The property shows strong valuation upside and recent transaction data, but the over‑built status and open violations create notable risk.
The good
- Recent arm's‑length sale in 2025 for $140,000,000 provides a clear market benchmark
- Market value on record of $196,926,000 is substantially above the assessed value of $88,616,700, indicating potential upside
- Average unit size of 807 sq ft across 884 residential units offers a sizable inventory for rental or resale
The bad
- Built beyond the residential floor‑area limit (19.35 FAR vs 10 FAR) – the building is over‑built and cannot be expanded
- 35 open violations recorded in city records, a material compliance concern
- Enforcement penalties are $0, but safety‑violation penalties are not listed, so undisclosed debt may exist
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 19.35, against a residential limit of 10.00 — it is over that limit by 9.35. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
Unresolved conditions on record
35 violations remain open across 884 residential units (about 0.0 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Last recorded sale
Recorded at $140,000,000 on 19 Feb 2025 — $158,371 per residential unit, $192 per built square foot, 1.58× the assessed value.
Assessed value trend
Assessed value has fallen 11.6% across the 5 assessment years on record (2023 to 2027), standing at $88,616,700. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.
Development & zoning
Floor-area ratio
| Built | 19.35 |
|---|---|
| Residential limit | 10.00 |
| Commercial limit | 15.00 |
| Community-facility limit | 15.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 15.00 |
|---|---|
| Unused ratio | -4.35 |
| Unused buildable area | — |
| Lot area | 37,657 sq ft |
Value & taxes
Assessment
| Assessed total | $88,616,700 |
|---|---|
| Assessed land | $21,825,000 |
| Assessed building | $66,791,700 |
| Market value on record | $196,926,000 |
| Assessed as % of market | 45.0% |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $81,030,817 |
| Tax rate | 12.502% |
| Estimated annual levy | $10,130,472.74 |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $88,616,700 | — |
| 2026 | $109,467,900 | -19.0% |
| 2025 | $162,923,850 | -32.8% |
| 2024 | $159,765,750 | +2.0% |
| 2023 | $100,234,350 | +59.4% |
Building & occupancy
Structure
| Year built | 1960 |
|---|---|
| Floors | 37 |
| Building area | 728,739 sq ft |
| Residential area | 713,229 sq ft |
| Commercial area | 15,510 sq ft |
Occupancy
| Total units | 886 |
|---|---|
| Residential units | 884 |
| Residential Avg unit size | 807 sq ft (calculated) |
| Commercial Avg unit size | 7,755 sq ft (calculated) |
| Building class | D6 |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | Grand Central-42 St (7) — 0.2 mi |
|---|---|
| School district | 2 |
| Police precinct | 17 |
| Nearest firehouse | Engine 21 — 238 East 40 Street |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Not in an evacuation zone |
| Environmental restriction | Hazardous materials, air quality, noise |
| Cleanup site | Environmental cleanup site (active) |
Energy & emissions
| Energy grade | D |
|---|---|
| Energy use intensity | 49.5 kBtu/ft² |
| Greenhouse-gas emissions | 3,172 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 205 East 42 Street, 1 | 2025-11-10 | $11,347,216 | — | — |
| 205 East 42 Street, 211 | 2025-11-10 | $11,347,216 | — | — |
| 205 East 42 Street, 215 | 2025-11-10 | $11,347,216 | — | — |
| 205 East 42 Street, 8 | 2025-11-10 | $11,347,216 | — | — |
| 205 East 42 Street, 5 | 2025-11-10 | $62,217,784 | — | — |
| 205 East 42 Street, Admis | 2025-11-10 | $62,217,784 | — | — |
| 205 East 42 Street, St210 | 2025-11-10 | $11,347,216 | — | — |
| 205 East 42 Street, 2 | 2025-11-10 | $62,217,784 | — | — |
Record activity
Compliance calculated
| Open violations | 35 |
|---|---|
| Open per residential unit | 0.0 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | — |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 95 |
|---|---|
| Permits / alterations | 217 |
