15 Central Park West
Analysis
The building’s modern age and large, spacious unit stock are positives, but the over‑built status and significant safety‑violation penalties create material risk that must be addressed before purchase.
The good
- Built in 2005, so relatively modern construction
- Large portfolio of 229 residential units provides scale
- Average unit size of 3,038 sq ft is sizable for the market
- No enforcement fines, no legal proceedings, and not on a tax‑lien list
The bad
- Built beyond the residential floor‑area limit (FAR 12.02 vs limit 10) and flagged as over‑built for residential use
- Safety‑violation debts of $154,000 and 52 unpaid safety violations are material liabilities
- 45 open violations (0.2 per unit) indicate ongoing compliance issues
- High complaint count of 685 suggests tenant dissatisfaction
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 12.02, against a residential limit of 10.00 — it is over that limit by 2.02. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
Unresolved conditions on record
45 violations remain open across 229 residential units (about 0.2 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Development & zoning
Floor-area ratio
| Built | 12.02 |
|---|---|
| Residential limit | 10.00 |
| Commercial limit | 10.00 |
| Community-facility limit | 10.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 10.00 |
|---|---|
| Unused ratio | -2.02 |
| Unused buildable area | — |
| Lot area | 57,899 sq ft |
Value & taxes
Assessment
| Assessed total | $158,160,150 |
|---|---|
| Assessed land | $28,800,004 |
| Assessed building | $129,360,146 |
| Market value on record | $0 |
| Assessed as % of market | — |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $0 |
| Tax rate | 12.502% |
| Estimated annual levy | — |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $0 | — |
| 2026 | $0 | — |
| 2025 | $0 | — |
| 2024 | $0 | — |
| 2023 | $0 | — |
Building & occupancy
Structure
| Year built | 2005 |
|---|---|
| Floors | 37 |
| Building area | 695,701 sq ft |
| Residential area | 588,767 sq ft |
| Commercial area | 106,934 sq ft |
Occupancy
| Ownership | Condominium |
|---|---|
| Total units | 231 |
| Residential units | 229 |
| Residential Avg unit size | 2,571 sq ft (calculated) |
| Commercial Avg unit size | 53,467 sq ft (calculated) |
| Building class | RM |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | 59 St-Columbus Circle (A, C, B, D) — 0.11 mi |
|---|---|
| School district | 3 |
| Police precinct | 20 |
| Nearest firehouse | Engine 23 — 215 W 58th Street |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Not in an evacuation zone |
Building compliance
| Facade | Repairs required |
|---|
Energy & emissions
| Energy grade | D |
|---|---|
| Energy use intensity | 96.5 kBtu/ft² |
| Greenhouse-gas emissions | 7,291 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 15 Central Park West, 11l | 2026-06-23 | $6,995,000 | — | — |
| 43 West 61st Street, 18j | 2026-06-10 | $940,000 | — | — |
| 15 Central Park West, 8b | 2026-06-02 | $21,000,000 | — | — |
| 44 West 62nd Street, 12a | 2026-05-07 | $1,300,000 | — | — |
| 15 Central Park West, 6k | 2026-05-04 | $3,495,000 | — | — |
| 43 West 61 Street, 12f | 2026-05-01 | $1,300,000 | — | — |
| 15 Central Park West, 2b | 2026-04-29 | $4,400,000 | — | — |
| 44 West 62nd Street, 2f | 2026-04-27 | $767,000 | — | — |
Record activity
Compliance calculated
| Open violations | 45 |
|---|---|
| Open per residential unit | 0.2 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $154,000.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 692 |
|---|---|
| Permits / alterations | 260 |
| Recorded documents | 0 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | W2001/z 15 Central Pk West Rlty LLC |
|---|---|
| Parcel | 1011147503 |
| Block | 1114 |
| Lot | 7503 |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction |
| 2 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction |
| 2 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 15 Sep 2017 | Building | Elevators | Active | — | EVCAT1 |
| 14 Nov 2016 | Building | — | V-Building VIOLATION - ACTIVE | — | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST |
| 14 Nov 2016 | Building | Elevators | Active | — | ACC1 |
| 1 Oct 2012 | Building | Elevators | Active | — | EVCAT1 |
