101 Lincoln Avenue
Analysis
The building carries medium risk due to its over‑built residential floor area and a notable number of open violations, but its strong market‑to‑assessed value ratio, clean penalty record, and recent arm's‑length sale are positive factors.
The good
- market value on record ($171,420,000) far exceeds assessed value ($77,139,000)
- no enforcement or safety violation penalties owed
- no legal proceedings and not on tax lien list
- recent arm's‑length sale in 2018 for $125,400,000
The bad
- built beyond its residential floor‑area limit (residential FAR 7.62 vs limit 6.02)
- 47 open violations across the building
- 598 complaints recorded in public records
- over‑built status restricts any future residential expansion
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 7.62, against a residential limit of 6.02 — it is over that limit by 1.60. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
Unresolved conditions on record
47 violations remain open across 921 residential units (about 0.1 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Last recorded sale
Recorded at $125,400,000 on 11 Sep 2018 — $136,156 per residential unit, $129 per built square foot, 1.63× the assessed value.
Assessed value trend
Assessed value has risen 472.0% across the 5 assessment years on record (2023 to 2027), standing at $77,139,000. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.
Development & zoning
Floor-area ratio
| Built | 7.62 |
|---|---|
| Residential limit | 6.02 |
| Commercial limit | 5.00 |
| Community-facility limit | 6.50 |
Development headroom (calculated) calculated
| Highest permitted ratio | 6.50 |
|---|---|
| Unused ratio | -1.12 |
| Unused buildable area | — |
| Lot area | 127,721 sq ft |
Value & taxes
Assessment
| Assessed total | $77,139,000 |
|---|---|
| Assessed land | $1,436,850 |
| Assessed building | $75,702,150 |
| Market value on record | $171,420,000 |
| Assessed as % of market | 45.0% |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $77,139,000 |
| Tax rate | 12.502% |
| Estimated annual levy | $9,643,917.78 |
| Tax exemption (assessed value) | 421-a — $76,105,624 (through 2060) |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $77,139,000 | — |
| 2026 | $79,184,700 | -2.6% |
| 2025 | $71,631,900 | +10.5% |
| 2024 | $71,631,900 | 0.0% |
| 2023 | $13,485,150 | +431.2% |
Building & occupancy
Structure
| Year built | 2020 |
|---|---|
| Floors | 25 |
| Building area | 973,381 sq ft |
| Residential area | 862,512 sq ft |
| Commercial area | 110,869 sq ft |
Occupancy
| Total units | 926 |
|---|---|
| Residential units | 921 |
| Rent-stabilized | 734 |
| Free Market / Other | 187 |
| Storefronts | 2 |
| Residential Avg unit size | 936 sq ft (calculated) |
| Commercial Avg unit size | 22,174 sq ft (calculated) |
| Building class | D6 |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | 3 Av-138 St (6) — 0.31 mi |
|---|---|
| School district | 7 |
| Police precinct | 40 |
| Nearest firehouse | Battalion 12/Engine 35/Ladder 14 — 2282 Third Avenue |
Location risk
| Flood zone | High-risk (Zone AE) |
|---|---|
| Hurricane evacuation zone | Zone 1 |
| Projected floodplain | In the projected 2050s floodplain |
| Environmental restriction | Hazardous materials, air quality, noise |
| Cleanup site | Environmental cleanup site (completed) |
| City emergency repairs | 1 orders — $439 billed (through 2025) |
Energy & emissions
| Energy use intensity | 29.4 kBtu/ft² |
|---|---|
| Greenhouse-gas emissions | 2,982 metric tons/yr |
Record activity
Compliance calculated
| Open violations | 47 |
|---|---|
| Open per residential unit | 0.1 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $0.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 598 |
|---|---|
| Permits / alterations | 74 |
| Recorded documents | 54 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Bop 101 Lincoln Avenue LLC |
|---|---|
| Parcel | 2023160001 |
| Block | 2316 |
| Lot | 1 |
| Mortgage on record | $185,531,906 (2022) — Athene Annuity And Life Company |
| Fixture liens | 4 active fixture liens |
Last recorded transfer
| Date | 11 Sep 2018 |
|---|---|
| Recorded price | $125,400,000 |
| Price per unit | $136,156 |
| Price vs assessed | 1.63× |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 7 Aug 2026 | Housing | A | VIOLATION OPEN | — | 27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/Housing/SERVICES-AND-INFOR |
| 17 Jul 2026 | Housing | A | NOTICE OF ISSUANCE SENT TO TENANT | — | 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT EAST WALL IN THE BATHROOM LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH |
