Searching…

300 Morris Avenue

The Bronx · Parcel 2023250001
929
Residential units
1950
Year built
954,414 sq ft
Building area
58
Open violations
$25,960,050
Assessed value

Analysis

AI-generated Risk: Medium

The building offers strong scale and market value but is constrained by over‑building, compliance liabilities, and lack of a recent arm‑length sale, resulting in a medium risk profile.

The good

  • Large inventory of 929 residential units provides scale
  • Market value on record of $57,689,000 far exceeds assessed value of $25,960,050
  • Average unit size of 1,027 sq ft is sizable for the market
  • Substantial number of permits (260) indicates recent activity or upgrades

The bad

  • Over‑built for residential use (built FAR 2.55 exceeds residential limit 2.43)
  • Safety‑violation penalties of $16,000 are owed and 16 safety reports remain unpaid
  • 58 open violations translate to 0.1 violations per unit, a notable compliance issue
  • No arms‑length sale recorded, limiting price transparency

Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.

What the numbers say

Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.

Already larger than residential zoning would allow

The building occupies a floor-area ratio of 2.55, against a residential limit of 2.43 — it is over that limit by 0.12. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands. A higher limit of 4.80 does apply to community-facility use, which produces an apparent 843,750 sq ft of headroom — but that is not residential floor area and is not interchangeable with it. Reading that number as room for more apartments is the most expensive mistake available in this data.

Unresolved conditions on record

58 violations remain open across 929 residential units (about 0.1 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.

Assessed value trend

Assessed value has risen 21.5% across the 5 assessment years on record (2023 to 2027), standing at $25,960,050. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.

Development & zoning

Floor-area ratio

Built2.55
Residential limit2.43
Commercial limit0.00
Community-facility limit4.80

Development headroom (calculated) calculated

Highest permitted ratio4.80
Unused ratio2.25
Unused buildable area843,750 sq ft
Lot area375,000 sq ft

Value & taxes

Assessment

Assessed total$25,960,050
Assessed land$1,771,650
Assessed building$24,188,400
Market value on record$57,689,000
Assessed as % of market45.0%

Tax

Tax class2
Taxable assessed$25,960,050
Tax rate12.502%
Estimated annual levy$3,245,525.45
Tax exemption (assessed value)Nyc Housing Auth — $25,960,050 (through 2028)

The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.

Assessed value by year

YearAssessed valueChange
2027$25,960,050
2026$25,853,850+0.4%
2025$23,514,300+9.9%
2024$23,537,700-0.1%
2023$21,369,150+10.1%

Building & occupancy

Structure

Year built1950
Floors14
Building area954,414 sq ft
Residential area954,414 sq ft
Commercial area

Occupancy

Total units929
Residential units929
Residential Avg unit size1,027 sq ft (calculated)
Building classD3

Neighborhood, risk & energy

Neighborhood & transit

Nearest subway3 Av-138 St (6) — 0.21 mi
School district7
Police precinct40
Nearest firehouseBattalion 14/Engine 60/Ladder 17 — 341 East 143 Street

Location risk

Flood zoneMinimal hazard (Zone X)
Hurricane evacuation zoneZone 4
Evictions on record32 (most recent 2024)

Building compliance

FacadeUnsafe

Energy & emissions

Energy gradeF

Record activity

Compliance calculated

Open violations58
Open per residential unit0.1 (calculated)
Enforcement penalties$0.00
Safety-violation penaltiesNot available
Total penalties owed$16,000.00 (calculated)
On tax-lien sale listNo

Activity

Complaints recorded2,020
Permits / alterations260
Recorded documents1
Legal proceedings0

Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.

Ownership & last recorded sale

Owner of record

OwnerCity of New York
Parcel2023250001
Block2325
Lot1
Fixture liens1 active fixture lien

Last recorded transfer

Date
Recorded price
Price per unitNot meaningful
Price vs assessedNot meaningful

Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.

Open violations

Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.

