1965 Broadway
Analysis
The building offers sizable, modern units but is over‑built for residential use and carries notable compliance issues, making it a moderate‑risk acquisition.
The good
- Built in 1997, so construction standards are relatively modern
- Large average unit size of 2129 sq ft provides spacious apartments
- High total building area of 436,485 sq ft and 205 residential units offer significant rental inventory
- No enforcement penalties and no legal proceedings indicate no recent code enforcement actions
The bad
- Built beyond its residential floor‑area limit (residential FAR 15.76 vs limit 10) – over‑built and cannot be expanded
- 25 open violations and 22 unpaid safety‑violation penalties totaling $52,000 represent ongoing compliance costs
- Market value on record is $0 and there has been no arms‑length sale, limiting price transparency
- Over‑built status and open violations increase financing and operational risk
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 15.76, against a residential limit of 10.00 — it is over that limit by 5.76. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
Unresolved conditions on record
25 violations remain open across 205 residential units (about 0.1 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Development & zoning
Floor-area ratio
| Built | 15.76 |
|---|---|
| Residential limit | 10.00 |
| Commercial limit | 10.00 |
| Community-facility limit | 10.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 10.00 |
|---|---|
| Unused ratio | -5.76 |
| Unused buildable area | — |
| Lot area | 27,704 sq ft |
Value & taxes
Assessment
| Assessed total | $100,089,303 |
|---|---|
| Assessed land | $12,519,580 |
| Assessed building | $87,569,723 |
| Market value on record | $0 |
| Assessed as % of market | — |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $0 |
| Tax rate | 12.502% |
| Estimated annual levy | — |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $0 | — |
| 2026 | $0 | — |
| 2025 | $0 | — |
| 2024 | $0 | — |
| 2023 | $0 | — |
Building & occupancy
Structure
| Year built | 1997 |
|---|---|
| Floors | 32 |
| Building area | 436,485 sq ft |
| Residential area | 302,637 sq ft |
| Commercial area | 133,094 sq ft |
Occupancy
| Ownership | Condominium |
|---|---|
| Total units | 295 |
| Residential units | 205 |
| Residential Avg unit size | 1,476 sq ft (calculated) |
| Commercial Avg unit size | 1,479 sq ft (calculated) |
| Building class | RM |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | 66 St-Lincoln Center (1) — 0.08 mi |
|---|---|
| School district | 3 |
| Police precinct | 20 |
| Nearest firehouse | Engine 40/Ladder 35 — 131 Amsterdam Avenue |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Not in an evacuation zone |
Energy & emissions
| Energy grade | A |
|---|---|
| Energy use intensity | 63.5 kBtu/ft² |
| Greenhouse-gas emissions | 2,942 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 155 West 66th Street, 82527 | 2026-06-26 | $385,000 | — | — |
| 1965 Broadway, 29e | 2026-06-26 | $7,500,000 | — | — |
| 1965 Broadway, 5w | 2026-06-24 | $197,730 | — | — |
| 155 West 66th Street, 1027 | 2026-06-15 | $455,000 | — | — |
| 165 W 66th Street, 3r | 2026-06-09 | $570,000 | — | — |
| 1965 Broadway, 6p | 2026-05-28 | $475,566 | — | — |
| 1965 Broadway, 6g | 2026-05-28 | $253,500 | — | — |
| 1965 Broadway, 4x | 2026-05-27 | $192,000 | — | — |
Record activity
Compliance calculated
| Open violations | 25 |
|---|---|
| Open per residential unit | 0.1 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $52,000.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 385 |
|---|---|
| Permits / alterations | 231 |
| Recorded documents | 0 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Grand Millenium Condominium |
|---|---|
| Parcel | 1011387502 |
| Block | 1138 |
| Lot | 7502 |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Report |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction |
| 2 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2021 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Report |
| 18 Jun 2020 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
