Searching…

261 Grand Concourse

The Bronx · Parcel 2023440001
283
Residential units
2024
Year built
221,625 sq ft
Building area
2
Open violations
$19,410,300
Assessed value

Analysis

AI-generated Risk: Medium

The property’s new construction and strong market valuation are attractive, but the over‑built residential floor‑area and existing safety penalties create moderate risk.

The good

  • Built in 2024, so all systems are brand new
  • Large average unit size of 783 sq ft
  • Market value on record of $43,134,000, more than double the assessed value

The bad

  • Residential floor‑area ratio of 8.55 exceeds the residential limit of 6.02, meaning the building is over‑built for its residential allowance
  • Two open violations and $6,000 in safety‑violation penalties indicate compliance issues that a buyer will need to resolve
  • 83 complaints filed in public records suggest resident dissatisfaction

Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.

What the numbers say

Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.

Already larger than residential zoning would allow

The building occupies a floor-area ratio of 8.55, against a residential limit of 6.02 — it is over that limit by 2.53. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.

A light open-violation load

Only 2 violations are currently open across 283 residential units, with $0.00 outstanding. For a building of this age that is a modest figure.

No arm's-length sale on record

The last recorded transfer is dated 6 Nov 2025 at a recorded price of $0. Transfers between related parties, estate settlements and corrective filings are legitimately recorded at nominal amounts, so this is neither an error nor a bargain — it means there is no usable sale price here, and every ratio derived from one (price per unit, price against assessed value) is therefore withheld rather than shown as zero.

Assessed value trend

Assessed value has risen 5,380.8% across the 5 assessment years on record (2023 to 2027), standing at $19,410,300. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.

Development & zoning

Floor-area ratio

Built8.55
Residential limit6.02
Commercial limit6.00
Community-facility limit6.50

Development headroom (calculated) calculated

Highest permitted ratio6.50
Unused ratio-2.05
Unused buildable area
Lot area25,920 sq ft

Value & taxes

Assessment

Assessed total$19,410,300
Assessed land$291,150
Assessed building$19,119,150
Market value on record$43,134,000
Assessed as % of market45.0%

Tax

Tax class2
Taxable assessed$19,360,804
Tax rate12.502%
Estimated annual levy$2,420,487.72
Tax abatementICAP — $40,912 (through 2037)

The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.

Assessed value by year

YearAssessed valueChange
2027$19,410,300
2026$9,814,500+97.8%
2025$239,850+3,991.9%
2024$184,500+30.0%
2023$354,150-47.9%

Building & occupancy

Structure

Year built2024
Floors14
Building area221,625 sq ft
Residential area221,625 sq ft
Commercial area19,393 sq ft

Occupancy

Total units283
Residential units283
Storefronts4
Residential Avg unit size783 sq ft (calculated)
Building classD1

Neighborhood, risk & energy

Neighborhood & transit

Nearest subway138 St-Grand Concourse (4, 5) — 0.06 mi
School district7
Police precinct40
Nearest firehouseBattalion 14/Engine 60/Ladder 17 — 341 East 143 Street

Location risk

Flood zoneMinimal hazard (Zone X)
Hurricane evacuation zoneZone 5
Environmental restrictionHazardous materials, air quality, noise

Comparable sales

AddressSale datePriceSq ft$/sq ft
261 Walton Avenue2026-02-19$29,660,410
301 Walton Ave2025-09-04$6,000,000
315 Grand Concourse2022-11-23$8,000,00010,183$786
270 Walton Avenue2022-11-23$15,300,00015,800$968
120 East 144 Street2022-03-30$41,500,00082,956$500
287 Walton Avenue2021-12-10$6,800,00025,348$268
370 Gerard Ave2019-11-20$10,805,47114,400$750
288 Walton Avenue2018-08-16$16,650,00031,760$524

Record activity

Compliance calculated

Open violations2
Open per residential unit0.0 (calculated)
Enforcement penalties$0.00
Safety-violation penaltiesNot available
Total penalties owed$6,000.00 (calculated)
On tax-lien sale listNo

Activity

Complaints recorded84
Permits / alterations57
Recorded documents64
Legal proceedings0

Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.

