115 Central Park West
Analysis
The building offers solid equity and no major legal or tax encumbrances, but its over‑built, landmarked condition and existing safety violations constrain future development and add compliance risk.
The good
- Assessed value of $84,948,750 and market value on record of $188,775,000 indicate strong equity potential
- No enforcement penalties and no legal proceedings reduce immediate financial risk
- No tax lien and no arms‑length sale suggest the property is not encumbered by hidden debt
- Average unit size of 2,595 sq ft provides premium rental or resale appeal
The bad
- Built beyond its residential floor‑area limit (over‑built) restricts any future residential expansion
- Three open violations and two unpaid safety‑violation penalties totaling $6,000 represent compliance costs
- Landmarked status limits alterations and may increase renovation expenses
- Over‑built status means the building cannot be enlarged despite unused buildable square footage being zero
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 14.65, against a residential limit of 10.00 — it is over that limit by 4.65. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
A light open-violation load
Only 3 violations are currently open across 238 residential units, with $0.00 outstanding. For a building of this age that is a modest figure.
Assessed value trend
Assessed value has risen 1.6% across the 5 assessment years on record (2023 to 2027), standing at $84,948,750. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.
Development & zoning
Floor-area ratio
| Built | 14.65 |
|---|---|
| Residential limit | 10.00 |
| Commercial limit | 0.00 |
| Community-facility limit | 10.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 10.00 |
|---|---|
| Unused ratio | -4.65 |
| Unused buildable area | — |
| Lot area | 42,143 sq ft |
Landmarked — Individual Landmark + Historic District
| Name | The Majestic |
|---|---|
| Historic district | Upper West Side / Central Park West Historic District |
| Designated | — |
Landmark status restricts exterior alterations and may require city approval for any work — a real constraint on both cost and timeline.
Value & taxes
Assessment
| Assessed total | $84,948,750 |
|---|---|
| Assessed land | $18,016,200 |
| Assessed building | $66,932,550 |
| Market value on record | $188,775,000 |
| Assessed as % of market | 45.0% |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $82,592,190 |
| Tax rate | 12.502% |
| Estimated annual levy | $10,325,675.59 |
| Tax exemption (assessed value) | $72,000 |
| Tax abatement | Co-op/condo — $1,372,035 |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $84,948,750 | — |
| 2026 | $83,094,750 | +2.2% |
| 2025 | $80,905,050 | +2.7% |
| 2024 | $80,434,800 | +0.6% |
| 2023 | $83,577,600 | -3.8% |
Building & occupancy
Structure
| Year built | 1931 |
|---|---|
| Floors | 31 |
| Building area | 617,569 sq ft |
| Residential area | 599,042 sq ft |
| Commercial area | 18,527 sq ft |
Occupancy
| Ownership | Cooperative |
|---|---|
| Total units | 253 |
| Residential units | 238 |
| Storefronts | 18 |
| Residential Avg unit size | 2,517 sq ft (calculated) |
| Commercial Avg unit size | 1,235 sq ft (calculated) |
| Building class | D4 |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | 72 St (C, B) — 0.04 mi |
|---|---|
| School district | 3 |
| Police precinct | 20 |
| Nearest firehouse | Engine 40/Ladder 35 — 131 Amsterdam Avenue |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Not in an evacuation zone |
