217 West 57th Street
Analysis
The building’s modern age and high assessed value are offset by significant regulatory and compliance risks, including over‑built residential floor area and sizable safety penalties, leading to a high risk rating.
The good
- Built in 2013, so relatively new construction
- Large assessed value of $240,703,214 indicates strong asset base
- High average unit size of 4,908 sq ft suggests premium apartments
- 98 floors provide extensive vertical capacity
The bad
- Over‑built for residential use (built FAR 15.73 exceeds residential limit of 10)
- Safety‑violation penalties of $124,000 and 42 unpaid safety violations
- 93 open violations (0.5 per unit) signal ongoing compliance issues
- No arm‑length sale recorded, limiting price transparency
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 15.73, against a residential limit of 10.00 — it is over that limit by 5.73. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
Unresolved conditions on record
93 violations remain open across 179 residential units (about 0.5 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Development & zoning
Floor-area ratio
| Built | 15.73 |
|---|---|
| Residential limit | 10.00 |
| Commercial limit | 4.00 |
| Community-facility limit | 10.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 10.00 |
|---|---|
| Unused ratio | -5.73 |
| Unused buildable area | — |
| Lot area | 55,862 sq ft |
Value & taxes
Assessment
| Assessed total | $240,703,214 |
|---|---|
| Assessed land | $14,467,508 |
| Assessed building | $226,235,706 |
| Market value on record | $0 |
| Assessed as % of market | — |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $0 |
| Tax rate | 12.502% |
| Estimated annual levy | — |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $0 | — |
| 2026 | $0 | — |
| 2025 | $0 | — |
| 2024 | $0 | — |
| 2023 | $0 | — |
Building & occupancy
Structure
| Year built | 2013 |
|---|---|
| Floors | 98 |
| Building area | 878,615 sq ft |
| Residential area | 602,078 sq ft |
| Commercial area | 276,537 sq ft |
Occupancy
| Ownership | Condominium |
|---|---|
| Total units | 180 |
| Residential units | 179 |
| Residential Avg unit size | 3,364 sq ft (calculated) |
| Commercial Avg unit size | 276,537 sq ft (calculated) |
| Building class | RM |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | 59 St-Columbus Circle (1) — 0.13 mi |
|---|---|
| School district | 2 |
| Police precinct | 18 |
| Nearest firehouse | Engine 23 — 215 W 58th Street |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Not in an evacuation zone |
Energy & emissions
| Energy use intensity | 80.2 kBtu/ft² |
|---|---|
| Greenhouse-gas emissions | 8,886 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 217 West 57th Street, 70n | 2026-05-27 | $8,170,250 | — | — |
| 217 West 57th Street, 57w | 2026-04-28 | $12,660,529 | — | — |
| 217 West 57th Street, 48b | 2026-03-24 | $11,947,025 | — | — |
| 217 West 57th Street, 82e | 2026-03-12 | $23,991,875 | — | — |
| 217 West 57th Street, 81e | 2026-02-27 | $24,502,250 | — | — |
| 217 West 57th Street, 121 | 2025-11-04 | $47,469,125 | — | — |
| 217 West 57th Street, 67n | 2025-08-06 | $7,864,025 | — | — |
| 217 West 57th Street, 62e | 2025-07-29 | $17,612,188 | — | — |
Record activity
Compliance calculated
| Open violations | 93 |
|---|---|
| Open per residential unit | 0.5 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $124,000.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 164 |
|---|---|
| Permits / alterations | 132 |
| Recorded documents | 0 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Broadway 57th/58th Retail Investor, LLC |
|---|---|
| Parcel | 1010297502 |
| Block | 1029 |
| Lot | 7502 |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Report |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 2 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction |
| 2 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction |
| 2 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 25 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
Showing the 50 most recent of 93. The full set is available in the interactive report.
