1 Columbus Circle
Analysis
The building has strong size and valuation fundamentals but is constrained by over‑building and safety penalties, resulting in a medium risk rating.
The good
- 225 residential units provide a sizable rental inventory
- Building age of 2004 suggests relatively modern construction
- High assessed value of $871,099,981 indicates strong underlying asset value
- 54 floors and 2,101,982 sq ft of building area offer extensive amenity space
The bad
- Built beyond the residential floor‑area limit (FAR 14.05 vs limit 10) limits future residential expansion
- Safety‑violation penalties of $19,000 and 9 unpaid safety reports are material debts that often catch buyers off guard
- 15 open violations (0.1 per unit) signal ongoing compliance issues
- No arm‑length sale and a recorded market value of $0 mean there is no recent comparable sale price
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 14.05, against a residential limit of 10.00 — it is over that limit by 4.05. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands. A higher limit of 15.00 does apply to community-facility use, which produces an apparent 142,082 sq ft of headroom — but that is not residential floor area and is not interchangeable with it. Reading that number as room for more apartments is the most expensive mistake available in this data.
Unresolved conditions on record
15 violations remain open across 225 residential units (about 0.1 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Development & zoning
Floor-area ratio
| Built | 14.05 |
|---|---|
| Residential limit | 10.00 |
| Commercial limit | 15.00 |
| Community-facility limit | 15.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 15.00 |
|---|---|
| Unused ratio | 0.95 |
| Unused buildable area | 142,082 sq ft |
| Lot area | 149,560 sq ft |
Value & taxes
Assessment
| Assessed total | $871,099,981 |
|---|---|
| Assessed land | $112,337,384 |
| Assessed building | $758,762,597 |
| Market value on record | $0 |
| Assessed as % of market | — |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $0 |
| Tax rate | 12.502% |
| Estimated annual levy | — |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $0 | — |
| 2026 | $0 | — |
| 2025 | $0 | — |
| 2024 | $0 | — |
| 2023 | $0 | — |
Building & occupancy
Structure
| Year built | 2004 |
|---|---|
| Floors | 54 |
| Building area | 2,101,982 sq ft |
| Residential area | 441,883 sq ft |
| Commercial area | 1,446,974 sq ft |
Occupancy
| Ownership | Condominium |
|---|---|
| Total units | 233 |
| Residential units | 225 |
| Residential Avg unit size | 1,964 sq ft (calculated) |
| Commercial Avg unit size | 180,872 sq ft (calculated) |
| Building class | RM |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | 59 St-Columbus Circle (1) — 0.06 mi |
|---|---|
| School district | 2 |
| Police precinct | 18 |
| Nearest firehouse | Engine 23 — 215 W 58th Street |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Not in an evacuation zone |
Building compliance
| Facade | Repairs required |
|---|
Energy & emissions
| Energy use intensity | 124.5 kBtu/ft² |
|---|---|
| Greenhouse-gas emissions | 29,493 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 345 West 58th Street, 6ss | 2026-08-24 | $830,000 | — | — |
| 30 W 60 St, 4tn | 2026-08-12 | $710,000 | — | — |
| 345 West 58th Street, 12as | 2026-07-21 | $1,560,000 | — | — |
| 30 West 60th Street, 11m | 2026-06-02 | $1,525,000 | — | — |
| 30 West 60th Street, 7a | 2026-06-01 | $2,600,000 | — | — |
| 345 West 58th Street, 6xys | 2026-05-26 | $1,545,000 | — | — |
| 345 West 58th Street, 15l | 2026-05-20 | $540,000 | — | — |
| 30 West 60th Street, 8ln | 2026-05-15 | $535,000 | — | — |
Record activity
Compliance calculated
| Open violations | 15 |
|---|---|
| Open per residential unit | 0.1 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $19,000.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 802 |
|---|---|
| Permits / alterations | 260 |
| Recorded documents | 0 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Time Warner Center Condominium |
|---|---|
| Parcel | 1010497501 |
| Block | 1049 |
| Lot | 7501 |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Report |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 2 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction |
| 2 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction |
| 2 May 2011 | Building | — | V-Building VIOLATION - ACTIVE | — | E-ELEVATOR ELEVATORREQUIRED |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 25 Sep 2026 | Manufacturing Business/Plant | Noise | In Progress | — |
| 23 Sep 2026 | Cave-in | Street Condition | Closed | 25 Sep 2026 |
| 15 Sep 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 15 Sep 2026 |
| 4 Sep 2026 | Bag/Wallet | Lost Property | Closed | 4 Sep 2026 |
| 1 Sep 2026 | Elevator - Multiple Devices On Property | Elevator | Closed | 3 Sep 2026 |
| 22 Aug 2026 | Bag/Wallet | Lost Property | Closed | 24 Aug 2026 |
| 20 Aug 2026 | Construction | Noise | Closed | 26 Aug 2026 |
| 15 Aug 2026 | Driver Complaint - Non Passenger | Taxi Complaint | In Progress | — |
| 14 Aug 2026 | 1 or 2 | Food Poisoning | Closed | 18 Aug 2026 |
| 14 Aug 2026 | Food Contaminated | Food Establishment | In Progress | — |
| 12 Aug 2026 | Fire Hydrant Running | Water Maintenance | Closed | 14 Aug 2026 |
| 8 Aug 2026 | Pet/Animal | Food Establishment | In Progress | — |
| 3 Aug 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 3 Aug 2026 |
| 1 Aug 2026 | Plumbing | Mobile Food Vendor | In Progress | — |
| 31 Jul 2026 | Used Car Dealer | Consumer Complaint | Closed | 2 Sep 2026 |
| 30 Jul 2026 | Blocked Sidewalk | Illegal Parking | Closed | 30 Jul 2026 |
| 23 Jul 2026 | Injured Wildlife | Animal in a Park | Closed | 23 Jul 2026 |
| 23 Jul 2026 | Leak (Use Comments) (WA2 | Water System | Closed | 23 Jul 2026 |
| 23 Jul 2026 | Sidewalk Grating - Defective | Sidewalk Condition | Closed | 23 Jul 2026 |
| 17 Jul 2026 | Partial Access | Blocked Driveway | Closed | 17 Jul 2026 |
| 8 Jul 2026 | Food Contaminated | Food Establishment | Closed | 6 Sep 2026 |
| 5 Jul 2026 | Car Rental | Consumer Complaint | Closed | 5 Aug 2026 |
| 30 Jun 2026 | Elevator - Multiple Devices On Property | Elevator | Closed | 1 Jul 2026 |
| 29 Jun 2026 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
| 29 Jun 2026 | Bag/Wallet | Lost Property | Closed | 29 Jun 2026 |
| 21 Jun 2026 | Rodents/Insects/Garbage | Food Establishment | Closed | 21 Aug 2026 |
| 16 Jun 2026 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
| 14 Jun 2026 | Driver Report - Passenger | Taxi Report | In Progress | — |
| 13 Jun 2026 | Rodents/Insects/Garbage | Food Establishment | Closed | 12 Aug 2026 |
| 13 Jun 2026 | Driver Complaint - Passenger | Taxi Complaint | In Progress | — |
| 9 Jun 2026 | Food Protection | Food Establishment | Closed | 8 Aug 2026 |
| 7 Jun 2026 | Pet/Animal | Food Establishment | Closed | 21 Jun 2026 |
| 7 Jun 2026 | After Hours Work - Illegal | Emergency Response Team (ERT | Closed | 16 Jun 2026 |
| 6 Jun 2026 | Driver Compliment | Taxi Compliment | Closed | 17 Aug 2026 |
| 31 May 2026 | Pet/Animal | Food Establishment | Closed | 21 Jun 2026 |
| 27 May 2026 | Other | Lost Property | Closed | 29 May 2026 |
| 24 May 2026 | Bag/Wallet | Lost Property | Closed | 27 May 2026 |
| 19 May 2026 | Vehicle Complaint | Taxi Complaint | In Progress | — |
| 3 May 2026 | Pet/Animal | Food Establishment | Closed | 21 Jun 2026 |
| 1 May 2026 | Commercial Overnight Parking | Illegal Parking | Closed | 1 May 2026 |
| 29 Apr 2026 | Bag/Wallet | Lost Property | Closed | 30 Apr 2026 |
| 28 Apr 2026 | Bag/Wallet | Lost Property | Closed | 29 Apr 2026 |
| 26 Apr 2026 | Driver Complaint - Passenger | Taxi Complaint | In Progress | — |
| 24 Apr 2026 | Car Service Company Report | For Hire Vehicle Report | In Progress | — |
| 22 Apr 2026 | Pet/Animal | Food Establishment | Closed | 21 Jun 2026 |
| 14 Apr 2026 | Electrical Wiring Defective/Exposed | Electrical | Closed | 27 Apr 2026 |
| 13 Apr 2026 | 1 or 2 | Food Poisoning | Closed | 14 Apr 2026 |
| 13 Apr 2026 | Sewage Odor | Indoor Air Quality | Closed | 16 Apr 2026 |
| 13 Apr 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 13 Apr 2026 |
| 9 Apr 2026 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 21 Apr 2025 | Mechanical Systems | Permit Issued | Installation of (3) humidifiers and modification of the existing ductwork. No change in egress, occupancy, or use under this application |