Building compliance
| Facade | Repairs required |
|---|
Energy & emissions
| Energy grade | D |
|---|---|
| Energy use intensity | 62.8 kBtu/ft² |
| Greenhouse-gas emissions | 3,144 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 40 West 72 Street, 31b | 2026-06-08 | $350,000 | — | — |
| 40 West 72nd Street, 48 | 2026-05-29 | $359,970 | — | — |
| 40 West 72 Street, 81b | 2026-04-24 | $765,000 | — | — |
| 20 West 72nd Street, 1403 | 2026-04-02 | $350,000 | — | — |
| 40 West 72nd Street, 151c | 2026-03-12 | $845,000 | — | — |
| 40 West 72 Street, 91a | 2026-02-12 | $350,000 | — | — |
| 40 West 72 Street, 58 | 2026-02-09 | $400,000 | — | — |
| 59 West 71st Street, 4d | 2026-02-06 | $1,435,000 | — | — |
Record activity
Compliance calculated
| Open violations | 3 |
|---|---|
| Open per residential unit | 0.0 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $6,000.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 288 |
|---|---|
| Permits / alterations | 260 |
| Recorded documents | 250 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | 115 Central Park West Corp. |
|---|---|
| Parcel | 1011240027 |
| Block | 1124 |
| Lot | 27 |
| Mortgage on record | $3,100,000 (2020) — New York Community Bank |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 10 Apr 2026 | Enforcement | CLASS - 2 | ACTIVE | — | UPON INSPECTION OF A 33 STORY FACADE ALT SITE SAFETY MANAGER RELEASE APPOINTMENT I OBSERVED NO SIDEWALK SHED INSTALLED AT EXPOSURE 1&4 AS PER APPROVED SITE SAFETY PLAN. CONTRACTOR FAILED NOTIFY AND SCHEDULE INS |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 17 Jul 2026 | Driver Report - Passenger | Taxi Report | In Progress | — |
| 26 Jun 2026 | Lead Kit Request (Residential) (L10 | Lead | Closed | 29 Jun 2026 |
| 26 May 2026 | Book/Stationery | Lost Property | Closed | 28 May 2026 |
| 19 May 2026 | Electronics/Phones | Lost Property | Closed | 22 May 2026 |
| 12 May 2026 | Driver Complaint - Passenger | Taxi Complaint | In Progress | — |
| 21 Apr 2026 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 23 Apr 2026 |
| 16 Apr 2026 | Hydrant Leaking (WC1 | Water System | Closed | 16 Apr 2026 |
| 27 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 27 Mar 2026 |
| 15 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 15 Mar 2026 |
| 27 Feb 2026 | Non-Chronic | Homeless Person Assistance | Closed | 27 Feb 2026 |
| 27 Feb 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 2 Mar 2026 |
| 14 Feb 2026 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 17 Feb 2026 |
| 4 Feb 2026 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 6 Feb 2026 |
| 11 Jan 2026 | Blocked Hydrant | Illegal Parking | Closed | 11 Jan 2026 |
| 21 Dec 2025 | Clothing/Glasses | Lost Property | Closed | 26 Dec 2025 |
| 8 Dec 2025 | Non-Chronic | Homeless Person Assistance | Closed | 8 Dec 2025 |
| 11 Nov 2025 | Noise: Construction Equipment (NC1 | Noise | Closed | 17 Nov 2025 |
| 22 Oct 2025 | Driver Complaint - Passenger | Taxi Complaint | In Progress | — |
| 7 Oct 2025 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
| 14 Aug 2025 | Parking Permit Improper Use | Illegal Parking | Closed | 14 Aug 2025 |
| 7 Aug 2025 | Neglected | Animal-Abuse | Closed | 7 Aug 2025 |
| 25 Jul 2025 | Rat Sighting | Rodent | Closed | 25 Jul 2025 |
| 18 Jul 2025 | Removal Request | Illegal Dumping | Closed | 21 Jul 2025 |
| 17 Jul 2025 | Removal Request | Illegal Dumping | Closed | 18 Jul 2025 |
| 9 Jul 2025 | N/A | Encampment | Closed | 9 Jul 2025 |