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 20 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 20 Jul 2026 |
| 16 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 16 Jul 2026 |
| 12 Jul 2026 | Clothing, Shoe, or Accessories Store | Consumer Complaint | In Progress | — |
| 2 Jul 2026 | Clothing, Shoe, or Accessories Store | Consumer Complaint | In Progress | — |
| 5 Jun 2026 | Facility Construction | Food Establishment | Closed | 4 Aug 2026 |
| 28 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 28 May 2026 |
| 18 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 18 May 2026 |
| 14 May 2026 | Food Protection | Food Establishment | Closed | 13 Jul 2026 |
| 24 Mar 2026 | Non-Chronic | Homeless Person Assistance | Closed | 24 Mar 2026 |
| 23 Feb 2026 | Elevator - Multiple Devices On Property | Elevator | Closed | 26 Mar 2026 |
| 26 Nov 2025 | License Plate Obscured | Illegal Parking | Closed | 26 Nov 2025 |
| 22 Nov 2025 | Engine Idling | Noise - Vehicle | Closed | 22 Nov 2025 |
| 10 Nov 2025 | 1 or 2 | Food Poisoning | Closed | 5 Dec 2025 |
| 31 Oct 2025 | CSC - Monitoring Tracking | Construction Safety Enforcement | Closed | 31 Oct 2025 |
| 8 Sep 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 8 Sep 2025 |
| 3 Jul 2025 | Bag/Wallet | Lost Property | Closed | 8 Jul 2025 |
| 1 Jul 2025 | Bag/Wallet | Lost Property | Closed | 1 Jul 2025 |
| 26 Jun 2025 | Illegal Hotel Rooms In Residential Building | Special Projects Inspection Team (SPIT | Closed | 19 Sep 2025 |
| 11 Jun 2025 | Driver Report - Passenger | Taxi Report | In Progress | — |
| 7 Jun 2025 | Loud Music/Party | Noise - Commercial | Closed | 8 Jun 2025 |
| 16 Apr 2025 | Street Light Cycling | Street Light Condition | Closed | 23 Apr 2025 |
| 22 Mar 2025 | Paper License Plates | Illegal Parking | Closed | 22 Mar 2025 |
| 16 Mar 2025 | Water | Food Establishment | Closed | 16 May 2025 |
| 22 Jan 2025 | Inadequate or No Heat | Non-Residential Heat | Closed | 23 Mar 2025 |
| 22 Jan 2025 | Inadequate or No Heat | Non-Residential Heat | Closed | 23 Mar 2025 |
| 22 Jan 2025 | Inadequate or No Heat | Non-Residential Heat | Closed | 23 Mar 2025 |
| 2 Dec 2024 | Food Protection | Food Establishment | Closed | 31 Jan 2025 |
| 1 Dec 2024 | No Access | Blocked Driveway | Closed | 1 Dec 2024 |
| 2 Nov 2024 | Defective Hardware | Street Condition | Closed | 4 Nov 2024 |
| 4 Oct 2024 | Loud Music/Party | Noise - Residential | Closed | 4 Oct 2024 |
| 4 Oct 2024 | Loud Music/Party | Noise - Residential | Closed | 4 Oct 2024 |
| 2 Oct 2024 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | Closed | 4 Nov 2024 |
| 2 Oct 2024 | Posted Parking Sign Violation | Illegal Parking | Closed | 2 Oct 2024 |
| 30 Sep 2024 | Loud Music/Party | Noise - Residential | Closed | 30 Sep 2024 |
| 30 Sep 2024 | Loud Music/Party | Noise - Residential | Closed | 30 Sep 2024 |
| 30 Sep 2024 | Loud Music/Party | Noise - Residential | Closed | 30 Sep 2024 |
| 30 Sep 2024 | Loud Music/Party | Noise - Residential | Closed | 30 Sep 2024 |
| 30 Sep 2024 | Loud Music/Party | Noise - Commercial | Closed | 30 Sep 2024 |
| 4 Aug 2024 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 4 Aug 2024 |
| 15 Jul 2024 | Department Store or Megastore | Consumer Complaint | Closed | 15 Jul 2024 |
| 12 Jul 2024 | Parking Permit Improper Use | Illegal Parking | Closed | 12 Jul 2024 |
| 14 Jun 2024 | Graffiti | Graffiti | Closed | 22 Jul 2024 |
| 13 Jun 2024 | Department Store or Megastore | Consumer Complaint | Closed | 14 Jul 2024 |
| 5 Jun 2024 | Clothing, Shoe, or Accessories Store | Consumer Complaint | Closed | 14 Jun 2024 |
| 18 May 2024 | Sidewalk Zone Blocked | Outdoor Dining | Closed | 24 May 2024 |
| 6 Apr 2024 | Horse-Drawn Cab | Consumer Complaint | Closed | 8 Apr 2024 |
| 5 Apr 2024 | No Access | Blocked Driveway | Closed | 5 Apr 2024 |
| 22 Mar 2024 | Trash | Dirty Condition | Closed | 23 Mar 2024 |
| 24 Feb 2024 | Department Store or Megastore | Consumer Complaint | Closed | 14 Mar 2024 |
| 24 Feb 2024 | Clothing, Shoe, or Accessories Store | Consumer Complaint | Closed | 14 Mar 2024 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 21 May 2026 | Sprinklers | Permit Issued | HEREWITH FILING FOR INTERIOR MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM IN THE SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE OCCUPANY OR EGRESS UNDER THIS APPLICATION |