| 9 Jul 2009 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 5 Aug 2026 | Blocked Hydrant | Illegal Parking | Closed | 5 Aug 2026 |
| 24 Jul 2026 | Chronic | Homeless Person Assistance | Closed | 25 Jul 2026 |
| 23 Jul 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 23 Jul 2026 |
| 20 Jul 2026 | Lamppost Base Door/Cover Open | Street Light Condition | Closed | 22 Jul 2026 |
| 20 Jul 2026 | Lamppost Wire Exposed | Street Light Condition | Closed | 21 Jul 2026 |
| 10 Jul 2026 | Food Vendor | Vendor Enforcement | Closed | 10 Jul 2026 |
| 6 Jul 2026 | Food Vendor | Vendor Enforcement | Closed | 6 Jul 2026 |
| 26 Jun 2026 | Food Vendor | Vendor Enforcement | Closed | 26 Jun 2026 |
| 26 Jun 2026 | Chronic | Homeless Person Assistance | Closed | 27 Jun 2026 |
| 20 Jun 2026 | Chronic | Homeless Person Assistance | Closed | 20 Jun 2026 |
| 13 Jun 2026 | Blocked Crosswalk | Illegal Parking | Closed | 13 Jun 2026 |
| 31 May 2026 | Chronic | Homeless Person Assistance | Closed | 31 May 2026 |
| 29 May 2026 | Food Vendor | Vendor Enforcement | Closed | 29 May 2026 |
| 21 May 2026 | Damaged/Defective | LinkNYC | Closed | 21 May 2026 |
| 16 May 2026 | Non-Chronic | Homeless Person Assistance | Closed | 17 May 2026 |
| 12 May 2026 | Blocked Crosswalk | Illegal Parking | Closed | 12 May 2026 |
| 8 May 2026 | Food Vendor | Vendor Enforcement | Closed | 8 May 2026 |
| 6 May 2026 | Food Vendor | Vendor Enforcement | Closed | 6 May 2026 |
| 1 May 2026 | Food Vendor | Vendor Enforcement | Closed | 1 May 2026 |
| 29 Apr 2026 | Food Vendor | Vendor Enforcement | Closed | 29 Apr 2026 |
| 24 Apr 2026 | Food Vendor | Vendor Enforcement | Closed | 24 Apr 2026 |
| 17 Apr 2026 | Food Vendor | Vendor Enforcement | Closed | 17 Apr 2026 |
| 16 Apr 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 16 Apr 2026 |
| 15 Apr 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 15 Apr 2026 |
| 10 Apr 2026 | Food Vendor | Vendor Enforcement | Closed | 10 Apr 2026 |
| 3 Apr 2026 | Food Vendor | Vendor Enforcement | Closed | 3 Apr 2026 |
| 3 Apr 2026 | Food Vendor | Vendor Enforcement | Closed | 3 Apr 2026 |
| 1 Apr 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 1 Apr 2026 |
| 28 Mar 2026 | Food Vendor | Vendor Enforcement | Closed | 28 Mar 2026 |
| 26 Mar 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 26 Mar 2026 |
| 13 Mar 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 13 Mar 2026 |
| 6 Mar 2026 | Food Vendor | Vendor Enforcement | Closed | 6 Mar 2026 |
| 27 Feb 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 27 Feb 2026 |
| 27 Feb 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 27 Feb 2026 |
| 26 Feb 2026 | Food Vendor | Vendor Enforcement | Closed | 26 Feb 2026 |
| 26 Feb 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 26 Feb 2026 |
| 25 Feb 2026 | Clothing, Shoe, or Accessories Store | Consumer Complaint | Closed | 28 Mar 2026 |
| 22 Feb 2026 | Damaged/Defective | LinkNYC | Closed | 26 Feb 2026 |
| 20 Feb 2026 | Food Vendor | Vendor Enforcement | Closed | 20 Feb 2026 |
| 20 Feb 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 20 Feb 2026 |
| 19 Feb 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 19 Feb 2026 |
| 18 Feb 2026 | Food Vendor | Vendor Enforcement | Closed | 18 Feb 2026 |
| 17 Feb 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 17 Feb 2026 |
| 16 Feb 2026 | Food Vendor | Vendor Enforcement | Closed | 16 Feb 2026 |
| 13 Feb 2026 | Food Vendor | Vendor Enforcement | Closed | 13 Feb 2026 |
| 12 Feb 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 12 Feb 2026 |
| 11 Feb 2026 | Food Vendor | Vendor Enforcement | Closed | 11 Feb 2026 |
| 10 Feb 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 10 Feb 2026 |
| 8 Feb 2026 | Food Vendor | Vendor Enforcement | Closed | 8 Feb 2026 |
| 7 Feb 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 7 Feb 2026 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 17 Apr 2026 | Mechanical Systems | Permit Issued | INTERIOR MODIFICATION OF UNIT 25A INCLUDING THE MODIFICATION OF THE KITCHEN, BATHROOMS, AND FINISHES THROUGHOUT. NO CHANGE IN USE OCCUPANCY OR EGRESS IS PROPOSED IN THIS APPLICATION |