| 9 Jul 2025 | N/A | Encampment | Closed | 23 Jul 2025 |
| 7 Jul 2025 | N/A | Encampment | Closed | 7 Jul 2025 |
| 6 Jul 2025 | Defacement | Curb Condition | Closed | 16 Dec 2025 |
| 15 Jun 2025 | Lead Kit Request (Residential) (L10 | Lead | Open | — |
| 13 Jun 2025 | Equipment Complaint | For Hire Vehicle Complaint | Closed | 16 Dec 2025 |
| 7 Jun 2025 | Blocked Hydrant | Illegal Parking | Closed | 7 Jun 2025 |
| 24 May 2025 | Blocked Hydrant | Illegal Parking | Closed | 24 May 2025 |
| 9 May 2025 | Driver Complaint - Passenger | Taxi Complaint | Closed | 30 Dec 2025 |
| 7 May 2025 | Chronic | Homeless Person Assistance | Closed | 7 May 2025 |
| 4 May 2025 | Blocked Bike Lane | Illegal Parking | Closed | 4 May 2025 |
| 3 May 2025 | Unauthorized Bus Layover | Illegal Parking | Closed | 3 May 2025 |
| 25 Apr 2025 | Manhole Cover Missing (Emergency) (SA3 | Sewer | Closed | 30 Apr 2025 |
| 24 Apr 2025 | Blocked Bike Lane | Illegal Parking | Closed | 24 Apr 2025 |
| 23 Apr 2025 | Defective Hardware | Street Condition | Closed | 24 Apr 2025 |
| 15 Apr 2025 | Failure To Retain Water/Improper Drainage- (a local law/89 | Plumbing | Closed | 16 Jul 2025 |
| 15 Apr 2025 | Catch Basin Clogged/Flooding (Use Comments) (SC | Sewer | Closed | 23 Apr 2025 |
| 15 Apr 2025 | Defective Hardware | Street Condition | Closed | 15 Apr 2025 |
| 8 Feb 2025 | Use Indoor | Drug Activity | Closed | 8 Feb 2025 |
| 4 Feb 2025 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 6 Feb 2025 |
| 1 Feb 2025 | Hydrant Leaking (WC1 | Water System | Closed | 1 Feb 2025 |
| 29 Dec 2024 | Removal Request | Illegal Dumping | Closed | 13 Jan 2025 |
| 28 Dec 2024 | Other (complaint details | Non-Emergency Police Matter | Closed | 28 Dec 2024 |
| 26 Nov 2024 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 3 Dec 2024 |
| 14 Nov 2024 | — | Homeless Person Assistance | Closed | — |
| 14 Nov 2024 | Pothole | Street Condition | Closed | 15 Nov 2024 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 28 Jul 2025 | Plumbing | Signed-off | MODIFICATION AND INSTALLATION OF PLUMBING FIXTURES |
| 22 Jul 2025 | Mechanical Systems | Permit Issued | PROVIDE NEW MECHANICAL SYSTEM. FOR UNIT 16H |
| 11 Jul 2025 | Mechanical Systems | Signed-off | Create openings in exterior wall for installation of sleeve for AC & PTAC units. No change in use, occupancy or egress under this application |
| 7 Jul 2025 | General Construction | Permit Issued | INTERIOR RENOVATION IN APT 16H FILED IN CONJUNCTION WITH Building NOW PL AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 28 Jan 2025 | General Construction | Signed-off | ADDIITION OF EXTERIOR SCONCES ON ALL (4) TERRACES. REPLACEMENT OF EXISTING MANUAL AWNINGS WITH NEW MOTORIZED AWNINGS ON THE EAST AND SOUTHEAST TERRACES. ADDITION OF (1) NEW MOTORIZED AWNING ON THE NORTHEAST TERRACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 26 Nov 2024 | Mechanical Systems | Signed-off | MECHANICAL WORK FILED HEREWITH IN CONJUNCTION WITH ALTERATION OF EXISTING APARTMENT UNIT 12J; INSTALL NEW MECHANICAL TOILET EXHAUST CONNECTED TO EXIST. SHAFT |
| 19 Nov 2024 | Mechanical Systems | Signed-off | MECHANICAL WITH THE RENOVATION OF APARTMENT #15H ON THE 15TH FLOOR. AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, OR OCCUPANCY |
| 25 Oct 2024 | Plumbing | Signed-off | PLUMBING WITH THE RENOVATION OF APARTMENT #15H ON THE 15TH FLOOR. PAA FILED TO REDUCE GAS SCOPE OF WORK. AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, OR OCCUPANCY |
