Searching…

101 Lincoln Avenue

The Bronx · Parcel 2023160001
921
Residential units
2020
Year built
973,381 sq ft
Building area
47
Open violations
$77,139,000
Assessed value

Analysis

AI-generated Risk: Medium

The building carries medium risk due to its over‑built residential floor area and a notable number of open violations, but its strong market‑to‑assessed value ratio, clean penalty record, and recent arm's‑length sale are positive factors.

The good

  • market value on record ($171,420,000) far exceeds assessed value ($77,139,000)
  • no enforcement or safety violation penalties owed
  • no legal proceedings and not on tax lien list
  • recent arm's‑length sale in 2018 for $125,400,000

The bad

  • built beyond its residential floor‑area limit (residential FAR 7.62 vs limit 6.02)
  • 47 open violations across the building
  • 598 complaints recorded in public records
  • over‑built status restricts any future residential expansion

Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.

What the numbers say

Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.

Already larger than residential zoning would allow

The building occupies a floor-area ratio of 7.62, against a residential limit of 6.02 — it is over that limit by 1.60. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.

Unresolved conditions on record

47 violations remain open across 921 residential units (about 0.1 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.

Last recorded sale

Recorded at $125,400,000 on 11 Sep 2018 — $136,156 per residential unit, $129 per built square foot, 1.63× the assessed value.

Assessed value trend

Assessed value has risen 472.0% across the 5 assessment years on record (2023 to 2027), standing at $77,139,000. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.

Development & zoning

Floor-area ratio

Built7.62
Residential limit6.02
Commercial limit5.00
Community-facility limit6.50

Development headroom (calculated) calculated

Highest permitted ratio6.50
Unused ratio-1.12
Unused buildable area
Lot area127,721 sq ft

Value & taxes

Assessment

Assessed total$77,139,000
Assessed land$1,436,850
Assessed building$75,702,150
Market value on record$171,420,000
Assessed as % of market45.0%

Tax

Tax class2
Taxable assessed$77,139,000
Tax rate12.502%
Estimated annual levy$9,643,917.78
Tax exemption (assessed value)421-a — $76,105,624 (through 2060)

The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.

Assessed value by year

YearAssessed valueChange
2027$77,139,000
2026$79,184,700-2.6%
2025$71,631,900+10.5%
2024$71,631,9000.0%
2023$13,485,150+431.2%

Building & occupancy

Structure

Year built2020
Floors25
Building area973,381 sq ft
Residential area862,512 sq ft
Commercial area110,869 sq ft

Occupancy

Total units926
Residential units921
Rent-stabilized734
Free Market / Other187
Storefronts2
Residential Avg unit size936 sq ft (calculated)
Commercial Avg unit size22,174 sq ft (calculated)
Building classD6

Neighborhood, risk & energy

Neighborhood & transit

Nearest subway3 Av-138 St (6) — 0.31 mi
School district7
Police precinct40
Nearest firehouseBattalion 12/Engine 35/Ladder 14 — 2282 Third Avenue

Location risk

Flood zoneHigh-risk (Zone AE)
Hurricane evacuation zoneZone 1
Projected floodplainIn the projected 2050s floodplain
Environmental restrictionHazardous materials, air quality, noise
Cleanup siteEnvironmental cleanup site (completed)
City emergency repairs1 orders — $439 billed (through 2025)

Energy & emissions

Energy use intensity29.4 kBtu/ft²
Greenhouse-gas emissions2,982 metric tons/yr

Record activity

Compliance calculated

Open violations47
Open per residential unit0.1 (calculated)
Enforcement penalties$0.00
Safety-violation penaltiesNot available
Total penalties owed$0.00 (calculated)
On tax-lien sale listNo

Activity

Complaints recorded598
Permits / alterations74
Recorded documents54
Legal proceedings0

Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.

Ownership & last recorded sale

Owner of record

OwnerBop 101 Lincoln Avenue LLC
Parcel2023160001
Block2316
Lot1
Mortgage on record$185,531,906 (2022) — Athene Annuity And Life Company
Fixture liens4 active fixture liens

Last recorded transfer

Date11 Sep 2018
Recorded price$125,400,000
Price per unit$136,156
Price vs assessed1.63×

Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.

Open violations

Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.

