553 West 30 Street
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 10.29, against a residential limit of 10.00 — it is over that limit by 0.29. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
Unresolved conditions on record
32 violations remain open across 392 residential units (about 0.1 per apartment), against an outstanding penalty balance of $0.00. A significant open count with little money attached usually means habitability items that were never certified as corrected, rather than a few expensive enforcement actions — an administrative problem more than a financial one, though it is still a problem.
Development & zoning
Floor-area ratio
| Built | 10.29 |
|---|---|
| Residential limit | 10.00 |
| Commercial limit | 10.00 |
| Community-facility limit | 10.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 10.00 |
|---|---|
| Unused ratio | -0.29 |
| Unused buildable area | — |
| Lot area | 81,408 sq ft |
Value & taxes
Assessment
| Assessed total | $223,965,914 |
|---|---|
| Assessed land | $26,378,560 |
| Assessed building | $197,587,354 |
| Market value on record | $0 |
| Assessed as % of market | — |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $0 |
| Tax rate | 12.502% |
| Estimated annual levy | — |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $0 | — |
| 2026 | $0 | — |
| 2025 | $0 | — |
| 2024 | $0 | — |
| 2023 | $0 | — |
Building & occupancy
Structure
| Year built | 2015 |
|---|---|
| Floors | 70 |
| Building area | 837,736 sq ft |
| Residential area | 638,486 sq ft |
| Commercial area | 199,250 sq ft |
Occupancy
| Ownership | Condominium |
|---|---|
| Total units | 395 |
| Residential units | 392 |
| Rent-stabilized | 107 |
| Free Market / Other | 285 |
| Residential Avg unit size | 1,629 sq ft (calculated) |
| Commercial Avg unit size | 66,417 sq ft (calculated) |
| Building class | RM |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | 34 St-Hudson Yards (7) — 0.19 mi |
|---|---|
| School district | 2 |
| Police precinct | 10 |
| Nearest firehouse | Engine 34/Ladder 21 — 440 West 38th Street |
Location risk
| Flood zone | Minimal hazard (Zone X) |
|---|---|
| Hurricane evacuation zone | Zone 4 |
| Projected floodplain | In the projected 2050s floodplain |
| Environmental restriction | Hazardous materials, noise |
| Cleanup site | Environmental cleanup site (completed) |
| City emergency repairs | 1 orders — $295 billed (through 2021) |
| Evictions on record | 8 (most recent 2024) |
Building compliance
| Facade | Repairs required |
|---|
Energy & emissions
| Energy grade | B |
|---|---|
| Energy use intensity | 132.4 kBtu/ft² |
| Greenhouse-gas emissions | 8,406 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 35 Hudson Yards, 5702 | 2026-06-17 | $4,300,000 | — | — |
| 553 West 30 Street, 65b | 2026-06-02 | $5,600,000 | — | — |
| 553 West 30 Street, 67f | 2026-06-02 | $3,860,000 | — | — |
| 35 Hudson Yards, 7701 | 2026-05-29 | $7,525,000 | — | — |
| 35 Hudson Yards, 7801 | 2026-05-26 | $7,700,000 | — | — |
| 553 West 30th Street, 72c | 2026-05-19 | $2,700,000 | — | — |
| 35 Hudson Yards, 7901 | 2026-04-20 | $8,600,000 | — | — |
| 553 West 30 Street, 64d | 2026-03-27 | $4,250,000 | — | — |
Record activity
Compliance calculated
| Open violations | 32 |
|---|---|
| Open per residential unit | 0.1 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $30,000.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 515 |
|---|---|
| Permits / alterations | 92 |
| Recorded documents | 0 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | Unavailable Owner |
|---|---|
| Parcel | 1007027502 |
| Block | 702 |
| Lot | 7502 |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Report |
| 11 Sep 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Report |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 23 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction |
| 2 Oct 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2018 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2019 Cat1 Test Report |
| 11 Aug 2023 | Building | Elevators | Active | — | Violation Issued-Failure To File 2020 Cat1 Test Report |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 24 Jul 2026 | Loud Music/Party | Noise - Commercial | Closed | 24 Jul 2026 |
