Searching…

157 West 57 Street

Manhattan · Parcel 1010107506
132
Residential units
2009
Year built
702,619 sq ft
Building area
15
Open violations
$172,528,666
Assessed value

Analysis

AI-generated Risk: Medium

The building offers large units and clean penalty records, but its over‑built status and lack of a market sale price create moderate risk for investors.

The good

  • average unit size of 3110 sq ft suggests large, potentially high‑value apartments
  • zero enforcement and safety violation penalties indicate no hidden debt from code fines
  • no legal proceedings and not on a tax‑lien list reduce financial risk
  • 225 permits show active maintenance and upgrades

The bad

  • built beyond the residential floor‑area limit (residential FAR limit 10, built FAR 29.51) makes the building over‑built and limits future expansion
  • over‑built status means additional residential space cannot be added
  • 15 open violations, while low per unit, still represent compliance issues to resolve
  • no recorded arms‑length sale means no market price benchmark

Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.

What the numbers say

Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.

Already larger than residential zoning would allow

The building occupies a floor-area ratio of 29.51, against a residential limit of 10.00 — it is over that limit by 19.51. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.

Unresolved conditions on record

15 violations remain open across 132 residential units (about 0.1 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.

Development & zoning

Floor-area ratio

Built29.51
Residential limit10.00
Commercial limit15.00
Community-facility limit15.00

Development headroom (calculated) calculated

Highest permitted ratio15.00
Unused ratio-14.51
Unused buildable area—
Lot area23,808 sq ft

Value & taxes

Assessment

Assessed total$172,528,666
Assessed land$8,378,557
Assessed building$164,150,109
Market value on record$0
Assessed as % of market—

Tax

Tax class2
Taxable assessed$0
Tax rate12.502%
Estimated annual levy—

The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.

Assessed value by year

YearAssessed valueChange
2027$0—
2026$0—
2025$0—
2024$0—
2023$0—

Building & occupancy

Structure

Year built2009
Floors77
Building area702,619 sq ft
Residential area410,464 sq ft
Commercial area20,999 sq ft

Occupancy

OwnershipCondominium
Total units135
Residential units132
Residential Avg unit size3,110 sq ft (calculated)
Commercial Avg unit size7,000 sq ft (calculated)
Building classRM

Neighborhood, risk & energy

Neighborhood & transit

Nearest subway57 St-7 Av (N, Q, R, W) — 0.1 mi
School district2
Police precinct18
Nearest firehouseEngine 23 — 215 W 58th Street

Location risk

Flood zoneMinimal hazard (Zone X)
Hurricane evacuation zoneNot in an evacuation zone

Building compliance

FacadeRepairs required

Energy & emissions

Energy use intensity130.2 kBtu/ft²
Greenhouse-gas emissions9,658 metric tons/yr

Comparable sales

AddressSale datePriceSq ft$/sq ft
100 West 58 Street, 13e2026-09-17$975,000——
157 West 57 Street, 36b2026-08-20$5,416,461——
140 West 58 Street, Pha2026-08-06$1,075,000——
100 West 58 Street, 8e2026-07-02$895,000——
180 W 58 Street, 11a2026-06-29$1,800,000——
100 West 58 Street, 12g2026-06-05$1,320,000——
111 West 57 Street, Ph762026-06-01$41,750,076——
100 West 58th Street, 8h2026-05-14$745,000——

Record activity

Compliance calculated

Open violations15
Open per residential unit0.1 (calculated)
Enforcement penalties$0.00
Safety-violation penaltiesNot available
Total penalties owed$0.00 (calculated)
On tax-lien sale listNo

Activity

Complaints recorded132
Permits / alterations225
Recorded documents1
Legal proceedings0

Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.

Ownership & last recorded sale

Owner of record

OwnerUnavailable Owner
Parcel1010107506
Block1010
Lot7506

Last recorded transfer

Date—
Recorded price—
Price per unitNot meaningful
Price vs assessedNot meaningful

Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.

Open violations

Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.

IssuedCategoryClassStatusAmount dueDescription
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
29 Oct 2026BuildingElevatorsActive—Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction

Complaints

A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.