| Recorded documents | 56 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | 235 Fee Owner LLC |
|---|---|
| Parcel | 1013160023 |
| Block | 1316 |
| Lot | 23 |
| Mortgage on record | $315,000,000 (2025) — 219 And 235 East 42nd Lender 1 LLC — note assigned |
| Fixture liens | 4 active fixture liens |
Last recorded transfer
| Date | 19 Feb 2025 |
|---|---|
| Recorded price | $140,000,000 |
| Price per unit | $158,371 |
| Price vs assessed | 1.58× |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 9 Jul 2026 | Building | — | V-Building VIOLATION - ACTIVE | — | SHOP DWGS - STEEL HIGH-RISE UNDER PERMITTED ALT. COLUMNS BUCKLING FL 21-22. REMEDY:SUBMIT APPROVED/ACCEPTED STEEL SHOP DRAWINGS BY 7/16/26 |
| 7 Jul 2026 | Building | — | V-Building VIOLATION - ACTIVE | — | EMERGENCY WORK:STEEL HIGH-RISE UNDER PERMITTED ALT.W/SEVERE DAMAGE, DEFORMATION&COLLAPSE RISK.COLUMNS BUCKLING FL21-22. BLDG COMPROMISED; HAZARD TO SITE, PUBLIC & ADJOINING PROPERTIES.REMEDY:STABILIZE SITE W/ PE,CS,SSM,GC. DOCS DUE 4PM 7/7/26;START 5PM. DAILY REPORTS&FULL-TIME SUPV REQ. FILE APP IN |
| 7 Jul 2026 | Building | — | V-Building VIOLATION - ACTIVE | — | STRUCTURE RENDERED NON-COMPLIANT. OBSERVED PREMISES UNDER ALTERATION #M01075133-S3-ST. STRUCTURAL STEEL MEMBERS AT UPPER FLOORS HAVE FAILED COMPROMISING STRUCTURAL STABILITY. BUILDING IN DANGER OF COLLAPSING |
| 7 Jul 2026 | Building | — | V-Building VIOLATION - ACTIVE | — | FTM/ADDL INFO:STEEL HIGH-RISE UNDER PERMITTED ALT. WITH SEVERE DAMAGE, DEFORMATION&COLLAPSE RISK. COLUMNS BUCKLING FL 21-22.FULL EXTENT OF DMG UNKNOWN, CONCEALED BY FINISHES.REMEDY:PE TO SUPV SAFE FINISH RMVL & 100% HANDS-ON INSP EXPOSED STRUCT STL/CONNS. RPT BY 7/14/26 |
| 7 Jul 2026 | Building | — | V-Building VIOLATION - ACTIVE | — | INSPN RPTS/RECORDS-STEEL HIGH-RISE UNDER PERMITTED ALT. WIT SEVERE DAMAGE,DEFORMATION&COLLAPSE RISK.COLUMNS BUCKLING FL 21-22 REMEDY:SUBMIT INSP RPTS,FIELD NOTES,Building TR FORMS & SUMMARY OF NCRS BY 7/8/26 |
| 7 Jul 2026 | Building | — | V-Building VIOLATION - ACTIVE | — | PLUMNESS SURVEY:STEEL HIGH-RISE UNDER PERMITTED ALT.WITH SEVERE DAMAGE,DEFORMATION&COLLAPSE RISK.COLUMNS BUCKLING FL 21-22.BLDG COMPROMISED;HAZARD TO SITE,PUBLIC & ADJOINING PROPERTIES.REMEDY:BY 7/14/26:PROVIDE PLUMBNESS SURVEY (MIN N&W EXPOSURES)SEALED BY NYS PLS RETAIN PE TO SCOPE & SUPERVISE PROG |
| 7 Jul 2026 | Building | — | V-Building VIOLATION - ACTIVE | — | PEER REVIEW-DEPT ORDERING STRUCTURAL PEER REVIEW.STEEL HIGH-RISE UNDER PERMITTED ALT.COLUMNS BUCKLING FL 21-22.REMEDY:PROVIDE NAMES OF 3 PE'S BY 7/14/26. SUBMIT PEER REVIEW REPORT BY 8/14/26 |
| 7 Jul 2026 | Building | — | V-Building VIOLATION - ACTIVE | — | FORENSIC INVESTIGATION-DEPT ORDERING FORENSIC ENG. INVESTIGATION STEEL HIGH-RISE UNDER PERMITTED ALT. COLUMNS BUCKLING FL 21-22 REMEDY:PROVIDE NAMES OF 3 PES BY 7/14/26.SUBMIT FORENSIC ENGINEERING INVESTIGATION REPORT BY 8/31/26 |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 4 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 1 Apr 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 12 May 2008 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 24 Jul 2026 | Site Conditions Endangering Workers | General Construction/Plumbing | Closed | 25 Jul 2026 |
| 16 Jul 2026 | Working Contrary To Stop Work Order | General Construction/Plumbing | Closed | 16 Jul 2026 |
| 7 Jul 2026 | Debris - Excessive | General Construction/Plumbing | Closed | 9 Jul 2026 |
| 7 Jul 2026 | Cons - Contrary/Beyond Approved Plans/Permits | General Construction/Plumbing | Closed | 9 Jul 2026 |
| 29 Jun 2026 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
| 21 May 2026 | Street Light Out | Street Light Condition | Closed | 26 May 2026 |
| 15 May 2026 | Elevator - Multiple Devices On Property | Elevator | Closed | 19 May 2026 |
| 29 Apr 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 30 Apr 2026 |
| 24 Apr 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 30 Apr 2026 |
| 22 Apr 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 23 Apr 2026 |
| 10 Apr 2026 | Demolition - Unsafe | BEST/Site Safety | Closed | 11 Apr 2026 |