| 30 Jun 2009 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 4 Aug 2026 | N/A | Encampment | Closed | 4 Aug 2026 |
| 2 Aug 2026 | Pothole | Street Condition | Closed | 3 Aug 2026 |
| 29 Jul 2026 | Chronic | Homeless Person Assistance | Closed | 30 Jul 2026 |
| 24 Jul 2026 | Non-Chronic | Homeless Person Assistance | Closed | 25 Jul 2026 |
| 23 Jul 2026 | Non-Chronic | Homeless Person Assistance | Closed | 23 Jul 2026 |
| 22 Jul 2026 | N/A | Panhandling | Closed | 22 Jul 2026 |
| 16 Jul 2026 | N/A | Panhandling | Closed | 16 Jul 2026 |
| 8 Jul 2026 | Garage or Parking Lot | Consumer Complaint | Closed | 8 Aug 2026 |
| 6 Jul 2026 | Blocked Crosswalk | Illegal Parking | Closed | 6 Jul 2026 |
| 29 Jun 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 29 Jun 2026 |
| 29 Jun 2026 | Pothole | Street Condition | Closed | 30 Jun 2026 |
| 28 Jun 2026 | Chronic | Homeless Person Assistance | Closed | 28 Jun 2026 |
| 26 Jun 2026 | Chronic | Homeless Person Assistance | Closed | 27 Jun 2026 |
| 22 Jun 2026 | Chronic | Homeless Person Assistance | Closed | 23 Jun 2026 |
| 18 Jun 2026 | Chronic | Homeless Person Assistance | Closed | 19 Jun 2026 |
| 17 Jun 2026 | Chronic | Homeless Person Assistance | Closed | 17 Jun 2026 |
| 12 Jun 2026 | With License Plate | Abandoned Vehicle | Closed | 12 Jun 2026 |
| 8 Jun 2026 | Non-Food Vendor | Vendor Enforcement | Closed | 8 Jun 2026 |
| 31 May 2026 | Chronic | Homeless Person Assistance | Closed | 31 May 2026 |
| 31 May 2026 | Chronic | Homeless Person Assistance | Closed | 31 May 2026 |
| 27 May 2026 | Damaged/Defective | LinkNYC | Closed | 15 Jun 2026 |
| 27 May 2026 | Damaged/Defective | LinkNYC | Closed | 15 Jun 2026 |
| 22 May 2026 | Chronic | Homeless Person Assistance | Closed | 22 May 2026 |
| 18 May 2026 | Chronic | Homeless Person Assistance | Closed | 18 May 2026 |
| 13 May 2026 | Chronic | Homeless Person Assistance | Closed | 14 May 2026 |
| 13 May 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 13 May 2026 |
| 11 May 2026 | N/A | Panhandling | Closed | 12 May 2026 |
| 10 May 2026 | Blocked Hydrant | Illegal Parking | Closed | 10 May 2026 |
| 5 May 2026 | N/A | Panhandling | Closed | 5 May 2026 |
| 1 May 2026 | Do Not Enter | Street Sign - Damaged | Closed | 4 May 2026 |
| 28 Apr 2026 | N/A | Panhandling | Closed | 28 Apr 2026 |
| 26 Apr 2026 | N/A | Panhandling | Closed | 26 Apr 2026 |
| 24 Apr 2026 | N/A | Panhandling | Closed | 24 Apr 2026 |
| 19 Apr 2026 | Blocked Hydrant | Illegal Parking | Closed | 19 Apr 2026 |
| 18 Apr 2026 | Non-Chronic | Homeless Person Assistance | Closed | 19 Apr 2026 |
| 12 Apr 2026 | Chronic | Homeless Person Assistance | Closed | 13 Apr 2026 |
| 8 Apr 2026 | Blocked Crosswalk | Illegal Parking | Closed | 8 Apr 2026 |
| 5 Apr 2026 | Chronic | Homeless Person Assistance | Closed | 5 Apr 2026 |
| 27 Mar 2026 | N/A | Panhandling | Closed | 27 Mar 2026 |
| 20 Mar 2026 | N/A | Panhandling | Closed | 20 Mar 2026 |
| 13 Mar 2026 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
| 10 Mar 2026 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
| 10 Mar 2026 | N/A | Panhandling | Closed | 10 Mar 2026 |
| 4 Mar 2026 | N/A | Encampment | Closed | 4 Mar 2026 |
| 4 Mar 2026 | Blocked Crosswalk | Illegal Parking | Closed | 4 Mar 2026 |
| 3 Mar 2026 | N/A | Encampment | Closed | 3 Mar 2026 |
| 3 Mar 2026 | N/A | Encampment | Closed | 11 Mar 2026 |
| 3 Mar 2026 | N/A | Encampment | Closed | 5 Mar 2026 |
| 3 Mar 2026 | N/A | Encampment | Closed | 3 Mar 2026 |
| 1 Mar 2026 | Roadway | Snow or Ice | Closed | 2 Mar 2026 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 22 Jan 2026 | General Construction | Permit Issued | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS AND FINISHES ON THE 5TH FLOOR (APT 5A) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 26 Nov 2025 | General Construction | Permit Issued | Interior renovation proposed for an existing penthouse. No change to use, occupancy or egress |
| 3 Oct 2025 | General Construction | Signed-off | Repair entrance door as shown in drawings filed herewith. No change in use, egress or occupancy |
| 1 Oct 2025 | General Construction | Signed-off | Application filed for interior renovation of unit 10 on the 10th floor. No change in use, occupancy or egress |
| 29 Aug 2025 | General Construction | Signed-off | Construction of a 458 sq. ft. suspended ceiling with 12 downlights at the Living Room. No change to use, egress or occupancy under this application |