| 11 Mar 2025 | Plumbing | Signed-off | Modification to plumbing fixtures and related piping for retail space (Shake Shack) 4th Floor Construction/3rd Floor Marketing as shown on drawings. No change in use, egress or occupancy |
| 14 Feb 2025 | Protection and Mechanical Methods | Signed-off | Installation and use of the temporary work platform as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 12 Feb 2025 | Mechanical Systems | Signed-off | Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy |
| 12 Feb 2025 | General Construction | Signed-off | Interior renovation of an existing retail store. Removal and construction of non-structural partitions, ceilings and floors as shown on drawings. No change in use, egress or occupancy |
| 14 Nov 2024 | General Construction | Permit Issued | COMBINE APT 62A & 62F ON 35TH FLOOR. INTERIOR RENOVATION. REMOVE AND CONSTRUCT OF NON-BEARING OR NON-STRUCTURAL PARTITIONS. CHANGE IN EGRESS. NO CHANGE IN USE OR OCCUPANCY |
| 1 Jul 2024 | Mechanical Systems | Signed-off | INSTALLATION OF 3 FAN COIL UNITS FOR HVAC SYSTEM AND MODIFICATION OF DUCT WORK. NO CHANGE IN EGRESS, OCCUPANCY, OR USE UNDER THIS APPLICATION |
| 21 Jun 2024 | Sign | Signed-off | ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN ON EXISTING SIGN CABINET; COPY READING J. P. MORGAN |
| 21 Jun 2024 | Sign | Signed-off | ERECT ILLUMINATED ACCESSORY BUSINESS WALL SIGN; COPY READING J. P. MORGAN |
| 17 Jun 2024 | Plumbing | Signed-off | Modification to plumbing fixtures and related piping on 4th Floor Construction/3rd Floor Marketing M00868550 as shown on drawings filed herewith. No change in use, egress or occupancy |
| 8 May 2024 | General Construction | Signed-off | REMOVAL/INSTALLATION OF NON-LOAD BEARING INTERIOR PARTITIONS. COSMETIC FINISHES FOR FLOOR, WALLS, & CEILING. NO CHANGE IN EGRESS, OCCUPANCY, OR USE UNDER THIS APPLICATION |
| 30 Apr 2024 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 24 Apr 2024 | Plumbing | Signed-off | INSTALL NEW PLUMBING AND SPRINKLER COMPONENTS FOR CHASE BANKS |
| 28 Mar 2024 | General Construction | Signed-off | INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILEDHEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 28 Mar 2024 | Mechanical Systems | Signed-off | INSTALL NEW HVAC SYSTEM FOR CHASE BANK |
| 1 Mar 2024 | Plumbing | Signed-off | Remove existing plumbing fixtures and components. No change to use, egress or occupancy |
| 1 Mar 2024 | Structural | Signed-off | Structural work associated with retail space (Shake Shack) as shown on drawings. No change in use, egress or occupancy |
| 29 Feb 2024 | Mechanical Systems | Signed-off | Remove mechanical components. No change to use, egress or occupancy |
| 29 Feb 2024 | Sprinklers | Signed-off | Modifying the sprinkler system and install a temp sprinkler loop for Chase Bank |
| 8 Dec 2023 | Plumbing | Signed-off | Modification to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy |
| 7 Dec 2023 | Mechanical Systems | Signed-off | Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy |
| 6 Dec 2023 | General Construction | Signed-off | Removal of existing non-load bearing partitions, convenience stair, & elevator. Repair fire smoke seal at perimeter. Patch all floors & walls for white box level finish. Removal of existing glass at facade & replace with active louver (landlord scope |
| 12 Oct 2023 | General Construction | Signed-off | Removal/installation OF DEUTSCHE BANK OPEN OFFICES on 9th, 13th & 14th Floor (8th, 12th & 14th Floor Marketing). Removal/installation of interior non-bearing partitions & related finishes. No change in use, egress or occupancy |
| 2 Oct 2023 | Mechanical Systems | Signed-off | MECHANICAL DEMO AND MODIFICATION OF DEUTSCHE BANK OPEN OFFICES on 13th & 14th Floor (12th & 14th Floor Marketing). Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy |
| 18 Sep 2023 | Plumbing | Permit Issued | FILING PLUMBING WORK TO INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| 11 Aug 2023 | General Construction | Signed-off | Filing herewith general construction to include interior renovation and minor interior demolition to an existing commercial space located on the 1st fl, space 102C |