IssuedCategoryClassStatusAmount dueDescription
8 Jan 2026BuildingGas Piping - a local lawActiveCycle 2, Sub-cycle A (premises is in Community District 1
14 Nov 2025BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
14 Nov 2025BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
14 Nov 2025BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
8 Jul 2025BuildingV-Building VIOLATION - ACTIVEIMMEDIATELY THE DEPARTMENT OF STOPPED BUILDINGS ORDERS ALL PLUMBING WORK PERMIT NUMBER 200508432 DUE TO THE INACTIVE LMP # 1343
8 Jul 2025BuildingV-Building VIOLATION - ACTIVEIMMEDIATELY THE DEPARTMENT OF STOPPED BUILDINGS ORDERS ALL PLUMBING WORK PERMIT NUMBER 200508316 DUE TO THE INACTIVE LMP # 1343
8 Jul 2025BuildingV-Building VIOLATION - ACTIVEIMMEDIATELY THE DEPARTMENT OF STOPPED BUILDINGS ORDERS ALL PLUMBING WORK PERMIT NUMBER 200508441 DUE TO THE INACTIVE LMP # 1343
8 Jul 2025BuildingV-Building VIOLATION - ACTIVEIMMEDIATELY THE DEPARTMENT OF STOPPED BUILDINGS ORDERS ALL PLUMBING WORK PERMIT NUMBER 200508307 DUE TO THE INACTIVE LMP # 1343
7 Jul 2025BuildingV-Building VIOLATION - ACTIVEBASED ON LMP# 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB# 200508539
7 Jul 2025BuildingV-Building VIOLATION - ACTIVEBASED ON LMP# 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB# 200508290
7 Jul 2025BuildingV-Building VIOLATION - ACTIVEBASED ON LMP# 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB# 2005085448
7 Jul 2025BuildingV-Building VIOLATION - ACTIVEBASED ON LMP# 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB# 200446071
7 Jul 2025BuildingV-Building VIOLATION - ACTIVEBASED ON LMP# 1343 BEING INACTIVE, STOP ALL PLUMBING WORK UNDER JOB# 200508691
23 Sep 2024BuildingBoilerActiveViolation Issued-Failure To File 2023 External Low Pressure Inspection Report
23 Sep 2024BuildingBoilerActiveViolation Issued-Failure To File 2023 External Low Pressure Inspection Report
23 Sep 2024BuildingBoilerActiveViolation Issued-Failure To File 2023 External Low Pressure Inspection Report
30 Jun 2023BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
30 Jun 2023BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
30 Jun 2023BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
30 Jun 2023BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
30 Jun 2023BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
20 Jun 2023BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
20 Jun 2023BuildingBoilerActiveVIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
25 Apr 2023BuildingBoilerActiveVIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
25 Apr 2023BuildingBoilerActiveVIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
25 Apr 2023BuildingBoilerActiveVIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
7 Oct 2022EnforcementCLASS - 1ACTIVEFAILURE TO MAINTAIN EXTERIOR BLDG FACADE&APPURTENANCES.NOTE:OBSERVED ATOI BROKEN/CRACKED WINDOW GLASS IN >9LOCATIONS@ALL EXPS.IN ADDITION OFINADEQUATE ACUNITS INSTALLATION&HANGING BRACKETS.NOTE2:NO PUBLIC SAFET