Ownership & last recorded sale

Owner of record

OwnerWalton Street Gc Developments LLC
Parcel2023440001
Block2344
Lot1
Mortgage on record$20,000,000 (2025) — Dbf Spe Iii LLC — note assigned
Fixture liens4 active fixture liens

Last recorded transfer

Date6 Nov 2025
Recorded price$0
Price per unitNot meaningful
Price vs assessedNot meaningful

Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.

Open violations

Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.

IssuedCategoryClassStatusAmount dueDescription
29 Aug 2025BuildingElevatorsActiveViolation Issued-Failure To File 2024 Cat1 Test Report
29 Aug 2025BuildingElevatorsActiveViolation Issued-Failure To File 2024 Periodic Inspection Report

Complaints

A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.

DateProblemTypeStatusClosed
14 Jul 2026Banging/PoundingNoise - ResidentialClosed14 Jul 2026
19 Jun 2026Loud Music/PartyNoise - Street/SidewalkClosed19 Jun 2026
8 Jun 2026New BasketLitter Basket RequestClosed8 Jun 2026
8 Jun 2026Garbage or LitterMaintenance or FacilityClosed16 Jun 2026
19 May 2026TrashDirty ConditionClosed20 May 2026
28 Apr 2026Posted Parking Sign ViolationIllegal ParkingClosed28 Apr 2026
19 Mar 2026NeglectedAnimal-AbuseClosed19 Mar 2026
12 Mar 2026Double Parked Blocking TrafficIllegal ParkingClosed12 Mar 2026
19 Jan 2026Noise: Construction Before/After Hours (NM1NoiseClosed20 Jan 2026
26 Sep 2025Non-ChronicHomeless Person AssistanceClosed26 Sep 2025
11 Sep 2025With License PlateAbandoned VehicleClosed11 Sep 2025
8 Sep 2025With License PlateAbandoned VehicleClosed9 Sep 2025
8 Sep 2025Derelict VehiclesDerelict VehiclesClosed9 Sep 2025
8 Sep 2025With License PlateAbandoned VehicleClosed8 Sep 2025
12 Jun 2025Double Parked Blocking VehicleIllegal ParkingClosed12 Jun 2025
17 May 2025Car/Truck HornNoise - VehicleClosed17 May 2025
9 May 2025Car/Truck HornNoise - VehicleClosed9 May 2025
8 May 2025TrashDirty ConditionClosed9 May 2025
28 Feb 2025Car/Truck HornNoise - VehicleClosed28 Feb 2025
27 Feb 2025Noise: Construction Before/After Hours (NM1NoiseClosed27 Feb 2025
26 Feb 2025Noise: Construction Equipment (NC1NoiseClosed26 Feb 2025
26 Feb 2025Noise: Construction Before/After Hours (NM1NoiseClosed27 Feb 2025
25 Feb 2025Noise: Jack Hammering (NC2NoiseClosed25 Feb 2025
21 Feb 2025GraffitiGraffitiClosed18 Mar 2025
30 Jan 2025N/APanhandlingClosed30 Jan 2025
30 Jan 2025ENTIRE BUILDINGHEAT/HOT WATERClosed31 Jan 2025
24 Jan 2025Engine IdlingNoise - VehicleClosed24 Jan 2025
24 Nov 2024Noise: Construction Equipment (NC1NoiseClosed1 Dec 2024
22 Nov 2024Noise: Construction Before/After Hours (NM1NoiseClosed25 Nov 2024
19 Nov 2024Noise: Construction Before/After Hours (NM1NoiseClosed19 Nov 2024
19 Nov 2024After Hours Work - IllegalEmergency Response Team (ERTClosed4 Dec 2024
19 Nov 2024Noise: Construction Before/After Hours (NM1NoiseClosed19 Nov 2024
15 Nov 2024Noise: Construction Before/After Hours (NM1NoiseClosed18 Nov 2024
14 Nov 2024Noise: Construction Before/After Hours (NM1NoiseClosed14 Nov 2024
12 Nov 2024Noise: Construction Before/After Hours (NM1NoiseClosed18 Nov 2024
11 Nov 2024Noise: Construction Before/After Hours (NM1NoiseClosed14 Nov 2024
6 Nov 2024GraffitiGraffitiClosed12 Dec 2024
5 Nov 2024Noise: Construction Before/After Hours (NM1NoiseClosed6 Nov 2024
4 Nov 2024Noise: Construction Before/After Hours (NM1NoiseClosed12 Nov 2024
3 Nov 2024ENTIRE BUILDINGHEAT/HOT WATERClosed5 Nov 2024
1 Nov 2024After Hours Work - IllegalEmergency Response Team (ERTClosed12 Nov 2024
29 Oct 2024Noise: Construction Before/After Hours (NM1NoiseClosed1 Nov 2024
29 Oct 2024After Hours Work - IllegalEmergency Response Team (ERTClosed6 Nov 2024
16 Oct 2024Noise: Construction Before/After Hours (NM1NoiseClosed17 Oct 2024
15 Oct 2024Noise: Construction Before/After Hours (NM1NoiseClosed17 Oct 2024
15 Oct 2024Blocked - ConstructionStreet ConditionClosed17 Oct 2024
15 Oct 2024Noise: Construction Before/After Hours (NM1NoiseClosed17 Oct 2024
15 Oct 2024Noise: Construction Before/After Hours (NM1NoiseClosed15 Oct 2024
14 Oct 2024After Hours Work - IllegalEmergency Response Team (ERTClosed30 Oct 2024
14 Oct 2024Noise: Construction Before/After Hours (NM1NoiseClosed16 Oct 2024