| 17 Jul 2026 | Housing | C | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD TILE AT FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH |
| 17 Jul 2026 | Housing | B | NOTICE OF ISSUANCE SENT TO TENANT | — | 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 1O SQ FT AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18717897 ISSUED 17-MAR-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CO |
| 22 Jun 2026 | Housing | B | NOTICE OF ISSUANCE SENT TO TENANT | — | 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT WEST WALL IN THE KITCHEN LOCATED AT APT 1442, 14th STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18652641 ISSUED 18-FEB-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-201 |
| 1 Jun 2026 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT EAST WALL IN THE BATHROOM LOCATED AT APT 260, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''North'', AT EAST |
| 1 Jun 2026 | Housing | C | NOV SENT OUT | — | 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER SUPPLY EXCEEDING 130F DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 260, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''North'', AT EAST |
| 1 Jun 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY SECURE THE LOOSE DOOR AT WEST IN THE KITCHENETTE LOCATED AT APT 260, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''North'', AT EAST |
| 1 Jun 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 260, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''North'', AT EAST |
| 26 May 2026 | Housing | C | NOV SENT OUT | — | 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 1112, 11th STORY, 2nd APA |
| 14 May 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1912, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''5'', AT NORTH |
| 14 May 2026 | Housing | B | NOV SENT OUT | — | 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1912, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''5'', AT NORTH |
| 14 May 2026 | Housing | A | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 1912, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''5'', AT NORTH |
| 14 May 2026 | Housing | A | NOTICE OF ISSUANCE SENT TO TENANT | — | 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 1912, 18th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''5'', AT NORTH |
| 19 Mar 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LAMINATE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH |
| 19 Mar 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LAMINATE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH |
| 19 Mar 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LAMINATE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH |
| 19 Mar 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LAMINATE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH |
| 19 Feb 2026 | Housing | C | NOTICE OF ISSUANCE SENT TO TENANT | — | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1442, 14th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| 12 Feb 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH |
| 12 Feb 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH |
| 12 Feb 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH |
| 12 Feb 2026 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH |
| 2 Feb 2026 | Housing | C | NOV SENT OUT | — | 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 903, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| 15 Dec 2025 | Housing | C | NOV SENT OUT | — | 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 448, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| 15 Dec 2025 | Housing | C | NOV SENT OUT | — | 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE 1st ROOM FROM EAST LOCATED AT APT 448, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| 12 Aug 2025 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST |
| 12 Aug 2025 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST |
| 12 Aug 2025 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM EAST LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST |
| 12 Aug 2025 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE FOYER LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHWEST |
| 18 Jul 2025 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| 18 Jul 2025 | Housing | C | NOV SENT OUT | — | 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| 18 Apr 2025 | Housing | B | NOT COMPLIED WITH | — | 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE WOOD FLOOR SLATS IN THE PRIVATE HALLWAY LOCATED AT APT 332, 3rd STORY, 6th APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 17564926 ISSUED 18-DEC-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTR |
| 6 Feb 2025 | Housing | B | NOV SENT OUT | — | 27-2046.4 HMC: PROVIDE STOVE KNOB SAFETY COVERS OR PERMANENT STOVE SAFETY KNOBS WITH INTEGRATED LOCKING MECHANISMS FOR THE GAS STOVE TOP IN THE KITCHEN LOCATED AT APT 905, 9th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SouthWest |
| 6 Feb 2025 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MILDEW/ MISSING (CAULK) AT BATHTUB IN THE BATHROOM LOCATED AT APT 905, 9th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SouthWest |
| 14 Jan 2025 | Housing | B | NOT COMPLIED WITH | — | 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 903, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 17268291 ISSUED 13-SEP-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3 |
| 23 Oct 2024 | Housing | A | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT SOUTH WALL IN THE 3rd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''5 |
| 23 Oct 2024 | Housing | A | NOV SENT OUT | — | 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 3rd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''5 |
| 16 Sep 2024 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION SYSTEM AT CEILING IN THE BATHROOM LOCATED AT APT 903, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| 12 Jul 2024 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE OVER MEDICINE CABINET AT WEST WALL. IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''North |
| 12 Jul 2024 | Housing | B | NOV SENT OUT | — | 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ABOVE CEILING AND BEHIND WEST WALL. IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''North |
| 12 Jul 2024 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL AND CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''North |
| 12 Jul 2024 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE FACUET AT WASH BASIN IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''North |
| 12 Jul 2024 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT BUILDING FRONT LEADING TO INTERCOM SYSTEM PANEL IN FORYER AT WEST WALL IN THE ENTRANCE LOCATED AT APT 303, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''North |
| 12 Jul 2024 | Housing | B | NOV SENT OUT | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGROUT TILES IN STANDING SHOWER . IN THE 1st BATHROOM FROM NORTH AT EAST LOCATED AT APT 903, 9th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''North |
| 12 Jul 2024 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTALITION SYSTEM AT CEILING IN THE 1st BATHROOM FROM NORTH AT EAST LOCATED AT APT 903, 9th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''North |
| 24 Aug 2022 | Enforcement | CLASS - 1 | ACTIVE | — | NOTE: AT THE TIME OF INSPECTION WHERE WORKER FALCONES CESAR WAS FOUND LAYING ON FLOOR. INSPECTOR REVEAL THAT WORKER WAS INSTALLING CABLE IN A 10FT CEILING VIA A 6FT LADDER, INSPECTOR ALSO REVEAL THAT PERMIT HO |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 8 Aug 2026 | Dirty Water | Water Maintenance | In Progress | — |
| 6 Aug 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 6 Aug 2026 |
| 5 Aug 2026 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 8 Aug 2026 |
| 5 Aug 2026 | Blocked Hydrant | Illegal Parking | Closed | 5 Aug 2026 |
| 5 Aug 2026 | Blocked Crosswalk | Illegal Parking | Closed | 5 Aug 2026 |
| 5 Aug 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 5 Aug 2026 |
| 3 Aug 2026 | Letter Grading | Food Establishment | In Progress | — |
| 3 Aug 2026 | Small uncovered dumpster | Dumpster Complaint | Closed | 8 Aug 2026 |
| 3 Aug 2026 | Dirty Water | Water Maintenance | Closed | 4 Aug 2026 |
| 2 Aug 2026 | Blocked Hydrant | Illegal Parking | Closed | 2 Aug 2026 |
| 2 Aug 2026 | Blocked Hydrant | Illegal Parking | Closed | 2 Aug 2026 |
| 2 Aug 2026 | Blocked Hydrant | Illegal Parking | Closed | 2 Aug 2026 |
| 1 Aug 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 1 Aug 2026 |
| 1 Aug 2026 | Blocked Hydrant | Illegal Parking | Closed | 1 Aug 2026 |
| 31 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 31 Jul 2026 |
| 31 Jul 2026 | Blocked Crosswalk | Illegal Parking | Closed | 31 Jul 2026 |
| 30 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 30 Jul 2026 |
| 25 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 26 Jul 2026 |
| 25 Jul 2026 | Fire Hydrant Leaning/Missing | Water Maintenance | Closed | 5 Aug 2026 |