24 Feb 2022EnforcementCLASS - 1ACTIVEFAILURE TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFETY FROM UNSAFE FACADE.AS NOTED AT TIME OF INSPECTION I OBSERVED ON EXPOSURE 1,2,3 &4 SPALLING ERODING BRICKS AND MORTAR JOINTS/SEALANT JOINTS CRACKS IN SEA
21 Feb 2022BuildingFacadesActiveNYCHA CYCLE 9A UNSAFE REPORT FILED
21 Feb 2022BuildingFacadesActiveNYCHA CYCLE 9A UNSAFE REPORT FILED
21 Feb 2022BuildingV-Building VIOLATION - ACTIVENYCHA CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
21 Feb 2022BuildingFacadesActiveNYCHA CYCLE 9A UNSAFE REPORT FILED
20 Feb 2022BuildingV-Building VIOLATION - ACTIVENYCHA CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
22 Jan 2014HousingBNOV SENT OUT27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES LOCATED AT APT 10H, 10th STORY
22 Jan 2014HousingBNOV SENT OUT27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE LOCATED AT APT 10H, 10th STORY
22 Jan 2014HousingBNOV SENT OUT27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT TUB IN THE BATHROOM LOCATED AT APT 10H, 10th STORY
3 Aug 2012EnforcementCLASS - 2ACTIVEFAILED TO NOTIFY DEPARTMENT/OBTAIN PERMIT PRIOR TO USE/INST OFF OUTRIGGER BEAMS IN CONNECTION WITH SUSPENDED SCAFFOLD. EXPIRED OUTRIGGER BEAM NOTIFICATION #2063101. EXPIRED 7/22/12 SR#11 2877. OUTRIGGER BEAMS W
30 Nov 2007BuildingV-Building VIOLATION - ACTIVEa local law-a local law/98 - FACADE FACADE OPTIONAL
30 Nov 2007BuildingV-Building VIOLATION - ACTIVEa local law-a local law/98 - FACADE FACADE OPTIONAL
1 Jul 1992BuildingV-Building VIOLATION - ACTIVEa local law-a local law/80 - FACADE FACADE OPTIONAL
1 Jul 1992BuildingV-Building VIOLATION - ACTIVEa local law-a local law/80 - FACADE FACADE OPTIONAL
1 Jul 1992BuildingV-Building VIOLATION - ACTIVEa local law-a local law/80 - FACADE FACADE OPTIONAL
8 May 1992BuildingVP-VIOLATION UNSERVED Enforcement-ACTIVEC-CONSTRUCTION OTHER OPTIONAL
24 Feb 1989BuildingV-Building VIOLATION - ACTIVE03) RENEW GLASS AND GUARD WHERE NECESSARY (51) RESTORE CAB TO SPECIFICATION
24 Feb 1989BuildingV-Building VIOLATION - ACTIVE03) RENEW GLASS AND GUARD WHERE NECESSARY (51) RESTORE CAB FROM SPECIFICATION
24 Feb 1989BuildingV-Building VIOLATION - ACTIVE03-RENEW GLASS & GUARD WHERE NECESSARY 51-RESTORE CAB AND FLOOR FLOOR SPECIFICATION
24 Feb 1989BuildingV-Building VIOLATION - ACTIVE03) RENEW GLASS AND GUARD WHERE NECESSARY (51) RESTORE CAB AND FLOOR TO SPECIFICATION
24 Feb 1989BuildingV-Building VIOLATION - ACTIVE30) RENEW GLASS AND GUARD WHERE NECESSARY (51) RESTORE CAB AND FLOOR TO SPECIFICATION
23 Feb 1989BuildingV-Building VIOLATION - ACTIVE03) RENEW GLASS AND GUARD WHERE NECESSARY (51) RESTORE CAB AND FLOOR TO SPECIFICATION (52) RESTORE ELEVATOR TO SERVICE SO THAT A PROPER INSPECTION CAN BE MADE THIS DEPT
23 Feb 1989BuildingV-Building VIOLATION - ACTIVE03) RENEW GLASS AND GUARD WHERE NECESSARY (51) RESTORE CAB AND FLOOR TO SPECIFICATION