DateProblemTypeStatusClosed
26 Oct 2026Driver Complaint - PassengerTaxi ComplaintIn Progress—
25 Oct 2026Bag/WalletLost PropertyClosed28 Oct 2026
25 Oct 2026Parking Permit Improper UseIllegal ParkingClosed25 Oct 2026
20 Oct 2026Private Garbage TruckNoiseIn Progress—
1 Oct 2026Facility MaintenanceBeach/Pool/Sauna ComplaintIn Progress—
11 Aug 2026Use OutsideDrug ActivityClosed11 Aug 2026
12 Jul 2026No AccessBlocked DrivewayClosed13 Jul 2026
3 Jul 2026TrashDirty ConditionClosed5 Jul 2026
25 Jun 2026BASIN/SINKPLUMBINGClosed30 Jun 2026
25 Jun 2026FLOORFLOORING/STAIRSClosed30 Jun 2026
12 Jun 2026With License PlateAbandoned VehicleClosed12 Jun 2026
3 Jun 2026License Plate ObscuredIllegal ParkingClosed3 Jun 2026
31 May 2026Driver Complaint - PassengerTaxi ComplaintIn Progress—
23 May 2026Posted Parking Sign ViolationIllegal ParkingClosed23 May 2026
17 May 2026Double Parked Blocking VehicleIllegal ParkingClosed17 May 2026
10 May 2026Partial AccessBlocked DrivewayClosed10 May 2026
5 Apr 2026Driver Complaint - PassengerTaxi ComplaintClosed3 Sep 2026
9 Mar 2026Driver ComplimentTaxi ComplimentClosed26 Mar 2026
18 Feb 2026Hotel or MotelConsumer ComplaintClosed19 Feb 2026
19 Jan 2026Driver Complaint - Non PassengerFor Hire Vehicle ComplaintClosed30 Jul 2026
15 Jan 2026Posted Parking Sign ViolationIllegal ParkingClosed15 Jan 2026
14 Dec 2025No AccessBlocked DrivewayClosed14 Dec 2025
8 Dec 2025Driver Complaint - PassengerTaxi ComplaintClosed22 Sep 2026
6 Dec 2025No AccessBlocked DrivewayClosed6 Dec 2025
27 Nov 2025No AccessBlocked DrivewayClosed27 Nov 2025
12 Nov 2025Partial AccessBlocked DrivewayClosed12 Nov 2025
26 Oct 2025Posted Parking Sign ViolationIllegal ParkingClosed26 Oct 2025
8 Oct 2025Noise: air condition/ventilation equipment (NV1NoiseClosed29 Oct 2025
4 Oct 2025Parking Permit Improper UseIllegal ParkingClosed4 Oct 2025
17 Sep 2025After Hours Work - IllegalEmergency Response Team (ERTClosed29 Sep 2025
15 Sep 2025Noise: air condition/ventilation equipment (NV1NoiseClosed8 Oct 2025
9 Sep 2025Catch Basin Search (SC2SewerClosed9 Sep 2025
16 Aug 2025Noise: air condition/ventilation equipment (NV1NoiseClosed24 Sep 2025
22 Jul 2025Food VendorVendor EnforcementClosed22 Jul 2025
19 Jul 2025Noise: air condition/ventilation equipment (NV1NoiseClosed5 Aug 2025
16 Jul 2025Noise: Construction Equipment (NC1NoiseClosed17 Jul 2025
16 Jul 2025Noise: air condition/ventilation equipment (NV1NoiseClosed18 Jul 2025
16 Jul 2025Noise: air condition/ventilation equipment (NV1NoiseClosed18 Jul 2025
14 Jul 2025Boiler - Defective/Inoperative/No PermitBoilersClosed14 Jul 2025
18 Jun 2025No AccessBlocked DrivewayClosed18 Jun 2025
18 Jun 2025Parking Permit Improper UseIllegal ParkingClosed18 Jun 2025
8 Jun 2025Parking Permit Improper UseIllegal ParkingClosed8 Jun 2025
8 Jun 2025Parking Permit Improper UseIllegal ParkingClosed8 Jun 2025
1 Apr 2025Driver Complaint - PassengerTaxi ComplaintClosed30 May 2025
2 Mar 2025Parking Permit Improper UseIllegal ParkingClosed2 Mar 2025
20 Feb 2025Banging/PoundingNoise - ResidentialClosed21 Feb 2025
18 Feb 2025Banging/PoundingNoise - ResidentialClosed19 Feb 2025
18 Feb 2025Banging/PoundingNoise - ResidentialClosed18 Feb 2025
20 Jan 2025Work Without A Permit - Occupied Multiple DwellingReal Time EnforcementClosed21 Jan 2025
23 Dec 2024Driver Complaint - PassengerFor Hire Vehicle ComplaintClosed20 Mar 2025