| 5 Sep 2024 | Plumbing | Signed-off | PL FIXTURES FILED IN CONJUNCTION WITH Building NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 23 Jul 2024 | General Construction | Signed-off | REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, CEILINGS, FLORRING AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 23 Jul 2024 | Mechanical Systems | Signed-off | MODIFICATION OF HVAC AND INSTALLATION OF AC UNITS |
| 7 May 2024 | Plumbing | Signed-off | Plumbing work filed for Alteration of primary bathroom and powder room |
| 22 Apr 2024 | General Construction | Signed-off | INTERIOR GENERAL CONSTRUCTION RENOVATION OF APARTMENT #15H ON THE 15TH FLOOR. AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, OR OCCUPANCY |
| 8 Apr 2024 | General Construction | Signed-off | Alteration of primary bathroom and powder room. Interior renovation of fixtures and finishes, remove/replace non-bearing partitions. No changes to use, egress and occupancy |
| 21 Mar 2024 | Mechanical Systems | Signed-off | INSTALLATION OF NEW THROUGH WALL PTAC UNITS TO REPLACE EXISTING IN KIND, ADD HUMIFICATION SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 23 Feb 2024 | Plumbing | Signed-off | Plumbing work as shown on plans for Unit 11D |
| 20 Feb 2024 | Mechanical Systems | Signed-off | Create opening in exterior wall for installation of sleeve for PTAC unit. No change in use, occupancy or egress under this application |
| 23 Jan 2024 | Plumbing | Signed-off | REPLACE & RELOCATE PLUMBING FIXTURES & RADIATORS IN APT 6CW AS PER PLANS.. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 8 Jan 2024 | General Construction | Signed-off | PARTITION WORK TO CLOSE SOLARIUM ACCESS DOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 18 Dec 2023 | Plumbing | Signed-off | APPLICATION FILED TO RENOVATE APARTMENT 12J ON 12TH FLOOR - Plumbing work, no change in use egress or occupancy |
| 13 Dec 2023 | General Construction | Signed-off | APPLICATION FILED TO RENOVATE APARTMENT 12J ON 12TH FLOOR;INTERIOR RENOVATIONS TO INCLUDE REMOVING/REPLACING NON-BEARING PARTITIONS AND FINISHES AS PER PLANS,RECONFIGURE EXISTING KITCHEN AND EXISTING BATHROOMS LAYOUT. no change in use egress or occupancy |
| 30 Nov 2023 | General Construction | Signed-off | New masonry opening for AC equipment in apartment #16JK, as per plans filed herewith. No change in use, egress, or occupancy |
| 21 Nov 2023 | General Construction | Signed-off | Exterior work file in conjunction with apartment#24CD renovation for three (3) new openings for new louvers and modified window opening |
| 2 Aug 2023 | Plumbing | Signed-off | Modification of existing plumbing system in apartment #16J for combination with Apt. #16K, as per plans filed herewith. No change in use, egress, or occupancy |
| 18 Jul 2023 | General Construction | Signed-off | INTERIOR DEMO & INSTALLATION OF PARTITIONS INCLUDING MILLWORK, FLOORING IN APT 6C AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 21 Jun 2023 | Mechanical Systems | Signed-off | Modification of mechanical system in existing apartments #16J and #16K. Work to include installation of new split condensing unit in new openings, as per plans filed herewith. No change in use, egress, or occupancy |
| 19 Jun 2023 | General Construction | Signed-off | INTERIOR RENOVATIONS TO EXISTING COOP APARTMENT #16J FOR COMBINATION WITH COOP APARTMENT #16K. WORK TO INCLUDE NON-STRUCTURAL DEMOLITION, GENERAL CONSTRUCTION, AND RELATED FINISHES. APARTMENTS COMBINED IN COMPLIANCE WITH TPPN #3/97 |