| 25 Aug 2025 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE |
| 9 Jul 2025 | Plumbing | Signed-off | PLUMBING WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING RESIDENCE UNIT #36B, LOCATED ON THE 28TH CONSTRUCTION FLOOR OF A MULTIPLE DWELLING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 8 Jul 2025 | General Construction | Signed-off | MINOR INTERIOR RENOVATION TO EXISTING APARTMENT 32C ON THE 32TH OF AN EXISTING RESIDENTIAL BUILDING. ARCHITECTURAL WORK. NO CHANGE TO EGRESS, USE, OR OCCUPANCY |
| 9 Jun 2025 | General Construction | Permit Issued | Interior renovation as per plans filed herewith |
| 5 May 2025 | General Construction | Permit Issued | Interior demolition as per plans filed herewith |
| 1 May 2025 | Mechanical Systems | Permit Issued | Interior renovation as per plans filed herewith |
| 14 Mar 2025 | Plumbing | Signed-off | Plumbing work associated with the renovation of an existing 24th floor apartment. There is no change proposed to use, egress, or occupancy |
| 4 Mar 2025 | General Construction | Signed-off | General construction work associated with the renovation of an existing 24th floor apartment. There is no change proposed to use, egress, or occupancy |
| 7 Feb 2025 | Suspended Scaffold | Permit Issued | WINDOW INSPECTION VIA INDUSTRIAL ROPE ACCESS |
| 31 Dec 2024 | General Construction | Permit Issued | MINOR RENOVATION OF APARTMENT 10A FOR CEILING CHANGES AND DECORATIVE CHANGES THROUGHOUT APARTMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 13 Dec 2024 | General Construction | Permit Issued | Apartment renovation including suite, bathroom and kitchen. New millwork as shown on drawings. No change in use, egress or occupancy |
| 13 Dec 2024 | Mechanical Systems | Permit Issued | Modification/addition to existing HVAC ductwork and related piping as shown on drawings. No change in use, egress or occupancy |
| 13 Nov 2024 | Mechanical Systems | Signed-off | Mechanical to be preformed in existing unit #36D on 28th fl. General construction & subsequent plumbing, & sprinkler applications to be filed. All in accordance w/submit plans. All in accordance with submitted plans. No changes to use, egress, or occupanc |
| 13 Nov 2024 | General Construction | Signed-off | Interior renovation to be preformed in existing unit #36D on 28th fl. Subsequent plumbing, Mechanical & sprinkler application to be filed. All in accordance with submit plans. All in accordance with submitted plans. No changes to use, egress or occupancy |
| 23 Oct 2024 | Suspended Scaffold | Permit Issued | RIGGING FOR INDUSTRIAL ROPE ACCESS |
| 20 Sep 2024 | Mechanical Systems | Signed-off | MECHANICAL WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING RESIDENCE UNIT #36B, LOCATED ON THE 28TH CONSTRUCTION FLOOR OF A MULTIPLE DWELLING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 16 Sep 2024 | General Construction | Signed-off | Repair of water and mold damage to existing apartment. Renovation to replace existing finishes iwth new to match. No change to existing layout, use, occupancy or egress |
| 9 Aug 2024 | Sprinklers | Signed-off | SPRINKLER WORK IN CONJUNCTION WITH THE RENOVATION OF EXISTING RESIDENCE UNIT #36B, LOCATED ON THE 28TH CONSTRUCTION FLOOR OF A MULTIPLE DWELLING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 7 Aug 2024 | General Construction | Signed-off | RENOVATION OF EXISTING RESIDENCE UNIT #36B, LOCATED ON THE 28TH CONSTRUCTION FLOOR OF A MULTIPLE DWELLING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 6 Aug 2024 | Plumbing | Signed-off | PLUMBING WORK ASSOCIATED WITH MINOR INTERIOR RENOVATION OF APT. 703 S AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY |
| 1 Aug 2024 | General Construction | Signed-off | MINOR INTERIOR RENOVATION OF APT. 703 S AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS OR OCCUPANCY |
| 20 Jun 2024 | General Construction | Signed-off | INTERIOR RENOVATION OF APT#14L OF A RESIDENTIAL BUILDING WITH NEW MILLWORK AND REMOVAL OF A CLOSET DOOR AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 31 May 2024 | Sprinklers | Signed-off | Sprinkler to be preformed in existing unit #36D on 28th fl. General construction & subsequent mechanical & plumbing application to be filed. All in accordance w/ submit plans. All in accordance with submitted plans. No changes to use, egress, or occupancy |
