1992 Broadway
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 12.74, against a residential limit of 10.00 — it is over that limit by 2.74. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
Unresolved conditions on record
56 violations remain open across 271 residential units (about 0.2 per apartment), against an outstanding penalty balance of $625.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Development & zoning
Floor-area ratio
| Built | 12.74 |
|---|---|
| Residential limit | 10.00 |
| Commercial limit | 10.00 |
| Community-facility limit | 10.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 10.00 |
|---|---|
| Unused ratio | -2.74 |
| Unused buildable area | — |
| Lot area | 55,462 sq ft |
Value & taxes
Assessment
| Assessed total | $166,661,893 |
|---|---|
| Assessed land | $23,032,340 |
| Assessed building | $143,629,553 |
| Market value on record | $0 |
| Assessed as % of market | — |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $0 |
| Tax rate | 12.502% |
| Estimated annual levy | — |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $0 | — |
| 2026 | $0 | — |
| 2025 | $0 | — |
| 2024 | $0 | — |
| 2023 | $0 | — |
Building & occupancy
Structure
| Year built | 1992 |
|---|---|
| Floors | 47 |
| Building area | 706,837 sq ft |
| Residential area | 326,012 sq ft |
| Commercial area | 380,825 sq ft |
Occupancy
| Ownership | Condominium |
|---|---|
| Total units | 279 |
| Residential units | 271 |
| Residential Avg unit size | 1,203 sq ft (calculated) |
| Commercial Avg unit size | 47,603 sq ft (calculated) |
| Building class | RM |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | 66 St-Lincoln Center (1) — 0.1 mi |
|---|---|
| School district | 3 |
| Police precinct | 20 |
| Nearest firehouse | Engine 40/Ladder 35 — 131 Amsterdam Avenue |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Not in an evacuation zone |
| Evictions on record | 1 (most recent 2022) |
Building compliance
| Facade | Repairs required |
|---|
Energy & emissions
| Energy grade | D |
|---|---|
| Energy use intensity | 103.3 kBtu/ft² |
| Greenhouse-gas emissions | 6,966 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 101 West 67 Street, 48-h | 2026-06-24 | $3,550,000 | — | — |
| 1991 Broadway, 15a | 2026-04-21 | $1,465,000 | — | — |
| 101 West 67th Street, 48-c | 2026-04-20 | $3,900,000 | — | — |
| 101 West 67 Street, 48-d | 2026-03-16 | $4,100,000 | — | — |
| 101 West 67 Street, 48-e | 2026-03-16 | $4,100,000 | — | — |
| 1991 Broadway, 18b | 2026-03-09 | $990,000 | — | — |
| 111 West 67 Street, 34-c | 2026-02-03 | $2,100,000 | — | — |
| 1991 Broadway, 15b | 2025-12-17 | $1,395,000 | — | — |
Record activity
Compliance calculated
| Open violations | 56 |
|---|---|
| Open per residential unit | 0.2 (calculated) |
| Enforcement penalties | $625.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $139,625.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 806 |
|---|---|
| Permits / alterations | 260 |
| Recorded documents | 1 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Unavailable Owner |
|---|---|
| Parcel | 1011397503 |
| Block | 1139 |
| Lot | 7503 |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 5 Aug 2026 | Enforcement | CLASS - 2 | ACTIVE | $625 | CLASS 2 ITEMS: FIRE EXTINGUISHER IN MACHINE ROOM IS EXPIRED/NOT PROPERLY MAINTAINED, IN VIOLATION OF NYC FIRE CODE 906 AND NFPA 10 7.3.1.1. ELEVATOR BRAKE DRUM / BRAKE ASSEMBLY CONTAMINATED WITH OIL/GREASE. FRI |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2021 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2021 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2021 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2021 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2021 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 17 Dec 2021 | Building | — | V-Building VIOLATION - ACTIVE | — | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| 17 Dec 2021 | Building | Elevators | Active | — | EVCAT5 |
| 15 Jun 2020 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 6 Sep 2019 | Building | — | V-Building VIOLATION - ACTIVE | — | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| 6 Sep 2019 | Building | — | V-Building VIOLATION - ACTIVE | — | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| 6 Sep 2019 | Building | Elevators | Active | — | ACC1 |
| 6 Sep 2019 | Building | Elevators | Active | — | ACC1 |
| 20 May 2019 | Building | Elevators | Active | — | EVCAT5 |
| 7 May 2019 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 26 Jan 2018 | Building | — | V-Building VIOLATION - ACTIVE | — | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| 26 Jan 2018 | Building | — | V-Building VIOLATION - ACTIVE | — | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| 26 Jan 2018 | Building | — | V-Building VIOLATION - ACTIVE | — | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| 26 Jan 2018 | Building | — | V-Building VIOLATION - ACTIVE | — | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| 26 Jan 2018 | Building | — | V-Building VIOLATION - ACTIVE | — | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| 26 Jan 2018 | Building | Elevators | Active | — | ACC1 |
| 26 Jan 2018 | Building | Elevators | Active | — | ACC1 |
| 26 Jan 2018 | Building | Elevators | Active | — | ACC1 |
| 26 Jan 2018 | Building | Elevators | Active | — | ACC1 |
Showing the 50 most recent of 56. The full set is available in the interactive report.