| 12 Jun 2023 | Mechanical Systems | Signed-off | HVAC WORK ASSOCIATED WITH INTERIOR APARTMENT RENOVATION |
| 11 May 2023 | Mechanical Systems | Signed-off | Subsequent Mechanical scope of work for Apartment 11B |
| 5 May 2023 | Plumbing | Signed-off | Subsequent Plumbing work for apartment 11B |
| 4 May 2023 | General Construction | Signed-off | Renovate residential apartment 11B as per plans filed herewith. No change to use, egress, or occupancy under this application |
| 27 Apr 2023 | General Construction | Signed-off | FACADE RESTORATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 23 Mar 2023 | General Construction | Signed-off | To Replace existing sleeves and exterior louvers of the existing thru wall air conditioning units at Apt 27F |
| 20 Mar 2023 | Sidewalk Shed | Signed-off | FILING FOR INSTALLATION OF SIDEWALK SHED ON BEHALF OF CONTRACTOR |
| 28 Feb 2023 | Plumbing | Signed-off | GENERAL PLUMBING MODIFICATIONS IN SUPPORT OF APARTMENT RENOVATION. NO CHANGE IN OCCUPANCY USE OR EGRESS |
| 27 Feb 2023 | General Construction | Signed-off | APARTMENT RENOVATION , MINOR NON LOAD BEARING PARTITION REMOVAL, NEWINTERIOR GWB NON LOAD BEARING PARTITIONS AND DOORS, NEW CABINETRY AND FINISHES,ALL AS PER PLANS SUPPLIED. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 27 Feb 2023 | Mechanical Systems | Signed-off | INSTALLATION OF THREE (3) SPLIT HVAC SYSTEMS AND ASSOCIATED DUCTWORK WITHIN APT 15-D |
| 24 Feb 2023 | Mechanical Systems | Signed-off | GENERAL MECHANICAL/HVAC MODIFICATIONS PER PLANS, NO CHANGE IN OCCUPANCY USE OR EGRESS |
| 14 Feb 2023 | General Construction | Signed-off | GENERAL CONSTRUCTION AND FINISHES WITHIN APT 15D. NEW THRU WALL SLEEVES FOR HVAC CONDENSER UNITS. NO CHANGE IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 28 Dec 2022 | General Construction | Signed-off | Interior renovation of 1st floor |
| 28 Dec 2022 | Mechanical Systems | Signed-off | Mechanical work on 1st floor related to HVAC installation as shown on plans |
| 23 Dec 2022 | Plumbing | Signed-off | Filing for the plumbing work in conjunction with the proposed apartment renovation |
| 23 Dec 2022 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF OUTRIGGER BEAM TO SUPPORT SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 6 Dec 2022 | General Construction | Signed-off | Apartment Combination proposed as per plans filed herewith |
| 25 Nov 2022 | Mechanical Systems | Signed-off | Scope of work includes modification to existing mechanical systems as indicated on plans. No change in use, occupancy or egress |
| 21 Nov 2022 | Plumbing | Signed-off | PLUMBING AND GAS WORK ASSOCIATED WITH INTERIOR RENOVATION |
| 18 Nov 2022 | General Construction | Signed-off | General construction work associated with the renovation of an existing 14th floor apartment |
| 3 Nov 2022 | Plumbing | Signed-off | Filing for plumbing work only associated with Building job # M00562890-I1 (interior apartment renovation). As per plans filed herewith. No change of use, egress, or occupancy |
| 31 Oct 2022 | Mechanical Systems | Signed-off | The scope of this project includes work associated with the installation of a new ducted HVAC system including a new split air conditioning system, and venting as required for kitchens & bathrooms |
| 12 Sep 2022 | Plumbing | Signed-off | Modifications to existing plumbing system in apartment #15FW, as per plans filed herewith. No change in use, egress or occupancy |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Recorded documents
Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.