| 24 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 24 Jul 2026 |
| 21 Jul 2026 | Blocked Hydrant | Illegal Parking | Closed | 21 Jul 2026 |
| 21 Jul 2026 | Blocked Hydrant | Illegal Parking | Closed | 21 Jul 2026 |
| 19 Jul 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 19 Jul 2026 |
| 19 Jul 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 19 Jul 2026 |
| 18 Jul 2026 | BASIN/SINK | PLUMBING | Open | — |
| 18 Jul 2026 | DOOR | DOOR/WINDOW | Open | — |
| 17 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 17 Jul 2026 |
| 16 Jul 2026 | Dirty Water (WE | Water System | Closed | 20 Jul 2026 |
| 16 Jul 2026 | Boiler - Defective/Inoperative/No Permit | Boilers | Closed | 17 Jul 2026 |
| 16 Jul 2026 | Boiler - Defective/Inoperative/No Permit | Boilers | Closed | 28 Jul 2026 |
| 13 Jul 2026 | Lead Kit Request (Residential) (L10 | Lead | Closed | 14 Jul 2026 |
| 13 Jul 2026 | MOLD | UNSANITARY CONDITION | Closed | 17 Jul 2026 |
| 13 Jul 2026 | Blocked Hydrant | Illegal Parking | Closed | 13 Jul 2026 |
| 12 Jul 2026 | Blocked Hydrant | Illegal Parking | Closed | 12 Jul 2026 |
| 12 Jul 2026 | Blocked Hydrant | Illegal Parking | Closed | 12 Jul 2026 |
| 12 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 12 Jul 2026 |
| 11 Jul 2026 | Blocked Hydrant | Illegal Parking | Closed | 11 Jul 2026 |
| 10 Jul 2026 | Blocked Hydrant | Illegal Parking | Closed | 10 Jul 2026 |
| 9 Jul 2026 | Blocked Hydrant | Illegal Parking | Closed | 9 Jul 2026 |
| 9 Jul 2026 | Blocked Hydrant | Illegal Parking | Closed | 9 Jul 2026 |
| 6 Jul 2026 | Lead Kit Request (Residential) (L10 | Lead | Closed | 6 Jul 2026 |
| 6 Jul 2026 | Lead Kit Request (Residential) (L10 | Lead | Closed | 8 Jul 2026 |
| 6 Jul 2026 | Dirty Water (WE | Water System | Closed | 7 Jul 2026 |
| 4 Jul 2026 | Loud Music/Party | Noise - Residential | Closed | 4 Jul 2026 |
| 3 Jul 2026 | Dirty Water (WE | Water System | Closed | 5 Jul 2026 |
| 2 Jul 2026 | SEWAGE | UNSANITARY CONDITION | Closed | 8 Jul 2026 |
| 2 Jul 2026 | Dirty Water (WE | Water System | Closed | 5 Jul 2026 |
| 2 Jul 2026 | MOLD | UNSANITARY CONDITION | Closed | 8 Jul 2026 |
| 30 Jun 2026 | Removal Request | Illegal Dumping | Closed | 2 Jul 2026 |
| 30 Jun 2026 | Blocked Hydrant | Illegal Parking | Closed | 30 Jun 2026 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 28 Mar 2025 | Mechanical Systems | Permit Issued | NEW MECHANICAL, AIR CONDITIONING & VENTILATION FOR NEW RESTAURANT. NO CHANGE TO ZONING USE, EGRESS OR OCCUPANCY |
| 15 Jan 2025 | General Construction | Permit Issued | INTERIOR WORK IN NORTH TOWER 1ST FLR FOR A NEW RESTAURANT. FLOOD COMPLIANCE WAS SUBMITTED & APPROVED UNDER 220151948 NB APPLICATION |
| 19 Apr 2024 | Foundation | Signed-off | Foundation work for waterfront landscaping associated with NB #220151948 |
| 18 Apr 2024 | Structural | Signed-off | Structural work for waterfront landscaping associated with NB #220151948 |
| 8 Dec 2023 | Earth Work | Permit Issued | Application for work to regrade site in an A-Zone in order to remove land from an area of Special Flood Hazard pursuant to RCNY 3606-02 |
| 9 Nov 2023 | A3 | ISSUED | — |
| 31 Aug 2023 | Sign | Signed-off | INSTALL EXTERIOR ILLUMINATED GROUND SIGN (LINCOLN AT BANKSIDE |
| 23 Jun 2023 | Supported Scaffold | Signed-off | TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 17 Apr 2023 | Protection and Mechanical Methods | Signed-off | Use of temporary Jekko MPK 06 glass manipulator construction equipment as per plans filed herewith. This application is filed in conjunction with NB-220151948 |
| 29 Mar 2023 | General Construction | Signed-off | This application is filed for a Temporary Use Permit for model units on the 6th floor pursuant to section AC 28-11 and Building Bulletin 2010-002. Note that the leasing office is a separate TUP filing (FILING # X00834617-I1 |
| 23 Mar 2023 | Sidewalk Shed | Signed-off | INSTALLATION OF SIDEWALK SHED ON THE ROADWAY IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY |
| 8 Mar 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF OVERHEAD PROTECTION IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY |
| 14 Feb 2023 | Plumbing | Signed-off | Site drainage and utility work associated with NB #220151948 |
| 12 Dec 2022 | Protection and Mechanical Methods | Signed-off | EAST TOWER CARS 5&6: INSTALLATION OF DUAL 7500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE,OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT |
| 16 Nov 2022 | General Construction | Signed-off | INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 9 Nov 2022 | Curb Cut | Signed-off | Installation of Curb Cut in conjunction with NB |