| 20 May 2024 | Plumbing | Signed-off | Plumbing to be preformed in existing unit #36D on 28th fl. General construction & subsequent mechanical & sprinkler application to be filed. All in accordance w/ submit plans. All in accordance with submitted plans. No changes to use, egress or occupancy |
| 1 May 2024 | Suspended Scaffold | Permit Issued | IRA to assist with Condition Assessment |
| 10 Apr 2024 | Sprinklers | Signed-off | Filing for modification of the existing sprinkler system in conjunction with the interior renovation of the apartment. no change in use, egress or occupancy |
| 2 Apr 2024 | Plumbing | Signed-off | Modifications to plumbing fixtures in kitchen, bathrooms and laundry rooms in apt. 27A. No change in use, egress or occupancy is involved |
| 29 Mar 2024 | Plumbing | Signed-off | PLUMBING WORK FILED IN CONJUNCTION WITH Building NOW # M01000379-S1 AT APARTMENT 27B AT 27th FLOOR. NO CHANGE IN OCCUPANCY, USE, EGRESS, AND BULK |
| 22 Mar 2024 | General Construction | Signed-off | Alt. herewith file for reno. of an exist. apt. at the 27th fl. of an exist. 230 families, mixed-use building. Work includes reno. of exist. kitchen, exist. bathrooms, and alt. to the exist. layout in apt. 27B. No change in occupancy, use, egress, or bulk |
| 11 Dec 2023 | Sprinklers | Signed-off | Modify sprinklers in apt. 27A as per plans filed. No change to use, egress or occupancy is involved |
| 17 Nov 2023 | Mechanical Systems | Signed-off | Modify existing heating and cooling system in apt. 27A. No change to use, egress or occupancy is involved |
| 17 Nov 2023 | General Construction | Signed-off | General construction for renovation of Apt 27A, Work includes removal and installation of partitions, doors, ceiling and finishes. No change to use, egress or occupancy is involved |
| 24 Oct 2023 | General Construction | Signed-off | Temporary tent accessory to the amenity restaurant for flood mitigation. Removed at the end of the repairs. No changes to existing structures, use or egress |
| 30 Jun 2023 | General Construction | Signed-off | INTERIOR RENOVATION OF AN EXISTING APARTMENT IN A MULTI-FAMILY CONDOMINIMUM BUILDING. THE SCOPE WILL INCLUDE SELECTIVE DEMOLITION OF INTERIOR FINISHES AND NON-FIRE RATED INTERIOR PARTITIONS. THERE IS NO PROPOSED CHANGE TO USE OR OCCUPANCY |
| 23 Jun 2023 | Mechanical Systems | Permit Issued | MECHANICAL WORK FILED AS PER PLANS FILED HEREWITH. NO CHANGE I USE, EGRESS AND OCCUPANCY |
| 5 Apr 2023 | General Construction | Signed-off | Renovation of a duplex apartment at the 15th and 16th floors |
| 4 Apr 2023 | Mechanical Systems | Signed-off | Filing for the modification of the existing 4-pipe HVAC system in conjunction with the interior renovation of the apartment. No change in use, egress or occupancy |
| 3 Apr 2023 | Plumbing | Signed-off | Filing for the plumbing work in conjunction with the renovation of the apartment . No change in use, egress or occupancy |
| 28 Mar 2023 | General Construction | Signed-off | Renovate apt#37A. Remove and install interior partition, flooring ,finishes etc. No change in use, egress or occupancy |
| 20 Jan 2023 | Plumbing | Signed-off | Plumbing and sprinkler work filed in conjunction with apartment PHA renovation on the 15th and 16th floors |
| 13 Jan 2023 | Mechanical Systems | Signed-off | Mechanical work filed in conjunction with renovation of apartment PHA on the 15th and 16th floors |
| 22 Dec 2022 | Mechanical Systems | Signed-off | AMENDMENT OF EXISTING DUCTWORK AND REGISTERS; EXISTING HVAC EQUIPMENT TO REMAIN; NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| 16 Nov 2022 | Mechanical Systems | Permit Issued | Mechanical scope associated with apartment renovation. No change in use, egress or occupancy |
| 12 Oct 2022 | Structural | Signed-off | Filing for the restoration of concrete slab in compactor room, slab in Steam Room, and concrete pads and curbs. Approximately 1700 sf |
| 1 Oct 2022 | Mechanical Systems | Signed-off | Filing for the replacement of (2) existing heating pumps and Air compressor |
Showing the 50 most recent of 150. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 5 days ago. Coverage on this parcel: 14 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.