| 30 Mar 2026 | Air: Dust, Construction/Demolition (AE4 | Air Quality | Closed | 2 Apr 2026 |
| 24 Mar 2026 | Debris - Falling Or In Danger Of Falling | General Construction/Plumbing | Closed | 24 Mar 2026 |
| 2 Mar 2026 | Trash | Dirty Condition | Closed | 2 Mar 2026 |
| 30 Jan 2026 | Bike Lane | Snow or Ice | Closed | 2 Feb 2026 |
| 23 Dec 2025 | Food Vendor | Vendor Enforcement | Closed | 23 Dec 2025 |
| 10 Nov 2025 | Non-Chronic | Homeless Person Assistance | Closed | 10 Nov 2025 |
| 3 Nov 2025 | Driver Complaint - Passenger | Taxi Complaint | In Progress | — |
| 28 Oct 2025 | Banging/Pounding | Noise - Residential | Closed | 28 Oct 2025 |
| 15 Oct 2025 | Asbestos Complaint (B1 | Asbestos | Closed | 15 Oct 2025 |
| 9 Oct 2025 | Site Conditions Endangering Workers | General Construction/Plumbing | Closed | 10 Oct 2025 |
| 8 Oct 2025 | Unauthorized Bus Layover | Illegal Parking | Closed | 8 Oct 2025 |
| 8 Oct 2025 | Noise: Construction Equipment (NC1 | Noise | Closed | 15 Oct 2025 |
| 30 Sep 2025 | Blocked - Construction | Street Condition | Closed | 30 Sep 2025 |
| 3 Sep 2025 | Crane/Suspension Scaffold - No Permit/License/Cert./Unsafe/Illegal | Cranes and Derricks | Closed | 5 Sep 2025 |
| 3 Sep 2025 | Debris - Excessive | General Construction/Plumbing | Closed | 6 Oct 2025 |
| 26 Aug 2025 | Building Permit - None | General Construction/Plumbing | Closed | 29 Aug 2025 |
| 23 Aug 2025 | Site Conditions Endangering Workers | General Construction/Plumbing | Closed | 25 Aug 2025 |
| 20 Aug 2025 | Air: Dust, Construction/Demolition (AE4 | Air Quality | Closed | 22 Aug 2025 |
| 20 Aug 2025 | Loud Talking | Noise - Street/Sidewalk | Closed | 20 Aug 2025 |
| 18 Aug 2025 | Loud Talking | Noise - Street/Sidewalk | Closed | 18 Aug 2025 |
| 15 Aug 2025 | Cons - Contrary/Beyond Approved Plans/Permits | General Construction/Plumbing | Closed | 20 Aug 2025 |
| 12 Aug 2025 | Working Contrary To Stop Work Order | General Construction/Plumbing | Closed | 12 Aug 2025 |
| 7 Aug 2025 | Site Conditions Endangering Workers | General Construction/Plumbing | Closed | 7 Aug 2025 |
| 7 Aug 2025 | Working Contrary To Stop Work Order | General Construction/Plumbing | Closed | 7 Aug 2025 |
| 6 Aug 2025 | Debris - Falling Or In Danger Of Falling | General Construction/Plumbing | Closed | 7 Aug 2025 |
| 23 Jul 2025 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 24 Jul 2025 |
| 21 Jul 2025 | Debris - Falling Or In Danger Of Falling | General Construction/Plumbing | Closed | 24 Jul 2025 |
| 21 Jul 2025 | Blocked - Construction | Street Condition | Closed | 21 Jul 2025 |
| 16 Jul 2025 | Advertising Sign/Billboard/Posters/Flexible Fabric - Illegal | Special Projects Inspection Team (SPIT | Closed | 24 Nov 2025 |
| 8 Jul 2025 | Blocked - Construction | Street Condition | Closed | 8 Jul 2025 |
| 8 Jul 2025 | Work Without A Permit - Occupied Multiple Dwelling | Real Time Enforcement | Closed | 8 Jul 2025 |
| 7 Jul 2025 | Air: Dust, Other (Use Comments) (AE5 | Air Quality | Closed | 9 Jul 2025 |
| 7 Jul 2025 | Debris - Excessive | General Construction/Plumbing | Closed | 31 Jul 2025 |
| 7 Jul 2025 | Site Conditions Endangering Workers | General Construction/Plumbing | Closed | 7 Jul 2025 |
| 28 Jun 2025 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 5 Jul 2025 |
| 28 Jun 2025 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 1 Jul 2025 |
| 18 Jun 2025 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 18 Jun 2025 |
| 17 Jun 2025 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 17 Jun 2025 |
| 7 Jun 2025 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 14 Jun 2025 |
Showing the 50 most recent of 95. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 11 Jun 2026 | Suspended Scaffold | Permit Issued | Installation of suspended scaffold for facade repair & inspection |
| 5 Jun 2026 | Foundation | Permit Issued | Foundation work as shown on the plans |
| 21 Apr 2026 | General Construction | Permit Issued | THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR A SALES OFFICE INCLUDING MODEL APARTMENTS PURSUANT TO SECTION AC 28-111 AND BUILDINGS BULLETIN 2010-002 |