Showing the 50 most recent of 84. The full set is available in the interactive report.

Permits & alterations

The absence of a permit does not prove no work was done — it may equally mean work was done without one.

IssuedTypeStatusWork
5 Sep 2025Mechanical SystemsPermit IssuedINSTALLATION OF EMERGENCY GENERATOR IN CONJUNCTION WITH NB JOB NUMBER X00561795-I1
16 Jun 2025Boiler EquipmentSigned-offINSTALLATION OF EMERGENCY GENERATOR IN CONJUNCTION WITH NB JOB NUMBER X00561795-I1
31 Mar 2025Curb CutSigned-offCurb cut filed in conjunction with NB Job Number X00561795-I1
5 Feb 2025Mechanical SystemsSigned-offMechanical filed in conjunction with NB job number X00561795-I1
20 Nov 2024Protection and Mechanical MethodsSigned-offMaterial Platform filing as per plans filed herewith
20 Nov 2024Protection and Mechanical MethodsSigned-offWall Bracket Installation at shear wall SW7
6 Nov 2024SprinklersSigned-offPlumbing, Standpipe & Sprinkler filed in conjunction with NB Job Number X00561795-I1
6 Nov 2024StandpipeSigned-offTemp SD filed in conjunction with NB Job Number X00561795-I1
17 Oct 2024Construction FenceSigned-offCONSTRUCTION FENCE FILED IN CONJUNCTION WITH NB X00561795-I1 & X00673520-I1
3 Oct 2024Protection and Mechanical MethodsSigned-offINSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
2 Oct 2024StructuralSigned-offStructure filed in conjunction with NB Job Number X00561795-I1
25 Sep 2024General ConstructionPermit IssuedProposed fourteen (14) story residential project as per plans. A total of 2 Towers to be proposed on subject zoning lot. Building B, 315 Grand Concourse, job #X00673520-I1
20 Aug 2024Sidewalk ShedSigned-offINSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SECTION OF SHED IS IN THE ROADWAY AND SHALL BE PERMITTED AT D.O.T WORK SHALL COMPLY WITH 2008 BUILDING CODE CHAPTER 13. NO CHANGE IN USE, EGRESS OR OCCUPANCY
20 Aug 2024Protection and Mechanical MethodsSigned-offINSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
20 Aug 2024Supported ScaffoldSigned-offINSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
6 Aug 2024Support of ExcavationSigned-offSupport of Excavation filed in conjunction with NB Job #X00561795-I1
21 Mar 2022FoundationSigned-offFoundation & earthwork herewith filed for 261 Grand Concourse. Zoning approval has been obtained for New Building, Job #X00561795-I1 per Administrative Code 28-104.2.5
3 Dec 2021DMISSUED
8 Nov 2021Construction FenceSigned-offPROPOSED CONSTRUCTION FENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
17 Aug 2021SprinklersSigned-offCAP AND REMOVAL OF WET SPRINKLER SYSTEM FROM 2ND TO 1ST LEVEL AT EXISTING 2-STORY BUILDING. THIS JOB IS IN CONJUNCTION WITH FULL DEMOLITION JOB#220736372. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
28 Oct 2011A2ISSUED
28 Oct 2011A2ISSUED
26 Oct 2011A2ISSUED
26 Oct 2011A2ISSUED
4 Oct 2011A2ISSUED
4 Oct 2011A2ISSUED
10 May 2011A1ISSUED
20 Jan 2010A1ISSUED
16 Mar 2009A3ISSUED
14 Mar 2009A3ISSUED
30 Dec 2008A2ISSUED
30 Dec 2008A2ISSUED
21 Nov 2008A3ISSUED
21 Nov 2008A3ISSUED
6 Nov 2008A3ISSUED
6 Nov 2008A3ISSUED
21 Oct 2008A1ISSUED
21 Oct 2008A1ISSUED
8 Aug 2008A1ISSUED
8 Aug 2008A3ISSUED
8 Aug 2008A3ISSUED
18 Jul 2007A2ISSUED
18 Jul 2007A2ISSUED
3 Jul 2007A2ISSUED
3 Jul 2007A2ISSUED
1 Feb 2001A2ISSUED
4 May 2000A2ISSUED
4 May 2000A2ISSUED
5 Aug 1999A2ISSUED
5 Aug 1999A2ISSUED