IssuedCategoryClassStatusAmount dueDescription
7 Aug 2026HousingAVIOLATION OPEN27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/Housing/SERVICES-AND-INFOR
17 Jul 2026HousingANOTICE OF ISSUANCE SENT TO TENANT27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT EAST WALL IN THE BATHROOM LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH
17 Jul 2026HousingCNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TILE AT FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH
17 Jul 2026HousingBNOTICE OF ISSUANCE SENT TO TENANT27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 1O SQ FT AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18717897 ISSUED 17-MAR-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CO
22 Jun 2026HousingBNOTICE OF ISSUANCE SENT TO TENANT27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT WEST WALL IN THE KITCHEN LOCATED AT APT 1442, 14th STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18652641 ISSUED 18-FEB-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-201
1 Jun 2026HousingBNOV SENT OUT27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT EAST WALL IN THE BATHROOM LOCATED AT APT 260, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''North'', AT EAST
1 Jun 2026HousingCNOV SENT OUT27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER SUPPLY EXCEEDING 130F DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 260, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''North'', AT EAST
1 Jun 2026HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY SECURE THE LOOSE DOOR AT WEST IN THE KITCHENETTE LOCATED AT APT 260, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''North'', AT EAST
1 Jun 2026HousingBNOV SENT OUT27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 260, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''North'', AT EAST
26 May 2026HousingCNOV SENT OUT27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 1112, 11th STORY, 2nd APA
14 May 2026HousingBNOV SENT OUT27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1912, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''5'', AT NORTH
14 May 2026HousingBNOV SENT OUT27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1912, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''5'', AT NORTH
14 May 2026HousingANOV SENT OUT27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 1912, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''5'', AT NORTH
14 May 2026HousingANOTICE OF ISSUANCE SENT TO TENANT27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 1912, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''5'', AT NORTH
19 Mar 2026HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LAMINATE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH
19 Mar 2026HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LAMINATE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH
19 Mar 2026HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LAMINATE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH
19 Mar 2026HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LAMINATE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH
19 Feb 2026HousingCNOTICE OF ISSUANCE SENT TO TENANTHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1442, 14th STORY, 1st APARTMENT FROM EAST AT SOUTH
12 Feb 2026HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH
12 Feb 2026HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH
12 Feb 2026HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH
12 Feb 2026HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH
2 Feb 2026HousingCNOV SENT OUT27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 903, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH
15 Dec 2025HousingCNOV SENT OUT27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 448, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
15 Dec 2025HousingCNOV SENT OUT27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM EAST LOCATED AT APT 448, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
12 Aug 2025HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
12 Aug 2025HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
12 Aug 2025HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
12 Aug 2025HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE FOYER LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST
18 Jul 2025HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
18 Jul 2025HousingCNOV SENT OUT27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
18 Apr 2025HousingBNOT COMPLIED WITH27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE WOOD FLOOR SLATS IN THE PRIVATE HALLWAY LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 17564926 ISSUED 18-DEC-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTR
6 Feb 2025HousingBNOV SENT OUT27-2046.4 HMC: PROVIDE STOVE KNOB SAFETY COVERS OR PERMANENT STOVE SAFETY KNOBS WITH INTEGRATED LOCKING MECHANISMS FOR THE GAS STOVE TOP IN THE KITCHEN LOCATED AT APT 905, 9th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SouthWest
6 Feb 2025HousingBNOV SENT OUT27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MILDEW/ MISSING (CAULK) AT BATHTUB IN THE BATHROOM LOCATED AT APT 905, 9th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SouthWest
14 Jan 2025HousingBNOT COMPLIED WITH27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 903, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 17268291 ISSUED 13-SEP-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3
23 Oct 2024HousingANOV SENT OUT27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT SOUTH WALL IN THE 3rd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''5
23 Oct 2024HousingANOV SENT OUT27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 3rd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''5
16 Sep 2024HousingBNOV SENT OUT27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION SYSTEM AT CEILING IN THE BATHROOM LOCATED AT APT 903, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH
12 Jul 2024HousingBNOV SENT OUT27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE OVER MEDICINE CABINET AT WEST WALL. IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''North
12 Jul 2024HousingBNOV SENT OUT27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING AND BEHIND WEST WALL. IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''North
12 Jul 2024HousingBNOV SENT OUT27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL AND CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''North
12 Jul 2024HousingBNOV SENT OUT27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE FACUET AT WASH BASIN IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''North
12 Jul 2024HousingBNOV SENT OUT27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT BUILDING FRONT LEADING TO INTERCOM SYSTEM PANEL IN FORYER AT WEST WALL IN THE ENTRANCE LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''North
12 Jul 2024HousingBNOV SENT OUT27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGROUT TILES IN STANDING SHOWER . IN THE 1st BATHROOM FROM NORTH AT EAST LOCATED AT APT 903, 9th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''North
12 Jul 2024HousingBNOV SENT OUT27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTALITION SYSTEM AT CEILING IN THE 1st BATHROOM FROM NORTH AT EAST LOCATED AT APT 903, 9th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''North
24 Aug 2022EnforcementCLASS - 1ACTIVENOTE: AT THE TIME OF INSPECTION WHERE WORKER FALCONES CESAR WAS FOUND LAYING ON FLOOR. INSPECTOR REVEAL THAT WORKER WAS INSTALLING CABLE IN A 10FT CEILING VIA A 6FT LADDER, INSPECTOR ALSO REVEAL THAT PERMIT HO

Complaints

A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.

