signed-off | Installation of 8' high plywood construction fence |
| 26 Jul 2021 | Construction Fence | Signed-off | Installation of 8' high temporary construction fence |
| 23 Mar 2021 | Sidewalk Shed | Signed-off | Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 22 Mar 2021 | Protection and Mechanical Methods | Signed-off | Installation of temporary overhead protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 4 Mar 2021 | Sidewalk Shed | Signed-off | Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 3 Mar 2021 | Protection and Mechanical Methods | Signed-off | Installation of temporary overhead protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 30 Nov 2004 | A2 | ISSUED | — |
| 30 Nov 2004 | A2 | ISSUED | — |
| 10 Aug 2000 | A2 | ISSUED | — |
| 10 Aug 2000 | A2 | ISSUED | — |
| 31 May 2000 | A1 | ISSUED | — |
| 31 May 2000 | A1 | ISSUED | — |
| 25 May 2000 | A1 | ISSUED | — |
| 25 Aug 1992 | A2 | ISSUED | — |
Recorded documents
Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.
| Recorded | Type | Amount | From | To |
|---|---|---|---|---|
| 12 Jan 2026 | CERT | — | — | — |
| 12 Jan 2026 | CERT | — | — | — |
| 19 Nov 2025 | DECL | — | — | — |
| 11 Oct 2024 | EASE | — | — | — |
| 11 Oct 2024 | EASE | — | — | — |
| 18 May 2023 | EASE | — | — | — |
| 18 May 2023 | CERT | — | — | — |
| 18 May 2023 | SMIS | — | — | — |
| 18 May 2023 | ZONE | — | — | — |
| 18 May 2023 | EASE | — | — | — |
| 18 May 2023 | EASE | — | — | — |
| 18 May 2023 | EASE | — | — | — |
| 18 May 2023 | EASE | — | — | — |
| 18 May 2023 | Deed | $75,969,073 | — | — |
| 18 May 2023 | SMIS | — | — | — |
| 18 May 2023 | Mortgage | $38,574,063 | — | — |
| 18 May 2023 | Mortgage | $84,133,112 | — | — |
| 18 May 2023 | Mortgage | $32,292,825 | — | — |
| 18 May 2023 | SAGE | — | — | — |
| 19 Dec 2022 | CERT | — | — | — |
| 29 Nov 2022 | DEVR | — | — | — |
| 29 Nov 2022 | EASE | — | — | — |
| 29 Aug 2022 | Deed | — | — | — |
| 9 Nov 2021 | CERT | — | — | — |
| 9 Nov 2021 | ZONE | — | — | — |
| 9 Nov 2021 | SAGE | — | — | — |
| 9 Oct 2020 | CERT | — | — | — |
| 9 Oct 2020 | ZONE | — | — | — |
| 2 Sep 2020 | SMIS | — | — | — |
| 31 Aug 2020 | SMIS | — | — | — |
| 27 Sep 2019 | Satisfaction of mortgage | — | — | — |
| 24 Sep 2019 | Deed | $44,100,000 | — | — |
| 22 Apr 2019 | TERA | $2,500,000 | — | — |
| 13 Dec 2017 | SPRD | $6,500,000 | — | — |
| 3 Nov 2014 | Agreement | $6,500,000 | — | — |
| 3 Nov 2014 | PREL | — | — | — |
| 10 Oct 2014 | TL&R | — | — | — |
| 9 Oct 2014 | Deed | $17,000,000 | — | — |
| 9 Oct 2014 | Mortgage | $7,250,000 | — | — |
| 3 Jul 2008 | Mortgage | $3,460,213 | — | — |
| 3 Jul 2008 | Agreement | $6,500,000 | — | — |
| 15 Jan 2004 | TL&R | — | — | — |
| 15 Jan 2004 | Mortgage | $1,376,718 | — | — |
| 15 Jan 2004 | TL&R | — | — | — |
| 15 Jan 2004 | Assignment | — | — | — |
| 15 Jan 2004 | AL&R | — | — | — |
| 15 Jan 2004 | Agreement | $3,500,000 | — | — |
| 14 Mar 2001 | Mortgage | $1,566,666 | — | — |
| 14 Mar 2001 | Assignment | — | — | — |
| 1 Mar 2000 | Deed | — | — | — |
Showing the 50 most recent of 64. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 5 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.