| 20 May 2026 | Plumbing | Permit Issued | HEREWITH FILING FOR INTERIOR MODIFICATIONS TO THE EXISTING PLUMBING FIXTURES IN THE SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE OCCUPANY OR EGRESS UNDER THIS APPLICATION |
| 6 May 2026 | General Construction | Signed-off | RENOVATION OF EXTERIOR BALCONY ON THE 71TH FLOOR, APT 109 |
| 31 Mar 2026 | Plumbing | Signed-off | HEREWITH FILING FOR INTERIOR DEMOLITION OF EXISTING PLUMBING FIXTURES IN THE SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE OCCUPANY OR EGRESS UNDER THIS APPLICATION |
| 18 Mar 2026 | Mechanical Systems | Signed-off | HEREWITH FILING FOR INTERIOR DEMOLITION OF EXISTING MECHANICAL SYSTEMS IN SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS |
| 18 Mar 2026 | General Construction | Signed-off | HEREWITH FILING FOR DEMOLITION OF THE SUBCELLAR #1 AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION |
| 12 Sep 2025 | Structural | Signed-off | HEREWITH FILING FOR INTERIOR RENOVATIONS ON THE 1ST FLOOR AS PER PLANS. NO CHANGE TO USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 5 Sep 2025 | General Construction | Signed-off | HEREWITH FILING FOR INTERIOR RENOVATIONS ON THE 1ST FLOOR COMMERCIAL SPACE AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS |
| 2 Apr 2025 | General Construction | Signed-off | INTERIOR RENOVATION OF APARTMENT 112 ON THE 74TH FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY OR EGRESS |
| 10 Feb 2025 | Plumbing | Signed-off | INSTALL GAS LINE (BENEATH TERRACE PAVERS) TO BBQ ON TERRACE AT UNIT 39B ON THE 20TH CONSTRUCTION FLOOR AS PER PLANS FILED. NO CHANGE TO USE, OCCUPANCY, OR EGRESS |
| 6 Feb 2025 | Plumbing | Signed-off | PROVIDE BATHROOM AND KITCHEN PLUMBING FIXTURES AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 17 Oct 2024 | General Construction | Signed-off | Minor interior demolition of non load bearing partitions, construction of non load bearing partitions and finishes. No Change in use, egress or occupancy |
| 31 Jul 2024 | General Construction | Permit Issued | General construction work associated with the renovation of apartment 49A |
| 5 Jun 2024 | Sprinklers | Signed-off | Remove, replace and relocate new sprinkler heads in existing apartment as shown on plans filed herewith. No change in use, egress or occupancy |
| 28 May 2024 | Mechanical Systems | Signed-off | Replace and extend ducts and diffusers. No change in use, egress or occupancy |
| 6 May 2024 | Plumbing | Signed-off | Remove, replace and relocate existing plumbing fixtures |
| 14 Dec 2023 | Curb Cut | Signed-off | PROVIDE CURB CUT (CC-102) ON WEST 58H STREET FOR PASSENGER DROP OFF AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 14 Dec 2023 | Curb Cut | Signed-off | PROVIDE CURB CUT (CC-101) AT LOADING DOCK AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 27 Oct 2023 | Mechanical Systems | Signed-off | Filing modification mechanical duck and piping work for the existing mechanical system in existing residential space as per plan filed herewith. No change in use, egress, and occupancy |
| 13 Oct 2023 | Supported Scaffold | Signed-off | TWO (2) SCAFFOLD STAIR TOWERS AS PER DRAWINGS DURING NB CONSTRUCTION, FILED SEPARATELY. SCAFFOLD STAIR TOWERS SHALL COMPLY WITH CHAPTER #33 OF NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SUPERSEDES # 122026093 FOR SIGN OFF ONLY |
| 27 Sep 2023 | Protection and Mechanical Methods | Signed-off | NORTH BMU A: USE OF TEMP SUSPENDED SCAFFOLD FROM PERMANENTLY INSTALLED BMU SYSTEM DURING CONSTRUCTION OPERATIONS. TEMPORARY SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 27 Sep 2023 | Protection and Mechanical Methods | Signed-off | NORTH BMU B: USE OF TEMP SUSPENDED SCAFFOLD FROM PERMANENTLY INSTALLED BMU SYSTEM DURING CONSTRUCTION OPERATIONS. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 6 Sep 2023 | Plumbing | Signed-off | INSTALL NEW BATHROOM IN EXISTING APARTMENT ON 28TH FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 31 Aug 2023 | General Construction | Signed-off | Interior renovation of an existing class A apartment, as per plans filed herewith. No change of use, egress, or occupancy |
| 25 Jul 2023 | General Construction | Signed-off | Proposed interior renovation in existing residential unit on 76th floor with non-structural partition wall removal, wall and floor finishes, and millwork, as per plan showed. No change to use, egress, and occupancy |