| 10 Mar 2026 | Suspended Scaffold | Permit Issued | Installation of outrigger for facade repair & inspection |
| 19 Nov 2025 | Protection and Mechanical Methods | Permit Issued | USE OF MECHANICAL EQUIPMENT FOR PLUMBING TRENCHES (FILED SEPARATELY) AS PER PLANS |
| 18 Aug 2025 | Structural | Signed-off | Structural work as shown on the plans (courtyard framing |
| 30 Jun 2025 | General Construction | Permit Issued | Conversion of existing commercial office building to residential |
| 18 Jun 2025 | General Construction | Signed-off | General demolition as shown on the plans |
| 10 Jun 2025 | Suspended Scaffold | Permit Issued | Installation of outrigger for facade repair & inspection. AMEND TO ADD OUTRIGGER LOCATIONS AND TIEBACK DETAILS |
| 9 Jun 2025 | Mechanical Systems | Permit Issued | Mechanical work associated with conversion of existing commercial building to residential |
| 30 May 2025 | Sprinklers | Permit Issued | Demolition of sprinkler/standpipe system as shown |
| 29 May 2025 | Structural | Permit Issued | Structural work as shown on the plans |
| 19 May 2025 | General Construction | Permit Issued | Facade filing for exterior window replacement on floors 2-8 |
| 22 Apr 2025 | Structural | Permit Issued | Structural work as shown for partial demolition |
| 13 Feb 2025 | Structural | Permit Issued | Structural work as shown on the plans for courtyard demo |
| 23 Jan 2025 | Structural | Permit Issued | Structural work as shown on the plans |
| 16 Dec 2024 | Protection and Mechanical Methods | Permit Issued | INSTALLATION OF TEMPORARY ROOF PROTECTION OVER ADJACENT PROPERTY AS PER PLANS. ROOF PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 23 Sep 2024 | Protection and Mechanical Methods | Permit Issued | INSTALLATION OF 7,000 LB DUAL PERSONNEL/MATERIAL HOIST CARS @ SOUTH COURTYARD AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 23 Sep 2024 | Protection and Mechanical Methods | Permit Issued | INSTALLATION OF 7,000 LB DUAL PERSONNEL/MATERIAL HOIST CARS @ NORTH COURTYARD AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 16 Sep 2024 | Construction Fence | Permit Issued | INSTALLATION OF 8' HIGH TEMPORARY CONSTRUCTION PLYWOOD FENCE ENCLOSURE AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. FENCE SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022 |
| 9 Sep 2024 | Standpipe | Permit Issued | Conversion to a temporary dry standpipe |
| 14 Nov 2019 | A2 | ISSUED | — |
| 16 Oct 2019 | Sidewalk Shed | Signed-off | INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 10 Oct 2019 | Plumbing | Signed-off | Installation of plumbing piping and fixtures on partial ground floor lobby |
| 24 Sep 2019 | Sprinklers | Signed-off | Removal and installation of sprinklers in first floor lobby as shown on plans filed herewith |
| 19 Sep 2019 | Mechanical Systems | Signed-off | Replacement of HVAC diffusers in building lobby as shown on drawings submitted herewith |
| 27 Dec 2018 | A2 | ISSUED | — |
| 27 Dec 2018 | A2 | ISSUED | — |
| 21 Dec 2018 | A2 | ISSUED | — |
| 21 Dec 2018 | A2 | ISSUED | — |
| 21 Dec 2018 | A2 | ISSUED | — |
| 5 Dec 2018 | A2 | ISSUED | — |
| 13 Nov 2018 | Antenna | Signed-off | AT&T / Replacement of existing telecommunications antennas on facade. Replacement of RRH units in the existing equipment room in basement. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress |
| 10 Oct 2018 | A2 | ISSUED | — |
| 28 Nov 2016 | A2 | ISSUED | — |
| 21 Nov 2016 | A2 | ISSUED | — |
| 27 Oct 2015 | A2 | ISSUED | — |
| 20 Oct 2014 | A2 | ISSUED | — |
| 18 Dec 2012 | A2 | ISSUED | — |
| 18 Dec 2012 | A2 | ISSUED | — |
| 7 Dec 2012 | A2 | ISSUED | — |
| 7 Dec 2012 | A2 | ISSUED | — |
| 7 Dec 2012 | A2 | ISSUED | — |
| 14 Sep 2012 | A3 | ISSUED | — |
| 14 Sep 2012 | A3 | ISSUED | — |
| 30 Aug 2012 | A2 | ISSUED | — |
| 30 Aug 2012 | A2 | ISSUED | — |
| 21 Aug 2012 | A2 | ISSUED | — |
| 31 Jul 2012 | A2 | ISSUED | — |
| 31 Jul 2012 | A2 | ISSUED | — |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Recorded documents
Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.