| 9 Nov 2022 | Curb Cut | Signed-off | Installation of Curb Cut in conjunction with NB |
| 9 Nov 2022 | Curb Cut | Signed-off | Installation of curb cut in conjunction with NB |
| 9 Nov 2022 | Curb Cut | Signed-off | Installation of Curb Cut in conjunction with NB |
| 9 Nov 2022 | Curb Cut | Signed-off | Installation of Curb Cut in conjunction with NB |
| 28 Oct 2022 | Boiler Equipment | Signed-off | Installation of boiler equipment as shown on plans submitted herewith in conjunction with NB application #220151948 |
| 16 Sep 2022 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THISAPPLICATION |
| 7 Sep 2022 | Protection and Mechanical Methods | Signed-off | Application for the installation and use of a Spyder URW095 Mini Crane filed herein. No change in egress, use or occupancy |
| 21 Jul 2022 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 28 Jun 2022 | Supported Scaffold | Signed-off | INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 24 Jun 2022 | Protection and Mechanical Methods | Signed-off | Application for the installation and use of a Spyder URW095 Mini Crane filed herein. No change in egress, use or occupancy |
| 21 Jun 2022 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NB CONST, FILED SEP. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 23 May 2022 | Supported Scaffold | Signed-off | INSTALLATION OF TEMPORARY SUPPORTED SCAFFOLD AS PER DRAWINGS.TEMPORARY SUPPORTED SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 12 May 2022 | Protection and Mechanical Methods | Signed-off | APPLICATION FOR THE INSTALLATION OF MOBILE EQUIPMENT FILED HEREIN. NO CHANGE IN EGRESS, USE OR OCCUPANCY |
| 8 Mar 2022 | General Construction | Signed-off | General construction work as shown on plans to include interior renovations for temporary field office, in conjunction with NB # 220151948 |
| 21 Feb 2022 | Protection and Mechanical Methods | Signed-off | SOUTH TOWER CARS 7&8: INSTALLATION OF DUAL 7500# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE,OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT |
| 21 Feb 2022 | Protection and Mechanical Methods | Signed-off | NORTH TOWER CARS 3&4: INSTALLATION OF DUAL 7000# CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT |
| 15 Dec 2021 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 8 Dec 2021 | Standpipe | Signed-off | Temporary standpipe in conjunction w/NB #220151948 |
| 8 Dec 2021 | Plumbing | Signed-off | Underground plumbing in conjunction w/NB #220151948 |
| 17 Nov 2021 | Protection and Mechanical Methods | Signed-off | Use of temporary Jekko MPK 06 glass manipulator construction equipment as per plans filed herewith. This application isfiled in conjunction with NB-220151948 |
| 17 Nov 2021 | Protection and Mechanical Methods | Signed-off | Use of temporary Jekko MPK 06 glass manipulator construction equipment as per plans filed herewith. This application isfiled in conjunction with NB-220151948 |
| 10 Nov 2021 | Protection and Mechanical Methods | Signed-off | Use of temporary Jekko MPK20 mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-220151948 |
| 22 Oct 2021 | Protection and Mechanical Methods | Signed-off | Use of temporary Jekko SPX 527 mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-220151948 |
| 22 Oct 2021 | Protection and Mechanical Methods | Signed-off | Use of temporary Spyder URW 094 mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-220151948 |
| 21 Oct 2021 | Protection and Mechanical Methods | Signed-off | Use of temporary Jekko SPX 424 mini crane construction equipment as per plans filed herewith. This application is filed in conjunction with NB-220151948 |
| 29 Sep 2021 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NB CONST, FILED SEP. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 27 Jul 2021 | A3 | ISSUED | — |
| 23 Jul 2021 | A2 | ISSUED | — |
| 6 May 2021 | A2 | ISSUED | — |
| 30 Apr 2021 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY OVERHEAD PROTECTION DURING NB CONST, FILED SEP. TEMPORARY OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OREGRESS UNDER THIS APPLICATION |
| 29 Apr 2021 | A2 | ISSUED | — |
| 15 Apr 2021 | A2 | ISSUED | — |
| 6 Apr 2021 | A2 | ISSUED | — |
| 24 Mar 2021 | Protection and Mechanical Methods | Signed-off | WEST TOWER CARS 1&2: INSTALLATION OF DUAL 7500 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONSTRUCTION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT |
Showing the 50 most recent of 74. The full set is available in the interactive report.