| 31 Jul 2023 | Sprinklers | Signed-off | Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy |
| 17 Jul 2023 | General Construction | Signed-off | REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 15 Jul 2023 | General Construction | Signed-off | Interior tenant improvement construction of new non-structural partitions, doors and ceilings. New interior storefront as shown on drawings filed herewith. No change in use, egress or occupancy |
| 30 Jun 2023 | Plumbing | Signed-off | REPLACEMENT/INSTALLATION OF PLUMBING FIXTURES. NO CHANGE IN EGRESS, OCCUPANCY, OR USE UNDER THIS APPLICATION |
| 6 Jun 2023 | Mechanical Systems | Signed-off | Removal and Replacement of existing fan coil units in existing locations in apartments 73 CE. No change in occupancy use or egress |
| 30 May 2023 | Earth Work | Signed-off | Landscape filing for terrace work, marketing floor 16th |
| 30 May 2023 | General Construction | Signed-off | Filing herewith for the terrace scope of work |
| 19 May 2023 | Mechanical Systems | Signed-off | FILING TO MODIFY EXISTING KITCHEN EXHAUST DUCT AND NEW ELECTROSTATIC PRECIPITATOR TO ACCOMMODATE NEW EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| 8 Feb 2023 | Mechanical Systems | Signed-off | Replacement of air cooled condensing units & indoor air handling units for South Roof Satellite Room. No change in use, egress and occupancy |
| 6 Feb 2023 | Sprinklers | Signed-off | Sprinkler work in conjunction with M00682660 for the renovation of an existing office on the 20th Floor. No change in egress, use, or occupancy under this application |
| 4 Feb 2023 | Plumbing | Signed-off | Removal, relocation, replacement, and installation of new plumbing fixtures in bathrooms, powder rooms, and pantry of apartment 73 E. No change in occupancy use or egress |
| 21 Dec 2022 | Standpipe | Signed-off | Relocation of one FHC |
| 13 Oct 2022 | Sprinklers | Signed-off | Filing herewith to show modification to sprinkler heads as per plans filed herewith. Marketing floors 16, 17 & 18 |
| 11 Oct 2022 | Plumbing | Signed-off | Plumbing modifications taking place on the 15th floor (19th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy |
| 3 Oct 2022 | General Construction | Signed-off | Installation of non load bearing partitions as per plans filed herewith. Marketing floors 16, 17 & 18 |
| 28 Sep 2022 | General Construction | Signed-off | General construction modifications taking place on the 15th floor (19th floor marketing) as per drawings filed herewith. No change in use, egress or occupancy |
| 20 Sep 2022 | Construction Fence | Permit Issued | INSTALLATION OF TEMPORARY 4' HIGH FENCE SUPPORTED BY CONCRETE BARRIERS ON ROADWAY. FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS |
| 3 Sep 2022 | General Construction | Signed-off | REPLACEMENT OF EXISTING EXTERIOR DOORS, FRAMES AND HARDWARE AND SIDEWALK REPAIR ALONG WEST 58TH STREET AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 11 Aug 2022 | General Construction | Signed-off | FILING MINOR INTERIOR RENOVATION, PARTITIONS AND REPLACE FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| 5 Aug 2022 | General Construction | Signed-off | Interior renovation of an existing class A apartment. As per plans filed herewith. No change of use, egress, or occupancy |
| 2 Aug 2022 | General Construction | Signed-off | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST FLOOR (HUGO BOSS) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 6 Jun 2022 | General Construction | Signed-off | Removal and relocation of existing partitions with new floor and ceiling finish adjustments. Renovation of bathrooms and Kitchen Removal in 73E as required for the combination of Apts 73C and E as per TPPN 3/97. No change in occupancy use or egress |
| 31 May 2022 | General Construction | Signed-off | RENOVATION OF EXISTING COMMERCIAL SPACE IN AN EXISTING COMMERCIAL BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION |
| 26 Apr 2022 | General Construction | Signed-off | Interior alteration as shown on drawings filed herewith. No change in use, egress or occupancy |
Showing the 50 most recent of 150. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 3 days ago. Coverage on this parcel: 14 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.