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 31 Jul 2026 | Blocked Sidewalk | Illegal Parking | Closed | 31 Jul 2026 |
| 31 Jul 2026 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
| 26 Jul 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 26 Jul 2026 |
| 24 Jul 2026 | Elevator - Multiple Devices On Property | Elevator | Closed | 6 Aug 2026 |
| 23 Jul 2026 | Removal Request | Illegal Dumping | Closed | 24 Jul 2026 |
| 18 Jul 2026 | Non-Chronic | Homeless Person Assistance | Closed | 19 Jul 2026 |
| 14 Jul 2026 | Cone | Obstruction | Closed | 18 Jul 2026 |
| 4 Jul 2026 | Lamppost Damaged | Street Light Condition | Open | — |
| 3 Jul 2026 | Damaged/Defective | LinkNYC | Closed | 30 Jul 2026 |
| 2 Jul 2026 | Other Store (Non-Food | Consumer Complaint | Closed | 7 Jul 2026 |
| 27 Jun 2026 | Driver Complaint - Passenger | Taxi Complaint | In Progress | — |
| 26 Jun 2026 | Blocked Hydrant | Illegal Parking | Closed | 26 Jun 2026 |
| 21 Jun 2026 | Paper License Plates | Illegal Parking | Closed | 21 Jun 2026 |
| 11 Jun 2026 | Other (Explain Below | Indoor Air Quality | Closed | 12 Jun 2026 |
| 10 Jun 2026 | Ventilation | Indoor Air Quality | Closed | 12 Jun 2026 |
| 10 Jun 2026 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
| 10 Jun 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 10 Jun 2026 |
| 10 Jun 2026 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
| 10 Jun 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 10 Jun 2026 |
| 10 Jun 2026 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
| 10 Jun 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 10 Jun 2026 |
| 3 Jun 2026 | N/A | Bike/Roller/Skate | Closed | 3 Jun 2026 |
| 1 Jun 2026 | N/A | Bike/Roller/Skate | Closed | 1 Jun 2026 |
| 31 May 2026 | Hydrant Defective (WC2 | Water System | Started | — |
| 27 May 2026 | Trash or Recycling Not Secure | Residential Disposal Complaint | Closed | 28 May 2026 |
| 25 May 2026 | Ticket Seller | Consumer Complaint | Closed | 25 Jun 2026 |
| 22 May 2026 | Ventilation | Indoor Air Quality | Closed | 25 May 2026 |
| 19 May 2026 | Ventilation | Indoor Air Quality | Closed | 20 May 2026 |
| 19 May 2026 | Facility Maintenance | Beach/Pool/Sauna Complaint | Closed | 28 May 2026 |
| 19 May 2026 | Ventilation | Indoor Air Quality | Closed | 20 May 2026 |
| 18 May 2026 | Ventilation | Indoor Air Quality | Closed | 19 May 2026 |
| 16 May 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 16 May 2026 |
| 18 Apr 2026 | Other | Noise - Helicopter | In Progress | — |
| 15 Apr 2026 | Blocked Hydrant | Illegal Parking | Closed | 15 Apr 2026 |
| 15 Apr 2026 | Ventilation | Indoor Air Quality | Closed | 15 Apr 2026 |
| 4 Apr 2026 | Trash or Recycling Not Secure | Residential Disposal Complaint | Closed | 6 Apr 2026 |
| 26 Mar 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 26 Mar 2026 |
| 22 Mar 2026 | Chronic | Homeless Person Assistance | Closed | 22 Mar 2026 |
| 20 Mar 2026 | Chemical Spill/Release (HA1 | Hazardous Materials | Closed | 20 Mar 2026 |
| 20 Mar 2026 | Oil Spill On Street, Large (HQL | Hazardous Materials | Closed | 20 Mar 2026 |
| 11 Mar 2026 | Non-Chronic | Homeless Person Assistance | Closed | 11 Mar 2026 |
| 8 Mar 2026 | Blocked Hydrant | Illegal Parking | Closed | 8 Mar 2026 |
| 5 Mar 2026 | Rodents/Insects/Garbage | Food Establishment | Closed | 30 Apr 2026 |
| 5 Mar 2026 | Blocked Crosswalk | Illegal Parking | Closed | 5 Mar 2026 |
| 1 Mar 2026 | Rodents/Insects/Garbage | Food Establishment | Closed | 30 Apr 2026 |
| 9 Feb 2026 | Inadequate or No Heat | Non-Residential Heat | Closed | 27 Mar 2026 |
| 7 Feb 2026 | Street Light Out | Street Light Condition | Closed | 11 Feb 2026 |
| 30 Jan 2026 | Inadequate or No Heat | Non-Residential Heat | Closed | 27 Mar 2026 |
| 27 Jan 2026 | Inadequate or No Heat | Non-Residential Heat | Closed | 27 Mar 2026 |
| 26 Jan 2026 | Inadequate or No Heat | Non-Residential Heat | Closed | 27 Mar 2026 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 12 May 2026 | Mechanical Systems | Permit Issued | HVAC Unit Replacement on the 7th floor MER. All existing ductwork to remain as is. No change in use egress and occupancy |