DateProblemTypeStatusClosed
8 Aug 2026Dirty WaterWater MaintenanceIn Progress
6 Aug 2026Posted Parking Sign ViolationIllegal ParkingClosed6 Aug 2026
5 Aug 2026ENTIRE BUILDINGHEAT/HOT WATERClosed8 Aug 2026
5 Aug 2026Blocked HydrantIllegal ParkingClosed5 Aug 2026
5 Aug 2026Blocked CrosswalkIllegal ParkingClosed5 Aug 2026
5 Aug 2026Posted Parking Sign ViolationIllegal ParkingClosed5 Aug 2026
3 Aug 2026Letter GradingFood EstablishmentIn Progress
3 Aug 2026Small uncovered dumpsterDumpster ComplaintClosed8 Aug 2026
3 Aug 2026Dirty WaterWater MaintenanceClosed4 Aug 2026
2 Aug 2026Blocked HydrantIllegal ParkingClosed2 Aug 2026
2 Aug 2026Blocked HydrantIllegal ParkingClosed2 Aug 2026
2 Aug 2026Blocked HydrantIllegal ParkingClosed2 Aug 2026
1 Aug 2026Posted Parking Sign ViolationIllegal ParkingClosed1 Aug 2026
1 Aug 2026Blocked HydrantIllegal ParkingClosed1 Aug 2026
31 Jul 2026Posted Parking Sign ViolationIllegal ParkingClosed31 Jul 2026
31 Jul 2026Blocked CrosswalkIllegal ParkingClosed31 Jul 2026
30 Jul 2026Loud Music/PartyNoise - ResidentialClosed30 Jul 2026
25 Jul 2026Loud Music/PartyNoise - Street/SidewalkClosed26 Jul 2026
25 Jul 2026Fire Hydrant Leaning/MissingWater MaintenanceClosed5 Aug 2026
24 Jul 2026Loud Music/PartyNoise - ResidentialClosed24 Jul 2026
21 Jul 2026Blocked HydrantIllegal ParkingClosed21 Jul 2026
21 Jul 2026Blocked HydrantIllegal ParkingClosed21 Jul 2026
19 Jul 2026Parking Permit Improper UseIllegal ParkingClosed19 Jul 2026
19 Jul 2026Parking Permit Improper UseIllegal ParkingClosed19 Jul 2026
18 Jul 2026BASIN/SINKPLUMBINGOpen
18 Jul 2026DOORDOOR/WINDOWOpen
17 Jul 2026Posted Parking Sign ViolationIllegal ParkingClosed17 Jul 2026
16 Jul 2026Dirty Water (WEWater SystemClosed20 Jul 2026
16 Jul 2026Boiler - Defective/Inoperative/No PermitBoilersClosed17 Jul 2026
16 Jul 2026Boiler - Defective/Inoperative/No PermitBoilersClosed28 Jul 2026
13 Jul 2026Lead Kit Request (Residential) (L10LeadClosed14 Jul 2026
13 Jul 2026MOLDUNSANITARY CONDITIONClosed17 Jul 2026
13 Jul 2026Blocked HydrantIllegal ParkingClosed13 Jul 2026
12 Jul 2026Blocked HydrantIllegal ParkingClosed12 Jul 2026
12 Jul 2026Blocked HydrantIllegal ParkingClosed12 Jul 2026
12 Jul 2026Posted Parking Sign ViolationIllegal ParkingClosed12 Jul 2026
11 Jul 2026Blocked HydrantIllegal ParkingClosed11 Jul 2026
10 Jul 2026Blocked HydrantIllegal ParkingClosed10 Jul 2026
9 Jul 2026Blocked HydrantIllegal ParkingClosed9 Jul 2026
9 Jul 2026Blocked HydrantIllegal ParkingClosed9 Jul 2026
6 Jul 2026Lead Kit Request (Residential) (L10LeadClosed6 Jul 2026
6 Jul 2026Lead Kit Request (Residential) (L10LeadClosed8 Jul 2026
6 Jul 2026Dirty Water (WEWater SystemClosed7 Jul 2026
4 Jul 2026Loud Music/PartyNoise - ResidentialClosed4 Jul 2026
3 Jul 2026Dirty Water (WEWater SystemClosed5 Jul 2026
2 Jul 2026SEWAGEUNSANITARY CONDITIONClosed8 Jul 2026
2 Jul 2026Dirty Water (WEWater SystemClosed5 Jul 2026
2 Jul 2026MOLDUNSANITARY CONDITIONClosed8 Jul 2026
30 Jun 2026Removal RequestIllegal DumpingClosed2 Jul 2026
30 Jun 2026Blocked HydrantIllegal ParkingClosed30 Jun 2026