| 23 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 23 Jul 2026 |
| 23 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 23 Jul 2026 |
| 17 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 17 Jul 2026 |
| 16 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 17 Jul 2026 |
| 15 Jul 2026 | Food Vendor | Vendor Enforcement | Closed | 15 Jul 2026 |
| 14 Jul 2026 | Food Vendor | Vendor Enforcement | Closed | 14 Jul 2026 |
| 14 Jul 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 14 Jul 2026 |
| 14 Jul 2026 | Blocked Hydrant | Illegal Parking | Closed | 14 Jul 2026 |
| 13 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 13 Jul 2026 |
| 12 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 12 Jul 2026 |
| 11 Jul 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 12 Jul 2026 |
| 9 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 9 Jul 2026 |
| 5 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 6 Jul 2026 |
| 5 Jul 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 6 Jul 2026 |
| 5 Jul 2026 | Blocked Hydrant | Illegal Parking | Closed | 6 Jul 2026 |
| 5 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 6 Jul 2026 |
| 5 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 5 Jul 2026 |
| 28 Jun 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 28 Jun 2026 |
| 27 Jun 2026 | Loud Music/Party | Noise - Residential | Closed | 27 Jun 2026 |
| 19 Jun 2026 | Driver Complaint - Non Passenger | For Hire Vehicle Complaint | In Progress | — |
| 30 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 30 May 2026 |
| 28 May 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 28 May 2026 |
| 22 May 2026 | Removal Request | Illegal Dumping | Closed | 26 May 2026 |
| 13 May 2026 | Noise: Construction Equipment (NC1 | Noise | Closed | 14 May 2026 |
| 18 Apr 2026 | Other/Unknown | Street Sign - Damaged | Closed | 29 Apr 2026 |
| 13 Apr 2026 | N/A | Encampment | Closed | 13 Apr 2026 |
| 11 Apr 2026 | Banging/Pounding | Noise - Residential | Closed | 11 Apr 2026 |
| 6 Apr 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 6 Apr 2026 |
| 28 Mar 2026 | Other/Unknown | Street Sign - Damaged | Closed | 29 Apr 2026 |
| 25 Mar 2026 | Loud Music/Party | Noise - Commercial | Closed | 26 Mar 2026 |
| 25 Mar 2026 | Loud Music/Party | Noise - Commercial | Closed | 25 Mar 2026 |
| 17 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 17 Mar 2026 |
| 16 Mar 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 16 Mar 2026 |
| 13 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 13 Mar 2026 |
| 9 Mar 2026 | Hydrant Running (WC3 | Water System | Closed | 9 Mar 2026 |
| 8 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 9 Mar 2026 |
| 8 Mar 2026 | Cone | Obstruction | Closed | 9 Mar 2026 |
| 8 Mar 2026 | Hydrant Leaking (WC1 | Water System | Closed | 9 Mar 2026 |
| 6 Mar 2026 | Loud Music/Party | Noise - Commercial | Closed | 6 Mar 2026 |
| 4 Mar 2026 | Loud Music/Party | Noise - Commercial | Closed | 4 Mar 2026 |
| 3 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 3 Mar 2026 |
| 3 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 3 Mar 2026 |
| 2 Mar 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 2 Mar 2026 |
| 2 Mar 2026 | Loud Music/Party | Noise - Commercial | Closed | 2 Mar 2026 |
| 25 Feb 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 25 Feb 2026 |
| 24 Feb 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 24 Feb 2026 |
| 21 Feb 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 21 Feb 2026 |
| 21 Feb 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 21 Feb 2026 |