| 9 Jan 2026 | Protection and Mechanical Methods | Permit Issued | Installation of a temporary work platform per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 22 Aug 2025 | General Construction | Signed-off | INTERIOR RENOVATION TO COMMERCIAL SPACE, INCLUDING NEW PARTITIONS,MILLWORK, AND FINISHES. NO WORK TO BUILDING EXTERIOR OR TENANT DEMISING WALLS. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 22 Aug 2025 | Mechanical Systems | Signed-off | MECHANICAL MODIFICATIONS TO INCLUDE DUCT REPLACEMENT. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 30 Jul 2025 | General Construction | Signed-off | INTERIOR WORK ONLY ON 44TH FLOOR- APT#44A- kitchen renovation-all work as per plans submitted. No change to use, egress or occupancy |
| 28 Jul 2025 | Plumbing | Signed-off | INTERIOR WORK ONLY ON 44TH FLOOR- APT#44A- kitchen renovation-plumbing work--all work as per plans submitted. No change to use, egress or occupancy |
| 10 Jul 2025 | Sprinklers | Signed-off | Sprinkler Modifications as per plans filed herewith. No change to use, egress, occupancy |
| 26 Jun 2025 | Structural | Signed-off | INTERIOR ALTERATION OF THE RETAIL SPACE LOCATED ON THE FIRST FLOOR AT 174 COLUMBUS AVE AKA 1980 BROADWAY |
| 23 Jun 2025 | General Construction | Signed-off | Interior renovations for GC work and minor modifications to Ducts and piping as per plans filed herewith. No change to use, egress or occupancy |
| 6 Jun 2025 | Construction Fence | Signed-off | Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 1 May 2025 | Protection and Mechanical Methods | Signed-off | Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 1 May 2025 | Supported Scaffold | Signed-off | Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 30 Apr 2025 | Sidewalk Shed | Signed-off | Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 25 Apr 2025 | Suspended Scaffold | Signed-off | Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy |
| 11 Mar 2025 | General Construction | Permit Issued | MISCELLANEOUS FACADE RESTORATION, MAIN ROOF & BULKHEAD ROOF ENCLOSURE RESTORATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 5 Mar 2025 | Plumbing | Signed-off | Interior plumbing work for existing residential Apartment 29E on the 29th Floor. No change to use, egress, or occupancy |
| 3 Mar 2025 | Structural | Signed-off | Herewith filing for Structural modifications as per plans. No change to use, egress or occupancy |
| 25 Feb 2025 | Sprinklers | Permit Issued | HEREWITH FILING FOR SPRINKLER/ STANDPIPE MODIFICATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 11 Feb 2025 | Plumbing | Signed-off | PLUMBING WORK FOR RENOVATION OF APARTMENT 35DEF |
| 4 Feb 2025 | Mechanical Systems | Permit Issued | MECHANICAL MODIFICATIONS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| 28 Jan 2025 | General Construction | Signed-off | CONSTRCUTION WORK FOR THE RENOVATION OF APARTMENT 35DEF |
| 19 Dec 2024 | Plumbing | Signed-off | HEREWITH FILING FOR PLUMBING MODIFICATIONS FOR MEDICAL OFFICES AS PER PLANS . NO CHANGE IN EGRESS, OCCUPANCY OR USE |
| 12 Dec 2024 | General Construction | Permit Issued | HEREWITH FILING FOR INTERIOR RENOVATIONS FOR THE CONVERSION TO A MEDICAL CARE OFFICE (B OCCUPANCY) AS PER PLANS |
| 16 Sep 2024 | Protection and Mechanical Methods | Signed-off | Installation of a temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 22 Aug 2024 | Plumbing | Signed-off | Filing herewith for Plumbing modification related to combination of Apartments 20E & 20F |
| 28 Jun 2024 | Plumbing | Signed-off | Plumbing work to renovate unit 43A on the 43rd floor. No change in use, egress, or occupancy |
| 20 Jun 2024 | General Construction | Signed-off | General construction and plumbing work to renovate unit 43A on the 43rd floor. No change in use, egress, or occupancy |
| 14 Jun 2024 | General Construction | Signed-off | Filing herewith for combination of aparment 20E & 20F |
| 14 May 2024 | Protection and Mechanical Methods | Signed-off | Installation of a temporarily Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 5 Oct 2023 | General Construction | Signed-off | THIS APPLICATION IS FILED TO CLOSE THE OPENING BETWEEN APARTMENTS 43A & 43B. NO CHANGE IN OCCUPANCY, USE OR EGRESS |