| 18 Mar 2026 | Plumbing | Permit Issued | INTERIOR MODIFICATION OF UNIT 25A INCLUDING THE MODIFICATION OF THE KITCHEN, BATHROOMS, AND FINISHES THROUGHOUT. NO CHANGE IN USE OCCUPANCY OR EGRESS IS PROPOSED IN THIS APPLICATION |
| 13 Mar 2026 | General Construction | Permit Issued | INTERIOR MODIFICATION OF UNIT 25A INCLUDING THE MODIFICATION OF THE KITCHEN, BATHROOMS, AND FINISHES THROUGHOUT. NO CHANGE IN USE OCCUPANCY OR EGRESS IS PROPOSED IN THIS APPLICATION |
| 26 Feb 2026 | General Construction | Permit Issued | FILING GC FOR NEW PARTITION AND REPLACEMENT OF APPLIANCES AND FIXTURES. SCOPE OF WORK IS LIMITED TO UNIT 25D AND THERE IS NO CHANGE IN EGRESS, USE, OR OCCUPANCY |
| 21 May 2025 | Plumbing | Signed-off | PLUMBING WORK IN APARTMENT 20EF IN CONJUNCTION WITH APARTMENT RENOVATION FILED IN Building NOW UNDER #M01195314. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 25 Apr 2025 | General Construction | Permit Issued | FILING TO COMBINE APARTMENTS 20E & 20F UNDER TPPN 3/97 AND TO RENOVATE; PARTITIONS, FLOORING, CABINETRY, COUNTER, DOORS, CEILING, FIXTURES & FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 14 Mar 2025 | General Construction | Signed-off | Annexing terrace above unit PH 3A as a private passive recreational space and installing pavers, decking, planters, lighting and irrigation on the terrace as per plans |
| 24 Dec 2024 | Mechanical Systems | Permit Issued | Install air conditioning units in apt 28A and associated piping/duct work. PL and GC filed separately. no change in occupancy use or egress |
| 24 Dec 2024 | General Construction | Signed-off | Install new exterior convenience stair from roof terrace to the roof at Apt#PH3A. Create new opening in parapet at roof for stair access. Install handrail over existing parapet .No change in use, occupancy or egress |
| 15 Nov 2024 | Structural | Signed-off | Filing for the structural drawings for the new exterior stair stairway connecting the 32nd floor roof terrace framing level to the roof framing level |
| 5 Jul 2024 | Supported Scaffold | Signed-off | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 5 Jul 2024 | Protection and Mechanical Methods | Signed-off | Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 24 Jun 2024 | Mechanical Systems | Signed-off | DIRECT REPLACEMENT OF WATER SOURCE HEAT PUMP ON THE 1st FLOOR |
| 15 May 2024 | Mechanical Systems | Signed-off | MH SYSTEMS FILED IN CONJUNCTION WITH Building NOW PL AND GC. NO CHANGE TO USE , OCCUPANCY OR EGRESS |
| 15 May 2024 | General Construction | Signed-off | COMBINATION OF APTS FILED UNDER TPPN 3/97 FILED IN CONJUNCTION WITH Building NOW PL AND MH. NO CHANGE TO USE OCCUPANCY OR EGRESS |
| 28 Feb 2024 | Mechanical Systems | Signed-off | MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED DUCT WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 6 Feb 2024 | General Construction | Permit Issued | Propose interior renovation in exiting apt#21H, with minor partition and finish work as per plan. No change in use, egress and occupancy |
| 5 Dec 2023 | General Construction | Signed-off | Renovation of existing apartment 28A. Remove/install non load bearing partitions and finishes. PL and MS filed separately. No change in occupancy, use or egress |
| 27 Oct 2023 | Plumbing | Signed-off | MODIFICATIONS TO EXISTING PLUMBING SYSTEMS TO INCLUDE FIXTURE INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 23 Oct 2023 | General Construction | Signed-off | INTERIOR ALTERATIONS OF RESIDENTIAL UNIT TO INCLUDE MINOR DEMOLITION, PARTITION AND CARPENTRY WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 19 Oct 2023 | Plumbing | Signed-off | Plumbing work filed in conjunction with general construction application. Remove/install plumbing fixtures through. MS and GC filed seperately. No change in occupancy, use or egress |
| 31 Aug 2023 | General Construction | Signed-off | FILING HEREWITH INTERIOR RENOVATION INCLUDES DOORS, PARTITIONS FIXTURES AAND FINISHES ON THE 14TH FLOOR APT 14B AS INDICATED ON THE DRAWINGS. NO CHANGE USE EGRESS OR OCCUPANCY |