Showing the 50 most recent of 132. The full set is available in the interactive report.

Permits & alterations

The absence of a permit does not prove no work was done — it may equally mean work was done without one.

IssuedTypeStatusWork
26 Jun 2025Sidewalk ShedSigned-offInstallation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
26 Jun 2025Supported ScaffoldSigned-offInstallation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
22 Jan 2025General ConstructionSigned-offDEMO OF THE 20TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS
22 Jan 2025Mechanical SystemsSigned-offDUCTWORK THROUGHOUT SPA AREA FILED IN CONJUNCTION WITH Building NOW GC, PL AND SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS
21 Jan 2025General ConstructionSigned-offRENOVATION OF THE SPA ON THE 20TH FLOOR (25TH FLOOR MARKETING). NO CHANGE TO USE, OCCUPANCY OR EGRESS
11 Sep 2024SprinklersSigned-offPL/SP WORK OF SPA AREA FILED IN CONJUNCTION WITH Building NOW GC. AND MH NO CHANGE TO USE, OCCUPANCY OR EGRESS
10 Sep 2024Sidewalk ShedSigned-offInstallation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
6 Sep 2024Protection and Mechanical MethodsSigned-offINSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022
2 Aug 2024Protection and Mechanical MethodsSigned-offUse of suspended scaffold from building maintenance unit (BMU), as per plans filed herewith
30 Jul 2024General ConstructionSigned-offWINDOW REPLACEMENT ON THE 20TH FL AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
7 Jun 2024General ConstructionSigned-offINTERIOR RENOVATION ON THE 4TH FLOOR SUITE 4112
5 Jun 2024Mechanical SystemsSigned-offMH WORK ON THE 4TH FLOOR (8th floor marketing) FILED IN CONJUNCTION WITH Building NOW GC AND PL/SP . NO CHANGE TO USE, OCCUPANCY OR EGRESS
28 May 2024Mechanical SystemsSigned-offMH WORK FILED IN CONJUNCTION WITH Building NOW GC, AND PL/SP. NO CHANGE TO USE, OCCUPANCY OR EGRESS
23 May 2024PlumbingSigned-offPLUMBING AND SPRINKLER WORK ON THE 4TH FLOOR (8TH FLOOR MARKETING) FILED IN CONJUNCTION WITH Building NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS
21 May 2024PlumbingSigned-offPLUMBING/SPRINKLER WORK ON THE 20TH FLOOR (25TH FLOOR MARKETING) FILED IN CONJUNCTION WITH Building NOW GC WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
21 May 2024General ConstructionSigned-offINTERIOR RENOVATION ON THE 4TH FLOOR (8TH FLOOR MARKETING) . NO CHANGE TO USE, OCCUPANCY OR EGRESS
9 Apr 2024General ConstructionSigned-offFIT OUT- INTERIOR RENOVATION OF THE 20TH FLOOR FILED IN CONJUNCTION WITH Building NOW PL SP AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS
27 Mar 2024PlumbingSigned-offHEREBY FILING FOR THE INSTALLATION OF GAS FIREPLACES ON 6TH, 8TH, 10TH, 12TH, AND 14TH FLOOR. GC FILED UNDER APPLICATION M08045883. NO CHANGE IN USE, EGRESS OR OCCUPANCY
25 Mar 2024General ConstructionSigned-offHEREBY FILING FOR THE INSTALLATION OF GAS FIREPLACES ON 6TH, 8TH, 10TH, 12TH, AND 14TH FLOOR. FILED IN CONJUNCTION WITH PL APPLICATION M08017138. NO CHANGE IN USE, EGRESS OR OCCUPANCY
11 Mar 2024General ConstructionSigned-offDEMO WORK ON THE 20TH FLOOR INCLUDING TEMPORARY LIGHTING. NO CHANGE TO USE, OCCUPANCY OR EGRESS
31 Oct 2023General ConstructionSigned-offconvert existing closet to sauna. Install heater in new sauna No change to use, egress or occupancy under this application. Plumbing and sprinkler work done under 122127974