| 19 Sep 2023 | General Construction | Signed-off | MINOR RENOVATION OF APT 25B. NO CHANGE IN LAYOUT. REPLACEMENT OF BATHROOM FINISHES AND KITCHEN CABINETS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 14 Sep 2023 | General Construction | Signed-off | Renovations to Apartment 29E. No exterior work. No change to use, egress, or occupancy |
| 17 Aug 2023 | Mechanical Systems | Signed-off | Interior renovation to Unit #48, 38th Floor. Installation of new furred ceiling, and lighting fixtures. Removal of non load bearing wall and pocket door as shown in plan. Replacement of existing units. No change in use, egress, or occupancy |
| 1 Aug 2023 | Protection and Mechanical Methods | Permit Issued | INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY |
| 1 Aug 2023 | Supported Scaffold | Permit Issued | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY |
| 28 Apr 2023 | Sprinklers | Signed-off | Removal and installation of sprinkler heads and associated work on the sub-cellar, cellar and 1st floor as indicated on drawings |
| 21 Apr 2023 | Plumbing | Signed-off | FILING FOR MINOR PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF APT 47B. NO CHANGE IN EGRESS, USE OR OCCUPANCY |
| 13 Apr 2023 | General Construction | Signed-off | Filing for interior renovation of unit 47B including demolition of an existing non-load bearing non-rated interior partitions, installation of new non-load bearing non-rated interior partitions. No change in egress, use or occupancy |
| 4 Apr 2023 | Structural | Signed-off | Structural work associated with the removal of escalators and infill of openings, installation of exterior awning and create openings for elevators and stair on the sub-cellar, cellar and 1st floor as indicated on drawings |
| 3 Apr 2023 | Protection and Mechanical Methods | Signed-off | Filing herewith for use of mechanical means DS1 in conjunction with application #M00800020-I1. No change in use, egress, or occupancy |
| 23 Mar 2023 | Construction Fence | Signed-off | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY |
| 23 Mar 2023 | Sidewalk Shed | Signed-off | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY |
| 1 Mar 2023 | General Construction | Signed-off | Demolition of non load bearing partitions and architectural changes for the installation of new elevators, awning, storefront and related work on the sub cellar, cellar & 1st floor as indicated on drawings |
| 1 Mar 2023 | Mechanical Systems | Signed-off | Mechanical work associated with removal and installation of ductwork and related equipment on the sub-cellar, cellar, 1st, 1st mezz, 2nd, 2nd mezz, 3rd, 4th, 5th, 6th, 7th and 7th floor roof as indicated on drawings |
| 28 Feb 2023 | Plumbing | Signed-off | Plumbing work on the sub-cellar, cellar, 1st floor and 7th floor roof as indicated on drawings |
| 11 Jan 2023 | General Construction | Signed-off | HEREBY FILING FOR THE INTERIOR RENOVATION OF EXISTING APARTMENT 31F. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 11 Jan 2023 | General Construction | Signed-off | Interior renovations to unit PH2A; no change to use, egress or occupancy |
| 10 Aug 2022 | Plumbing | Signed-off | HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF FIXTURES IN APARTMENT 31F. NO CHANGE TO USE OCCUPANCY OR EGRESS |
| 12 Jul 2022 | Plumbing | Signed-off | Interior renovations |
| 12 May 2022 | Plumbing | Permit Issued | Plumbing work as shown on plans, replacement of kitchen cabinetry and appliances, renovation of 2 bathrooms including replacement of plumbing fixtures. Related job number, General Construction M00601767-I1 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Recorded documents
Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.
| Recorded | Type | Amount | From | To |
|---|---|---|---|---|
| 29 Jun 2009 | Agreement | — | — | — |
About this page
Compiled from New York City public records — data retrieved 6 days ago. Coverage on this parcel: 14 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.