| 5 Feb 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 5 Feb 2026 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 15 Jun 2026 | General Construction | Permit Issued | APPLICATION HEREWITH FILED FOR INTERIOR RENOVATION TO EXISTING CLASS A APARTMENT 64E ON THE 41st FLOOR OF AN EXISTING MIXED USE BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 28 May 2026 | General Construction | Permit Issued | APPLICATION HEREWITH FILED FOR INTERIOR RENOVATION TO EXISTING CLASS A APARTMENT 86C ON THE 63rd FLOOR OF AN EXISTING MIXED USE BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 2 Dec 2025 | General Construction | Signed-off | APPLICATION HEREWITH FILED FOR INTERIOR RENOVATION TO EXISTING CLASS A APARTMENT 84C ON THE 61st FLOOR OF AN EXISTING MIXED USE BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 27 Aug 2025 | General Construction | Permit Issued | APPLICATION HEREWITH FILED TO INTERIOR RENOVATION OF EXISTING CLASS A APARTMENT 75E ON THE 52nd FLOOR OF AN EXISTING MULTIPLE DWELLING BUILDING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 21 Jul 2025 | General Construction | Signed-off | INTERIOR RENOVATION OF APARTMENT UNIT 85B OF AN EXISTING RESIDENTIAL BUILDING. ARCHITECTURAL WORK. NO CHANGE TO USE, OCCUPANCY, OR EGRESS |
| 22 Apr 2025 | General Construction | Permit Issued | Temporary structures for for Frieze Art Fair in the Shed. Removed at the end of the programing. No changes to existing structures, use or egress |
| 4 Nov 2024 | General Construction | Signed-off | Temporary art structures for the Luna Luna exhibition. Removed at the end of the programing. No changes to existing structures, use or egress |
| 17 Oct 2024 | General Construction | Signed-off | Renovations to existing apartment 66E as per plans. Modifications to closets in bedrooms, new dropped ceiling and miscellaneous finishes. No change in use, egrress or occupancy |
| 4 Jan 2024 | General Construction | Signed-off | Interior renovation of APT 82B (59th floor) to include drop ceiling in existing great room & bedrooms. Minor alterations to sprinkler and plumbing work to be filed in separate LAAs. No change in use, egress, or occupancy |
| 8 Nov 2023 | General Construction | Permit Issued | Interior renovation of existing master bathroom and powder room. No change in use, egress or occupancy |
| 14 Jun 2023 | General Construction | Signed-off | Application being filed to show the small interior renovation of Unit 71D. Work to include removal of interior doors, demolition of the ceiling, and the top layer of the wall tiles. Also includes lighting upgrade. No change in use, egress, or occupancy |
| 2 Jun 2023 | General Construction | Permit Issued | Temporary structures for the Sonic Sphere project within the The Shed. All structures removed after the programming. No changes to existing structures, use or egress |
| 3 May 2023 | General Construction | Signed-off | Drop ceiling at existing great room, master bedroom and bedroom #2 of apartment 65E, relocate wall mounted sprinkler heads in great room and master bedroom (to be filed in a separate LAA). No changes in use, egress or occupancy |
| 8 Mar 2023 | Plumbing | Signed-off | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 80A ON THE 57TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 31 Aug 2022 | General Construction | Signed-off | Application being filed for the renovation of unit 78E on the 55th floor. Work to include dropping of the ceilings in the living/dining room, master bedroom, office, and guest bedroom. No Plumbing work. No change in use, egress, or occupancy |
| 22 Jul 2022 | General Construction | Signed-off | Remove walk in closet at master bedroom at existing apartment 24F |
| 11 Jul 2022 | General Construction | Signed-off | Application being filed for the interior renovation of apartment 67E on the 67th Floor. Work to include lowering of ceilings in the bedrooms and addition of miscellaneous lighting in the living room and bedroom. No change in use,egress, or occupancy |
| 29 Jun 2022 | General Construction | Signed-off | GENERAL CONSTRUCTION WORK ASSOCIATED WITH THE RENOVATION OF EXISTING APARTMENT 83A. THERE IS NO EXTERIOR WORK PROPOSED WHATSOEVER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 29 Jun 2022 | Plumbing | Signed-off | Plumbing work associated with the renovation of an existing bathroom in apartment 83A |
| 12 May 2022 | General Construction | Signed-off | Drop ceiling in existing great room, master bedroom, bedroom #2, bedroom #3 and bedroom #4 of apartment 84A, relocate wall mounted sprinkler heads throughout (to be filed in a separate LAA).-No change in use, egress, or occupancy |