18 Sep 2023Mechanical SystemsSigned-offMODIFY EXISTING HVAC SYSTEM IN UNIT 77 ON THE 67TH CONSTRUCTION FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS
21 Jun 2023Protection and Mechanical MethodsSigned-offUse of suspended scaffold from building maintenance unit (BMU), as per plans filed herewith
25 May 2022General ConstructionSigned-offPartial renovation of apartment 87 on the 69th Floor (87th Marketing Floor). Work includes removal of two non-structural interior partitions and finishes. No change in use, egress, or occupancy
10 May 2022General ConstructionSigned-offMINOR INTERIOR RENOVATION FOR APARTMENT DROPPED CEILING
2 May 2022General ConstructionSigned-offRenovation of existing Unit 48C located on the 38th Floor. Work to include removal of non-load bearing partition in kitchen and hall, removal of closet millwork, installation of new pendany and recessed lights. No change in use, egress, or occupancy
22 Mar 2022General ConstructionSigned-offINTERIOR RENOVATION OF EXISTING UNIT 66B AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS
1 Mar 2022General ConstructionSigned-offINTERIOR RENOVATIONS OF EXISTING RESIDENTIAL UNIT 56B AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
24 Nov 2021SprinklersSigned-offMODIFY EXISTING SPRINKLER LAYOUT IN APARTMENT 66B ON THE 56TH CONSTRUCTION FLOOR AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS
15 Jul 2021SprinklersSigned-offAddition & Modification to an existing Sprinkler System on first floor
25 May 2021General ConstructionSigned-offDemolition of interior non-load bearing partitions, floor and ceiling finishes and display fixtures. No change to building bulk, floor area, egress, use or occupancy
25 May 2021Mechanical SystemsSigned-offExisting mechanical ductwork, piping, supports, and accessories to be demolished. No change to building bulk, floor area, egress, use or occupancy
24 May 2021PlumbingSigned-offDemolition of existing plumbing fixtures and piping to be capped and removed. No change to building bulk, floor area, egress, use or occupancy
6 May 2021General ConstructionSigned-offApplication is filed for the minor interior renovation of the duplex apartment as shown on plans filed herewith. No change of use, egress or occupancy
6 May 2021PlumbingSigned-offMinor PL and SPR work associated with duplex apt.75/76 renovation. PL scope incl. relocation of 3 LAV, 1 SINK, and a new TUB. SPR scope incl. relocation of 13 SPR heads on 58FL, 14 - on 59FL; 1 new SPR head on 59FL. No change of use, egress, or occupancy
30 Nov 2020A2ISSUED—
14 Jul 2020Mechanical SystemsSigned-offALTER EXISTING MECHANICAL SYSTEM ON THE 67TH FLOOR (PH77) AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
20 Dec 2018A2ISSUED—
23 Nov 2018A2ISSUED—
16 Nov 2018A2ISSUED—
25 Oct 2018A2ISSUED—
1 Dec 2017A2ISSUED—
16 Oct 2017A2ISSUED—
28 Dec 2016A2ISSUED—
20 Dec 2016A2ISSUED—
14 Dec 2016A2ISSUED—
17 Oct 2016NBISSUED—
7 Dec 2015A2ISSUED—
30 Nov 2015A2ISSUED—
4 Nov 2015A2ISSUED—

Showing the 50 most recent of 150. The full set is available in the interactive report.

Recorded documents

Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.

RecordedTypeAmountFromTo
9 Oct 2014Agreement———

About this page

Compiled from New York City public records — data retrieved 21 days ago. Coverage on this parcel: 14 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.

This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.