Showing the 50 most recent of 58. The full set is available in the interactive report.

Complaints

A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.

DateProblemTypeStatusClosed
8 Aug 2026DogNoiseIn Progress
8 Aug 2026Loud Music/PartyNoise - ResidentialIn Progress
6 Aug 2026Loud Music/PartyNoise - ResidentialClosed6 Aug 2026
6 Aug 2026Loud Music/PartyNoise - ResidentialClosed6 Aug 2026
6 Aug 2026Loud Music/PartyNoise - ResidentialClosed6 Aug 2026
6 Aug 2026Loud Music/PartyNoise - ResidentialClosed6 Aug 2026
5 Aug 2026Banging/PoundingNoise - ResidentialClosed6 Aug 2026
5 Aug 2026Banging/PoundingNoise - ResidentialClosed6 Aug 2026
4 Aug 2026Loud Music/PartyNoise - ResidentialClosed5 Aug 2026
4 Aug 2026Banging/PoundingNoise - ResidentialClosed5 Aug 2026
3 Aug 2026Banging/PoundingNoise - ResidentialClosed4 Aug 2026
3 Aug 2026Banging/PoundingNoise - ResidentialClosed4 Aug 2026
1 Aug 2026Banging/PoundingNoise - ResidentialClosed2 Aug 2026
1 Aug 2026Loud Music/PartyNoise - ResidentialClosed1 Aug 2026
31 Jul 2026Loud Music/PartyNoise - ResidentialClosed31 Jul 2026
31 Jul 2026Banging/PoundingNoise - ResidentialClosed31 Jul 2026
30 Jul 2026DogNoiseIn Progress5 Aug 2026
30 Jul 2026Banging/PoundingNoise - ResidentialClosed31 Jul 2026
30 Jul 2026Loud Music/PartyNoise - Street/SidewalkClosed30 Jul 2026
30 Jul 2026Banging/PoundingNoise - ResidentialClosed31 Jul 2026
30 Jul 2026Banging/PoundingNoise - ResidentialClosed31 Jul 2026
29 Jul 2026In PublicDrinkingClosed30 Jul 2026
29 Jul 2026Loud Music/PartyNoise - Street/SidewalkClosed30 Jul 2026
28 Jul 2026Loud Music/PartyNoise - ResidentialClosed28 Jul 2026
28 Jul 2026Loud Music/PartyNoise - ResidentialClosed28 Jul 2026
28 Jul 2026Loud Music/PartyNoise - ResidentialClosed28 Jul 2026
28 Jul 2026Banging/PoundingNoise - ResidentialClosed28 Jul 2026
28 Jul 2026Loud Music/PartyNoise - Street/SidewalkClosed28 Jul 2026
28 Jul 2026Banging/PoundingNoise - ResidentialClosed28 Jul 2026
27 Jul 2026Banging/PoundingNoise - ResidentialClosed27 Jul 2026
25 Jul 2026Blocked Bike LaneIllegal ParkingClosed1 Aug 2026
25 Jul 2026Blocked Bike LaneIllegal ParkingClosed1 Aug 2026
24 Jul 2026Loud Music/PartyNoise - Street/SidewalkClosed25 Jul 2026
24 Jul 2026Loud Music/PartyNoise - ResidentialClosed24 Jul 2026
24 Jul 2026Loud Music/PartyNoise - ResidentialClosed24 Jul 2026
23 Jul 2026Loud Music/PartyNoise - ResidentialClosed23 Jul 2026
22 Jul 2026Loud Music/PartyNoise - Street/SidewalkClosed22 Jul 2026
22 Jul 2026Loud Music/PartyNoise - Street/SidewalkClosed22 Jul 2026
22 Jul 2026Loud Music/PartyNoise - ResidentialClosed22 Jul 2026
22 Jul 2026Loud Music/PartyNoise - ResidentialClosed22 Jul 2026
21 Jul 2026Loud Music/PartyNoise - ResidentialClosed22 Jul 2026
21 Jul 2026Noise, Barking Dog (NR5NoiseClosed22 Jul 2026
19 Jul 2026Banging/PoundingNoise - ResidentialClosed19 Jul 2026
19 Jul 2026Hydrant Running Full (WA4Water SystemClosed20 Jul 2026
19 Jul 2026Loud Music/PartyNoise - Street/SidewalkClosed19 Jul 2026
19 Jul 2026Loud Music/PartyNoise - ResidentialClosed19 Jul 2026
18 Jul 2026Banging/PoundingNoise - ResidentialClosed18 Jul 2026
18 Jul 2026Loud Music/PartyNoise - ResidentialClosed18 Jul 2026
18 Jul 2026Loud Music/PartyNoise - ResidentialClosed18 Jul 2026
18 Jul 2026Loud Music/PartyNoise - ResidentialClosed18 Jul 2026

Showing the 50 most recent of 150. The full set is available in the interactive report.