Showing the 50 most recent of 150. The full set is available in the interactive report.

Permits & alterations

The absence of a permit does not prove no work was done — it may equally mean work was done without one.

IssuedTypeStatusWork
28 Mar 2025Mechanical SystemsPermit IssuedNEW MECHANICAL, AIR CONDITIONING & VENTILATION FOR NEW RESTAURANT. NO CHANGE TO ZONING USE, EGRESS OR OCCUPANCY
15 Jan 2025General ConstructionPermit IssuedINTERIOR WORK IN NORTH TOWER 1ST FLR FOR A NEW RESTAURANT. FLOOD COMPLIANCE WAS SUBMITTED & APPROVED UNDER 220151948 NB APPLICATION
19 Apr 2024FoundationSigned-offFoundation work for waterfront landscaping associated with NB #220151948
18 Apr 2024StructuralSigned-offStructural work for waterfront landscaping associated with NB #220151948
8 Dec 2023Earth WorkPermit IssuedApplication for work to regrade site in an A-Zone in order to remove land from an area of Special Flood Hazard pursuant to RCNY 3606-02
9 Nov 2023A3ISSUED
31 Aug 2023SignSigned-offINSTALL EXTERIOR ILLUMINATED GROUND SIGN (LINCOLN AT BANKSIDE
23 Jun 2023Supported ScaffoldSigned-offTEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
17 Apr 2023Protection and Mechanical MethodsSigned-offUse of temporary Jekko MPK 06 glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB-220151948
29 Mar 2023General ConstructionSigned-offThis application is filed for a Temporary Use Permit for model units on the 6th floor pursuant to section AC 28-11 and Building Bulletin 2010-002. Note that the leasing office is a separate TUP filing (FILING # X00834617-I1
23 Mar 2023Sidewalk ShedSigned-offINSTALLATION OF SIDEWALK SHED ON THE ROADWAY IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
8 Mar 2023Protection and Mechanical MethodsSigned-offINSTALLATION OF OVERHEAD PROTECTION IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY
14 Feb 2023PlumbingSigned-offSite drainage and utility work associated with NB #220151948
12 Dec 2022Protection and Mechanical MethodsSigned-offEAST TOWER CARS 5&6: INSTALLATION OF DUAL 7500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE,OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT
16 Nov 2022General ConstructionSigned-offINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
9 Nov 2022Curb CutSigned-offInstallation of Curb Cut in conjunction with NB
9 Nov 2022Curb CutSigned-offInstallation of Curb Cut in conjunction with NB
9 Nov 2022Curb CutSigned-offInstallation of curb cut in conjunction with NB
9 Nov 2022Curb CutSigned-offInstallation of Curb Cut in conjunction with NB
9 Nov 2022Curb CutSigned-offInstallation of Curb Cut in conjunction with NB
28 Oct 2022Boiler EquipmentSigned-offInstallation of boiler equipment as shown on plans submitted herewith in conjunction with NB application #220151948
16 Sep 2022Protection and Mechanical MethodsSigned-offINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THISAPPLICATION
7 Sep 2022Protection and Mechanical MethodsSigned-offApplication for the installation and use of a Spyder URW095 Mini Crane filed herein. No change in egress, use or occupancy
21 Jul 2022Protection and Mechanical MethodsSigned-offINSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
28 Jun 2022Supported ScaffoldSigned-offINSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
24 Jun 2022Protection and Mechanical MethodsSigned-offApplication for the installation and use of a Spyder URW095 Mini Crane filed herein. No change in egress, use or occupancy
21 Jun 2022Protection and Mechanical MethodsSigned-offINSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NB CONST, FILED SEP. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
23 May 2022Supported ScaffoldSigned-offINSTALLATION OF TEMPORARY SUPPORTED SCAFFOLD AS PER DRAWINGS.TEMPORARY SUPPORTED SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
12 May 2022Protection and Mechanical MethodsSigned-offAPPLICATION FOR THE INSTALLATION OF MOBILE EQUIPMENT FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY
8 Mar 2022General ConstructionSigned-offGeneral construction work as shown on plans to include interior renovations for temporary field office, in conjunction with NB # 220151948
21 Feb 2022Protection and Mechanical MethodsSigned-offSOUTH TOWER CARS 7&8: INSTALLATION OF DUAL 7500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE,OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT
21 Feb 2022Protection and Mechanical MethodsSigned-offNORTH TOWER CARS 3&4: INSTALLATION OF DUAL 7000# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT
15 Dec 2021Protection and Mechanical MethodsSigned-offINSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
8 Dec 2021StandpipeSigned-offTemporary standpipe in conjunction w/NB #220151948
8 Dec 2021PlumbingSigned-offUnderground plumbing in conjunction w/NB #220151948
17 Nov 2021Protection and Mechanical MethodsSigned-offUse of temporary Jekko MPK 06 glass manipulator construction equipment as per plans filed herewith. This application isfiled in conjunction with NB-220151948
17 Nov 2021Protection and Mechanical MethodsSigned-offUse of temporary Jekko MPK 06 glass manipulator construction equipment as per plans filed herewith. This application isfiled in conjunction with NB-220151948
10 Nov 2021Protection and Mechanical MethodsSigned-offUse of temporary Jekko MPK20 mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-220151948
22 Oct 2021Protection and Mechanical MethodsSigned-offUse of temporary Jekko SPX 527 mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-220151948
22 Oct 2021Protection and Mechanical MethodsSigned-offUse of temporary Spyder URW 094 mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-220151948
21 Oct 2021Protection and Mechanical MethodsSigned-offUse of temporary Jekko SPX 424 mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-220151948
29 Sep 2021Protection and Mechanical MethodsSigned-offINSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NB CONST, FILED SEP. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
27 Jul 2021A3ISSUED
23 Jul 2021A2ISSUED
6 May 2021A2ISSUED
30 Apr 2021Protection and Mechanical MethodsSigned-offINSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NB CONST, FILED SEP. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OREGRESS UNDER THIS APPLICATION
29 Apr 2021A2ISSUED
15 Apr 2021A2ISSUED
6 Apr 2021A2ISSUED
24 Mar 2021Protection and Mechanical MethodsSigned-offWEST TOWER CARS 1&2: INSTALLATION OF DUAL 7500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT

Showing the 50 most recent of 74. The full set is available in the interactive report.

Recorded documents

Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.

RecordedTypeAmountFromTo
30 Apr 2024DECL
14 Nov 2022SMIS
6 May 2022CERT
16 Mar 2022TL&R
16 Mar 2022Assignment
16 Mar 2022Mortgage$69,533,216
16 Mar 2022Agreement$135,433,216
16 Mar 2022Mortgage$185,531,906
16 Mar 2022Mortgage$117,184,878
16 Mar 2022AL&R$438,150,000
8 Sep 2021Agreement$154,613
6 Jul 2021EASE
11 Feb 2021SMTG
26 Jan 2021Agreement$3,481,228
20 Jan 2021SMIS
26 May 2020CERT
26 May 2020ZONE
14 Jan 2020RPTT&RET$143,922,329
12 Sep 2019EASE
11 Sep 2018AL&R$96,150,000
11 Sep 2018Satisfaction of mortgage
11 Sep 2018Deed$125,400,000
11 Sep 2018TL&R
11 Sep 2018Mortgage$96,150,000
22 Sep 2017SUBM
22 Sep 2017SMIS
13 Jan 2017Assignment
13 Jan 2017AALR
13 Sep 2016AALR
13 Sep 2016Assignment
16 Nov 2015CERT
16 Nov 2015ZONE
4 Feb 2015AL&R$31,900,000
4 Feb 2015Agreement$17,600,000
4 Feb 2015Mortgage$14,300,000
4 Feb 2015Agreement$31,900,000
4 Dec 2014AL&R$17,600,000
4 Dec 2014Mortgage$17,600,000
4 Dec 2014Deed$32,000,000
9 Aug 2004MLEA
12 Mar 1998SAGE
18 Mar 1997SAGE
27 Feb 1997LEAS
14 Feb 1995SAGE
31 Aug 1993EASE
20 Sep 1984MISC
26 Apr 1984MISC
26 Apr 1984MAPS
27 Sep 1983MISC
19 Aug 1983MISC

Showing the 50 most recent of 54. The full set is available in the interactive report.

About this page

Compiled from New York City public records — data retrieved 5 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.

This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.