Recorded documents
Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.
| Recorded | Type | Amount | From | To |
|---|---|---|---|---|
| 30 Apr 2024 | DECL | — | — | — |
| 14 Nov 2022 | SMIS | — | — | — |
| 6 May 2022 | CERT | — | — | — |
| 16 Mar 2022 | TL&R | — | — | — |
| 16 Mar 2022 | Assignment | — | — | — |
| 16 Mar 2022 | Mortgage | $69,533,216 | — | — |
| 16 Mar 2022 | Agreement | $135,433,216 | — | — |
| 16 Mar 2022 | Mortgage | $185,531,906 | — | — |
| 16 Mar 2022 | Mortgage | $117,184,878 | — | — |
| 16 Mar 2022 | AL&R | $438,150,000 | — | — |
| 8 Sep 2021 | Agreement | $154,613 | — | — |
| 6 Jul 2021 | EASE | — | — | — |
| 11 Feb 2021 | SMTG | — | — | — |
| 26 Jan 2021 | Agreement | $3,481,228 | — | — |
| 20 Jan 2021 | SMIS | — | — | — |
| 26 May 2020 | CERT | — | — | — |
| 26 May 2020 | ZONE | — | — | — |
| 14 Jan 2020 | RPTT&RET | $143,922,329 | — | — |
| 12 Sep 2019 | EASE | — | — | — |
| 11 Sep 2018 | AL&R | $96,150,000 | — | — |
| 11 Sep 2018 | Satisfaction of mortgage | — | — | — |
| 11 Sep 2018 | Deed | $125,400,000 | — | — |
| 11 Sep 2018 | TL&R | — | — | — |
| 11 Sep 2018 | Mortgage | $96,150,000 | — | — |
| 22 Sep 2017 | SUBM | — | — | — |
| 22 Sep 2017 | SMIS | — | — | — |
| 13 Jan 2017 | Assignment | — | — | — |
| 13 Jan 2017 | AALR | — | — | — |
| 13 Sep 2016 | AALR | — | — | — |
| 13 Sep 2016 | Assignment | — | — | — |
| 16 Nov 2015 | CERT | — | — | — |
| 16 Nov 2015 | ZONE | — | — | — |
| 4 Feb 2015 | AL&R | $31,900,000 | — | — |
| 4 Feb 2015 | Agreement | $17,600,000 | — | — |
| 4 Feb 2015 | Mortgage | $14,300,000 | — | — |
| 4 Feb 2015 | Agreement | $31,900,000 | — | — |
| 4 Dec 2014 | AL&R | $17,600,000 | — | — |
| 4 Dec 2014 | Mortgage | $17,600,000 | — | — |
| 4 Dec 2014 | Deed | $32,000,000 | — | — |
| 9 Aug 2004 | MLEA | — | — | — |
| 12 Mar 1998 | SAGE | — | — | — |
| 18 Mar 1997 | SAGE | — | — | — |
| 27 Feb 1997 | LEAS | — | — | — |
| 14 Feb 1995 | SAGE | — | — | — |
| 31 Aug 1993 | EASE | — | — | — |
| 20 Sep 1984 | MISC | — | — | — |
| 26 Apr 1984 | MISC | — | — | — |
| 26 Apr 1984 | MAPS | — | — | — |
| 27 Sep 1983 | MISC | — | — | — |
| 19 Aug 1983 | MISC | — | — | — |
Showing the 50 most recent of 54. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 5 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.