| Recorded | Type | Amount | From | To |
|---|---|---|---|---|
| 7 Apr 2026 | AALR | — | — | — |
| 7 Apr 2026 | Assignment | — | — | — |
| 7 Apr 2026 | AALR | — | — | — |
| 7 Apr 2026 | AALR | — | — | — |
| 7 Apr 2026 | Assignment | — | — | — |
| 7 Apr 2026 | Assignment | — | — | — |
| 29 May 2025 | Agreement | $75,000,000 | — | — |
| 29 May 2025 | AL&R | $315,000,000 | — | — |
| 29 May 2025 | Mortgage | $150,000,000 | — | — |
| 29 May 2025 | AL&R | $75,000,000 | — | — |
| 29 May 2025 | AL&R | $150,000,000 | — | — |
| 29 May 2025 | Mortgage | $315,000,000 | — | — |
| 15 May 2025 | EASE | — | — | — |
| 15 May 2025 | EASE | — | — | — |
| 15 May 2025 | CONS | — | — | — |
| 15 May 2025 | CONS | — | — | — |
| 28 Mar 2025 | CERT | — | — | — |
| 28 Mar 2025 | ZONE | — | — | — |
| 27 Mar 2025 | EASE | — | — | — |
| 27 Mar 2025 | EASE | — | — | — |
| 19 Feb 2025 | Mortgage | $100,000,000 | — | — |
| 19 Feb 2025 | Deed | $140,000,000 | — | — |
| 19 Feb 2025 | AL&R | $100,000,000 | — | — |
| 19 Feb 2025 | SAGE | — | — | — |
| 19 Feb 2025 | MLEA | — | — | — |
| 19 Feb 2025 | ASSTO | — | — | — |
| 22 Oct 2024 | ASSTO | $45,000,000 | — | — |
| 20 Aug 2024 | Satisfaction of mortgage | — | — | — |
| 31 Jan 2024 | MLEA | — | — | — |
| 26 Aug 2021 | MLEA | $406,565,610 | — | — |
| 13 Aug 2021 | Agreement | $125,000,000 | — | — |
| 18 Sep 2018 | Assignment | — | — | — |
| 18 Sep 2018 | Assignment | — | — | — |
| 16 Jul 2018 | Mortgage | $125,000,000 | — | — |
| 16 Jul 2018 | MLEA | — | — | — |
| 16 Jul 2018 | ASSTO | — | — | — |
| 16 Jul 2018 | ASSTO | — | — | — |
| 16 Jul 2018 | ASSTO | — | — | — |
| 13 Jul 2018 | MLEA | — | — | — |
| 13 Jul 2018 | MLEA | — | — | — |
| 13 Jul 2018 | Agreement | — | — | — |
| 13 Jul 2018 | ASSTO | $228,000,000 | — | — |
| 13 Jul 2018 | Satisfaction of mortgage | — | — | — |
| 15 May 2014 | Agreement | — | — | — |
| 22 Mar 2000 | Deed | — | — | — |
| 24 Feb 1999 | Deed | — | — | — |
| 29 Jul 1998 | TLS | — | — | — |
| 25 Apr 1996 | Agreement | — | — | — |
| 19 Dec 1986 | EASE | — | — | — |
| 1 Aug 1983 | Deed | — | — | — |
Showing the 50 most recent of 56. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 6 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.