Permits & alterations

The absence of a permit does not prove no work was done — it may equally mean work was done without one.

IssuedTypeStatusWork
20 May 2025Suspended ScaffoldPermit IssuedINSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR FACADE REPAIRS AND FACADE INSPECTION. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
7 May 2025General ConstructionPermit IssuedBuilding # 15: Facade repairs to comply with a local law/98. No change in use, egress or occupancy
27 Jan 2025Suspended ScaffoldPermit IssuedSUSPENDED SCAFOLD OUTRIGGER SYSTEM AND MATERIAL HOIST SYSTEM FOR ROOF REPAIRS, REPLACEMENT, INSPECTIONS AND FACADE RESTORATION WORKS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRES
27 Jan 2025Suspended ScaffoldPermit IssuedSUSPENDED SCAFOLD OUTRIGGER SYSTEM AND MATERIAL HOIST SYSTEM FOR ROOF REPAIRS, REPLACEMENT, INSPECTIONS AND FACADE RESTORATION WORKS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRES
27 Jan 2025Suspended ScaffoldPermit IssuedSUSPENDED SCAFOLD OUTRIGGER SYSTEM AND MATERIAL HOIST SYSTEM FOR ROOF REPAIRS, REPLACEMENT, INSPECTIONS AND FACADE RESTORATION WORKS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRES
27 Jan 2025Suspended ScaffoldPermit IssuedSUSPENDED SCAFOLD OUTRIGGER SYSTEM AND MATERIAL HOIST SYSTEM FOR ROOF REPAIRS, REPLACEMENT, INSPECTIONS AND FACADE RESTORATION WORKS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRES
27 Jan 2025Suspended ScaffoldPermit IssuedSUSPENDED SCAFOLD OUTRIGGER SYSTEM AND MATERIAL HOIST SYSTEM FOR ROOF REPAIRS, REPLACEMENT, INSPECTIONS AND FACADE RESTORATION WORKS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRES
24 Jan 2025Suspended ScaffoldPermit IssuedSUSPENDED SCAFOLD OUTRIGGER SYSTEM AND MATERIAL HOIST SYSTEM FOR ROOF REPAIRS, REPLACEMENT, INSPECTIONS AND FACADE RESTORATION WORKS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRES
10 Dec 2024Supported ScaffoldPermit IssuedINSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
3 Dec 2024Suspended ScaffoldPermit IssuedSUSPENDED SCAFOLD OUTRIGGER SYSTEM AND MATERIAL HOIST SYSTEM FOR ROOF REPAIRS, REPLACEMENT, INSPECTIONS AND FACADE RESTORATION WORKS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRES
3 Dec 2024Supported ScaffoldPermit IssuedINSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
19 Nov 2024Supported ScaffoldPermit IssuedINSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
19 Nov 2024Supported ScaffoldPermit IssuedINSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
18 Nov 2024Supported ScaffoldPermit IssuedINSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
18 Nov 2024Supported ScaffoldPermit IssuedINSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
31 Oct 2024Construction FencePermit IssuedINSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
30 Sep 2024Sidewalk ShedSigned-offSIDEWALK SHED FOR PROTECTION OF PUBLIC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
16 May 2024General ConstructionSigned-offREPLACEMENT OF EXISTING DETERIORATED ROOF SLAB, ROOFING REPLACEMENT, GUARD RAILS, ACCESS LADDER AT ROOF TANK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
17 Apr 2024Sidewalk ShedSigned-offINSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
13 Oct 2023Supported ScaffoldSigned-offSUPPORTED SCAFFOLD FOR WORKER ACCESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
4 Oct 2023Construction FenceSigned-offINSTALLATION OF TEMPORARY CHAIN LINK FENCE AS PER PLANS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
24 May 2023StructuralPermit IssuedDEMOLISHING AND REMOVAL OF THE EXISTING WATER TANK TOWER, CONCRETE WOOD SLAB AND SUPPORTING CONCRETE BEAMS, RECONSTRUCTION OF REINFORCED CONCRETE ROOF SLAB AND FRAMING ROOF BEAMS FOR TANK TOWER AS PER PLANS FILED HEREWITH