| 7 Jul 2023 | Mechanical Systems | Permit Issued | PROPOSED COMBINATION OF TWO ADJACENT DWELLING UNITS INCLUDING THE REMOVAL OF ONE KITCHEN, THE MODIFICATION OF THE REMAINING KITCHEN,THE RENOVATION OF TWO BATHROOMS, AND MISC. PARTITION, AND FINISH MODIFICATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 5 Jul 2023 | Plumbing | Permit Issued | PROPOSED COMBINATION OF TWO ADJACENT DWELLING UNITS INCLUDING THE REMOVAL OF ONE KITCHEN, THE MODIFICATION OF THE REMAINING KITCHEN,THE RENOVATION OF TWO BATHROOMS, AND MISC. PARTITION, AND FINISH MODIFICATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 30 Jun 2023 | General Construction | Permit Issued | PROPOSED COMBINATION OF TWO ADJACENT DWELLING UNITS INCLUDING THE REMOVAL OF ONE KITCHEN, THE MODIFICATION OF THE REMAINING KITCHEN,THE RENOVATION OF TWO BATHROOMS, AND MISC. PARTITION, AND FINISH MODIFICATIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 4 May 2023 | Supported Scaffold | Signed-off | PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION |
| 17 Apr 2023 | General Construction | Signed-off | Remove/Replace cracked masonry, masonry repointing, window glass replacement, coping stone replacement, spandrel beam restoration, cast stone spall repair, stone crack repair |
| 30 Mar 2023 | Plumbing | Signed-off | PLUMBING F IXTURES IN THE COMBINATION OF APTS FILED IN CONJUNCTION WITH Building NOW GC AND MH. NO CHANGE TO USE OCCUPANCY OR EGRESS |
| 27 Feb 2023 | Sidewalk Shed | Signed-off | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF |
| 13 Dec 2022 | Plumbing | Permit Issued | PROPOSED COMBINATION OF UNITS 20D/21D WITH UNIT 21C. SCOPE TO INCLUDE THE REMOVAL OF ONE KITCHEN, THE MODIFICATION OF SELECTED PARTITIONS, AND THE MODIFICATION OF MISCELLANEOUS FINISHES. NO CHANGE IN USE, OCCUPANCY, OR EGRESS PROPOSED IN THIS APPLICATION |
| 21 Oct 2022 | General Construction | Permit Issued | PROPOSED COMBINATION OF UNITS 20D/21D WITH UNIT 21C. SCOPE TO INCLUDE THE REMOVAL OF ONE KITCHEN, THE MODIFICATION OF SELECTED PARTITIONS, AND THE MODIFICATION OF MISCELLANEOUS FINISHES. NO CHANGE IN USE, OCCUPANCY, OR EGRESS PROPOSED IN THIS APPLICATION |
| 1 Mar 2022 | General Construction | Signed-off | INTERIOR RENOVATION IN APT 22D FILED IN CONJUNCTION WITH Building NOW PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 29 Oct 2021 | Plumbing | Signed-off | PLUMBING WORK FILED IN CONJUNCTION WITH THE RENOVATION OF AN EXISTING DWELLING UNIT AS PER PLANS. NO CHANGE OF USE, OCCUPANCY OR EGRESS |
| 8 Oct 2021 | General Construction | Signed-off | Renovation of an existing dwelling unit as per plans. Plumbing work filed under a separate application. No change of use, occupancy or egress |
| 26 Mar 2021 | Plumbing | Signed-off | REPLACEMENT AND RELOCATION OF PLUMBING FIXTURES AT EXISTING BATHROOMS AND KITCHEN. NO CHANGE IN USE, EGRESS OR OCCUPANCY INVOLVED UNDER THIS APPLICATION |
| 17 Dec 2020 | Sidewalk Shed | Signed-off | INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 12 Dec 2020 | A3 | ISSUED | — |
| 13 Aug 2020 | Mechanical Systems | Permit Issued | Proposed HVAC installation at PH1B at 1965 Broadway, NY, NY |
| 9 Dec 2019 | A2 | ISSUED | — |
| 14 Nov 2019 | A2 | ISSUED | — |
| 12 Nov 2019 | Plumbing | Permit Issued | PROPOSED NON-STRUCTURAL INTERIOR MODIFICATION INCLUDING THE MODIFICATION OF THE KITCHEN AND ALL BATHROOMS, THE MODIFICATION OF PARTITIONS AND FINISHES THROUGHOUT. NO CHANGE IN USE, EGRESS OF OCCUPANCY PROPOSED THIS APPLICATION |
| 17 Oct 2019 | Plumbing | Signed-off | Creation of New Full Bathroom as per plans filed herewith. No change to use, egress or occupancy |
| 17 Oct 2019 | Plumbing | Signed-off | Plumbing RENOVATION OF EXISTING APARTMENTS #PH3A ON THE 33TH FLOOR |
| 15 Oct 2019 | A2 | ISSUED | — |
| 30 Aug 2019 | A2 | ISSUED | — |
| 13 Nov 2018 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 24 Oct 2018 | A2 | ISSUED | — |
| 11 Sep 2018 | A2 | ISSUED | — |
| 28 Nov 2017 | A2 | ISSUED | — |
| 25 Sep 2017 | A2 | ISSUED | — |
Showing the 50 most recent of 150. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 6 days ago. Coverage on this parcel: 14 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.