| Recorded | Type | Amount | From | To |
|---|---|---|---|---|
| 9 Jul 2026 | RPTT&RET | $7,250,000 | — | — |
| 9 Jun 2026 | RPTT&RET | $8,350,000 | — | — |
| 6 May 2026 | RPTT&RET | $2,700,000 | — | — |
| 10 Apr 2026 | RPTT&RET | $4,872,000 | — | — |
| 18 Mar 2026 | RPTT&RET | $13,000,000 | — | — |
| 30 Jan 2026 | RPTT&RET | — | — | — |
| 22 Jan 2026 | RPTT&RET | $1,100,000 | — | — |
| 9 Dec 2025 | RPTT&RET | $3,150,000 | — | — |
| 12 Nov 2025 | RPTT&RET | — | — | — |
| 4 Sep 2025 | RPTT&RET | $4,425,000 | — | — |
| 25 Jul 2025 | RPTT&RET | $285,000 | — | — |
| 23 Jul 2025 | RPTT&RET | — | — | — |
| 26 Jun 2025 | RPTT&RET | $5,200,000 | — | — |
| 9 Jun 2025 | RPTT&RET | $7,100,000 | — | — |
| 25 Apr 2025 | RPTT&RET | $3,750,000 | — | — |
| 14 Mar 2025 | RPTT&RET | $4,875,000 | — | — |
| 5 Mar 2025 | RPTT&RET | — | — | — |
| 14 Nov 2024 | RPTT&RET | — | — | — |
| 22 Oct 2024 | RPTT&RET | — | — | — |
| 6 Sep 2024 | RPTT&RET | $3,800,000 | — | — |
| 19 Aug 2024 | RPTT&RET | $4,500,000 | — | — |
| 10 Jun 2024 | RPTT&RET | — | — | — |
| 14 May 2024 | RPTT&RET | — | — | — |
| 1 May 2024 | RPTT&RET | — | — | — |
| 24 Apr 2024 | RPTT&RET | — | — | — |
| 15 Apr 2024 | RPTT&RET | $275,000 | — | — |
| 13 Mar 2024 | RPTT&RET | $9,250,000 | — | — |
| 12 Mar 2024 | RPTT&RET | $14,500,000 | — | — |
| 30 Jan 2024 | RPTT&RET | $3,145,000 | — | — |
| 9 Jan 2024 | RPTT&RET | $3,075,000 | — | — |
| 16 Nov 2023 | RPTT&RET | $20,500,000 | — | — |
| 12 Oct 2023 | RPTT&RET | — | — | — |
| 26 Sep 2023 | RPTT&RET | $4,700,000 | — | — |
| 18 Sep 2023 | RPTT&RET | $6,400,000 | — | — |
| 28 Aug 2023 | RPTT&RET | $6,000,000 | — | — |
| 3 Jul 2023 | RPTT&RET | — | — | — |
| 21 Apr 2023 | RPTT&RET | $5,250,000 | — | — |
| 12 Apr 2023 | RPTT&RET | — | — | — |
| 27 Mar 2023 | RPTT&RET | $2,100,000 | — | — |
| 2 Mar 2023 | RPTT&RET | $200,000 | — | — |
| 20 Jan 2023 | RPTT&RET | — | — | — |
| 12 Jan 2023 | RPTT&RET | — | — | — |
| 27 Dec 2022 | RPTT&RET | $3,300,000 | — | — |
| 23 Dec 2022 | RPTT&RET | — | — | — |
| 3 Nov 2022 | RPTT&RET | $3,333,000 | — | — |
| 14 Oct 2022 | RPTT&RET | $5,540,000 | — | — |
| 7 Oct 2022 | RPTT&RET | — | — | — |
| 21 Sep 2022 | RPTT&RET | — | — | — |
| 1 Sep 2022 | RPTT&RET | $237,500 | — | — |
| 31 Aug 2022 | RPTT&RET | $3,100,000 | — | — |
Showing the 50 most recent of 150. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 5 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.