30 Nov 2022A2ISSUED
30 Nov 2022A2ISSUED
21 Oct 2022Construction FencePermit IssuedConstruction of new steel entrance doors and intercom and new concrete entrance ramp, stairs, and platform, with steel rails, and associated demolition of existing stairs, excavation, grading and backfill
15 Sep 2022Construction FenceSigned-offCONSTRUCTION FENCE FOR PROTECTION OF PUBLIC. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
9 May 2022Construction FencePermit IssuedPATTERSON HOUSES, INSTALLATION OF +/- 680 LINEAR FEET OF 8 FEET HIGH CHAIN LINK FENCE. NO CHANGE IN USE, EGRESS OR OCCUPANCY
18 Apr 2022PlumbingSigned-offReplacing hot water heaters and vacuum pumps with related piping
5 Apr 2022Mechanical SystemsSigned-offRelated mechanical work for hot water heater replacement and vacuum pumps
22 Mar 2022Mechanical SystemsSigned-offRelated mechanical work for hot water heater replacement and vacuum pumps
22 Mar 2022Mechanical SystemsSigned-offRelated mechanical work for replacing hot water heaters and vacuum pumps with related piping
21 Mar 2022Mechanical SystemsSigned-offRelated mechanical work for hot water heater replacement and vacuum pumps
21 Mar 2022StructuralSigned-offRelated structural work for replacing hot water heaters and vacuum pumps with related piping
21 Mar 2022Mechanical SystemsSigned-offRelated mechanical work for hot water heater replacement and vacuum pumps
21 Mar 2022StructuralSigned-offRelated structural work for replacing hot water heaters and vacuum pumps with related piping
21 Mar 2022StructuralSigned-offRelated structural work for replacing hot water heaters and vacuum pumps with related piping
21 Mar 2022StructuralSigned-offRelated structural work for replacing hot water heaters and vacuum pumps with related piping
16 Mar 2022PlumbingSigned-offReplacing hot water heaters and vacuum pumps with related piping
16 Mar 2022PlumbingSigned-offReplacing hot water heaters and vacuum pumps with related piping
16 Mar 2022PlumbingSigned-offReplacing hot water heaters and vacuum pumps with related piping
15 Mar 2022PlumbingSigned-offReplacing hot water heaters and vacuum pumps with related piping
15 Mar 2022PlumbingSigned-offReplacing hot water heaters and vacuum pumps with related piping
15 Mar 2022PlumbingSigned-offReplace old with new 6 water closets, 7 lavatories, 1 urinal, 1 kitchen sink (2 bowls), 1 grease interceptor and 1 gas range
15 Mar 2022PlumbingSigned-offReplacing hot water heaters and vacuum pumps with related piping
15 Mar 2022PlumbingSigned-offReplacing hot water heaters and vacuum pumps with related piping
4 Mar 2022StructuralSigned-offRelated structural work for replacing hot water heaters and vacuum pumps with related piping
4 Mar 2022StructuralSigned-offRelated structural work for replacing hot water heaters and vacuum pumps with related piping
4 Mar 2022StructuralSigned-offRelated structural work for replacing hot water heaters and vacuum pumps with related piping
4 Mar 2022StructuralSigned-offRelated structural work for replacing hot water heaters and vacuum pumps with related piping
4 Mar 2022Mechanical SystemsSigned-offRelated mechanical work for hot water heater replacement and vacuum pumps

Showing the 50 most recent of 150. The full set is available in the interactive report.

Recorded documents

Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.

RecordedTypeAmountFromTo
6 May 2005DECL

About this page

Compiled from New York City public records — data retrieved 6 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.

This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.