Showing the 50 most recent of 57. The full set is available in the interactive report.

Recorded documents

Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.

RecordedTypeAmountFromTo
9 Jun 2026Agreement$155,000,000
1 Jun 2026Agreement$155,000,000
2 Jan 2026CERT
9 Dec 2025EASE
6 Nov 2025Deed
21 Oct 2025Assignment
21 Oct 2025AALR
21 Oct 2025AALR
21 Oct 2025Assignment
20 Aug 2025TL&R
20 Aug 2025TL&R
20 Aug 2025TL&R
14 Aug 2025Assignment
14 Aug 2025Agreement
14 Aug 2025Agreement$155,000,000
14 Aug 2025Assignment
14 Aug 2025AL&R$155,000,000
14 Aug 2025Assignment
14 Aug 2025Mortgage$20,000,000
25 Jul 2025EASE
4 Jun 2025Deed
9 Oct 2024SUBM
8 Oct 2024Mortgage$22,051,930
8 Oct 2024AL&R$22,051,930
2 Oct 2024AL&R$83,948,070
2 Oct 2024Mortgage$83,948,070
16 Sep 2024AL&R$29,000,000
16 Sep 2024Agreement$29,000,000
16 Sep 2024Mortgage$1,500,000
16 Sep 2024Assignment
11 Sep 2024Agreement
11 Sep 2024TL&R
2 May 2024EASE
14 Jul 2023CERT
14 Jul 2023ZONE
6 Dec 2022TL&R
6 Dec 2022Assignment
6 Dec 2022Mortgage$20,750,000
6 Dec 2022Agreement$27,500,000
6 Dec 2022AL&R$27,500,000
30 Nov 2022Deed$14,500,000
4 Nov 2021CERT
4 Nov 2021ZONE
25 Aug 2020Deed$9,000,000
25 Aug 2020Mortgage$6,750,000
25 Aug 2020AL&R$6,750,000
25 Aug 2020Satisfaction of mortgage
25 Aug 2020TL&R
4 Jun 2010Agreement$577,542
5 Nov 2009Agreement$600,000

Showing the 50 most recent of 64. The full set is available in the interactive report.

About this page

Compiled from New York City public records — data retrieved 5 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.

This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.