| 6 May 2022 | General Construction | Signed-off | Temporary structures for Frieze New York 2021No changes to existing structures, use or egress |
| 5 May 2022 | General Construction | Signed-off | Interior renovation of existing apartment # 86A, including installation of a drop ceiling and lighting fixtures in great room. As per plans filed herewith, No change to use occupancy or egress |
| 5 Apr 2022 | General Construction | Signed-off | INTERIOR RENOVATION OF APARTMENT 80A ON THE 57TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 30 Mar 2022 | General Construction | Signed-off | Interior renovation as shown on plans filed herewith |
| 21 Feb 2022 | General Construction | Signed-off | REMOVE 2 CLOSET AND INSTALL NEW COUNTER TOP OF EXISTING RESIDENTIAL SPACE IN APT 70E. PARTITION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY |
| 3 Feb 2022 | Structural | Signed-off | TEMPORARY STRUCTURES IN THE MCCOURT FORTHE SARACENO EXHIBIT. REMOVED AT THE END OF THE EXHIBIT.NO CHANGE TO THE EXISTING USE, EXITS, OR EGRESS |
| 22 Dec 2021 | General Construction | Signed-off | MINOR INTERIOR RENOVATION OF APARTMENT 26H THAT WILL CONSIST OF A DROPPED CEILING IN THE MASTER BEDROOM AND GREAT ROOM. AS PER PLANS FILE HEREWITH NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 16 Dec 2021 | Supported Scaffold | Signed-off | INSTALLATION OF A TEMPORARY SCAFFOLD ACCESS STAIR TOWER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD ACCESS STAIR TOWER SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33 |
| 3 Dec 2021 | General Construction | Signed-off | Application being filed for a small renovation of Unit PH84D on the 84th Floor. Work to include dropping the ceilings in the living room, master BR, and office. Also removing wall to install glass pocket door. No change in use, egress, or occupancy |
| 10 Nov 2021 | A3 | ISSUED | — |
| 31 Mar 2021 | General Construction | Signed-off | Temporary structures for The Shed programming. No changes to existing structures, use or egress |
| 13 Oct 2020 | A2 | ISSUED | — |
| 6 Oct 2020 | A3 | ISSUED | — |
| 23 Sep 2020 | Sprinklers | Signed-off | Relocation of 12 sprinkler heads, installation of 1 new sprinkler head, 50 sprinkler heads existing to remain, removal of 1 sprinkler head. As per plans filed herewith. No change to use occupancy or egress |
| 14 Sep 2020 | A2 | ISSUED | — |
| 4 Sep 2020 | A3 | ISSUED | — |
| 20 Aug 2020 | Supported Scaffold | Signed-off | INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 27 Jul 2020 | A2 | ISSUED | — |
| 22 Jul 2020 | A2 | ISSUED | — |
| 13 Jul 2020 | A2 | ISSUED | — |
| 26 Jun 2020 | Plumbing | Signed-off | APARTMENT 66B - 43 FLOOR CO DESIGNATION/66TH FLOOR MARKETING FLOOR DESIGNATION THAT WILL INCLUDE THE INSTALLATION OF LAV |
| 19 Jun 2020 | Plumbing | Signed-off | APARTMENT 67B - 44ST FLOOR CO DESIGNATION/67TH FLOOR MARKETING FLOOR DESIGNATION THAT WILL INCLUDE THE INSTALLATION OF LAV |
| 18 Jun 2020 | A2 | ISSUED | — |
| 17 Jun 2020 | Mechanical Systems | Signed-off | File herewith for extension of duct work in conjunction with combination of existing apartments 82A & 82D as per plans filed herewith. No change to use, egress, or occupancy |
| 15 Jun 2020 | Plumbing | Signed-off | File for renovation of existing bathrooms in conjunction with combination of existing apartments 82A & 82D, as per plans filed herewith. No change to use, egress, or occupancy |
| 22 Jan 2020 | Construction Fence | Signed-off | INSTALLATION OF TEMPORARY FENCE AS PER DRAWINGS. TEMPORARY FENCE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 30 Dec 2019 | NB | ISSUED | — |
| 23 Dec 2019 | Plumbing | Signed-off | HEREBY FILING APPLICATION FOR THE INTERIOR RENOVATION OF APARTMENT 85-A (PLUMBING WORK). NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 17 Dec 2019 | A2 | ISSUED | — |
| 4 Dec 2019 | A3 | ISSUED | — |
Showing the 50 most recent of 92. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 6 days ago. Coverage on this parcel: 14 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.