| 6 Jun 2023 | General Construction | Signed-off | INTERIOR RENOVATION OF EXISTING APARTMENT ON THE 28TH FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 24 Apr 2023 | Protection and Mechanical Methods | Signed-off | Use of Building Maintenance Unit (BMU) as per plans filed herewith |
| 11 Jan 2023 | General Construction | Signed-off | CREATE CONVENIENCE OPENING BETWEEN UNIT 85E AND 85W ON THE 55TH CONSTRUCTION FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 5 Jan 2023 | Sprinklers | Signed-off | MODIFY EXISTING SPRINKLER LAYOUT IN APARTMENT 28 AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 21 Dec 2022 | A2 | ISSUED | — |
| 7 Nov 2022 | A2 | ISSUED | — |
| 17 Oct 2022 | General Construction | Signed-off | Filing for interior renovation of apartment#123 on the 85th Floor |
| 22 Sep 2022 | Sprinklers | Signed-off | REMOVE CERTAIN EXISTING SPRINKLER HEADS AND ADD NEW SPRINKLER HEADS IN APARTMENT 112 ON THE 74TH CONSTRUCTION FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 2 Sep 2022 | General Construction | Signed-off | RENOVATE APARTMENT 53 ON THE 28TH CONSTRUCTION FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 16 Jul 2022 | Plumbing | Signed-off | MINOR PL WORK ASSOCIATED WITH NEW LAYOUT FOR NORDSTROM PER PLANS FILED HEREWITH. INSTALL SERVICE SINK AND EYE WASH. NO CHANGE IN EGRESS, USE OR OCCUPANCY |
| 14 Jul 2022 | Sprinklers | Signed-off | Install one new sprinkler head and relocate 28 heads. No change to use, egress or occupancy |
| 13 Jul 2022 | Mechanical Systems | Signed-off | Replace and extend ducts and diffusers. No change in use, egress or occupancy |
| 28 Jun 2022 | General Construction | Signed-off | Relocated/add exhaust grille and diffuser for minor work in existing retail store occupied by NORDSTROM. No change in egress, use or occupancy. Cx of mech system not req'd (2014 NYCECC C408.2 Except.). Relocate 4/ delete 2 light fixtures (reduced watts |
| 21 Jun 2022 | General Construction | Signed-off | Minor interior renovation to existing retail space occupied by NORDSTROM. Remove/intall non load bearing partition, flooring and ceiling finishes to creat visual work area. No change in egress, use or occupancy |
| 16 Jun 2022 | General Construction | Signed-off | Interior finishes only. New hung ceiling in some locations. No interior partitions. No change in use, egress or occupancy |
| 14 Jun 2022 | Mechanical Systems | Signed-off | INSTALL HVAC SYSTEM IN EXISTING APARTMENT 118 ON THE 80TH CONSTRUCTION FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 14 Jun 2022 | General Construction | Signed-off | INDTERIOR RENOVATION OF EXISTING APARTMENT 118 ON THE 80TH CONSTRUCTION FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 7 Feb 2022 | Mechanical Systems | Signed-off | EXTEND DUCTWORK FROM EXISTING A/C UNITS THROUGH OUT APARTMENT AND INSTALL NEW EXHAUST FAN AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 12 Jan 2022 | General Construction | Signed-off | MNOR RENOVATION OF INTERIOR OF EXISTING APARTMENT 17A AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 7 Jan 2022 | Protection and Mechanical Methods | Signed-off | USE OF TEMPORARY SUSPENDED SCAFFOLD FROM PERMANENTLY INSTALLED BMU SYSTEM DURING CONSTRUCTION OPERATIONS. TEMPORARY SUSPENDED SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 28 Dec 2021 | Plumbing | Signed-off | PLUMBING FIXTURES IN APT 34C. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 15 Dec 2021 | General Construction | Signed-off | INTERIOR RENOVATION TO EXISTING APARTMENT#35C ON THE 35 FLOOR. MINOR PARTITIONS WORK, MOFIFY REFLECTED CEILING , ALL AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY |
| 6 Dec 2021 | General Construction | Signed-off | INTERIOR RENOVATION IN APT 34C. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 22 Nov 2021 | Sprinklers | Signed-off | Hoist Removal) Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application |
| 21 Oct 2021 | Mechanical Systems | Signed-off | Hoist Removal) Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application |
Showing the 50 most recent of 132. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 5 days ago. Coverage on this parcel: 14 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.