Unused development capacity on the lot
Built floor-area ratio is 9.74 against a permitted 10.00, leaving 0.26 of unused ratio — roughly 19,871 sq ft of buildable area on a lot of 76,425 sq ft. Treat that as a ceiling under the floor-area rules, not a plan: height limits, setbacks, lot coverage, landmark status and sitting tenants can each reduce it, in some cases to nothing.
A light open-violation load
Only 6 violations are currently open across 235 residential units, with $3,650.00 outstanding. For a building of this age that is a modest figure.
Development & zoning
Floor-area ratio
| Built | 9.74 |
|---|---|
| Residential limit | 10.00 |
| Commercial limit | 10.00 |
| Community-facility limit | 10.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 10.00 |
|---|---|
| Unused ratio | 0.26 |
| Unused buildable area | 19,871 sq ft |
| Lot area | 76,425 sq ft |
Value & taxes
Assessment
| Assessed total | $151,270,662 |
|---|---|
| Assessed land | $6,666,305 |
| Assessed building | $144,604,357 |
| Market value on record | $0 |
| Assessed as % of market | — |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $0 |
| Tax rate | 12.502% |
| Estimated annual levy | — |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $0 | — |
| 2026 | $0 | — |
| 2025 | $0 | — |
Building & occupancy
Structure
| Year built | 2017 |
|---|---|
| Floors | 36 |
| Building area | 744,344 sq ft |
| Residential area | 506,173 sq ft |
| Commercial area | 63,369 sq ft |
Occupancy
| Ownership | Condominium |
|---|---|
| Total units | 238 |
| Residential units | 235 |
| Residential Avg unit size | 2,154 sq ft (calculated) |
| Commercial Avg unit size | 21,123 sq ft (calculated) |
| Building class | RM |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | 14 St (A, C, E) — 0.4 mi |
|---|---|
| School district | 2 |
| Police precinct | 10 |
| Nearest firehouse | Marine 1 — 20 Rear Bloomfield Street |
Location risk
| Hurricane evacuation zone | Zone 1 |
|---|---|
| Projected floodplain | In the projected 2050s floodplain |
| Environmental restriction | Hazardous materials, noise |
| Cleanup site | Environmental cleanup site (active) |
Energy & emissions
| Energy use intensity | 35.3 kBtu/ft² |
|---|---|
| Greenhouse-gas emissions | 3,512 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 500 West 18th Street, Ph33b | 2026-06-17 | $23,500,000 | — | — |
| 500 West 18th Street, W20c | 2026-06-04 | $9,995,000 | — | — |
| 500 West 18th Street, E12b | 2026-06-03 | $6,940,000 | — | — |
| 500 West 18th Street, E15g | 2026-05-28 | $4,500,000 | — | — |
| 500 West 18th Street, W25a | 2026-05-20 | $11,915,000 | — | — |
| 500 West 18th Street, Ps | 2026-05-04 | $354,900 | — | — |
| 500 West 18th Street, E22d | 2026-04-24 | $5,695,000 | — | — |
| 500 West 18th Street, E23d | 2026-04-16 | $5,700,000 | — | — |
Record activity
Compliance calculated
| Open violations | 6 |
|---|---|
| Open per residential unit | 0.0 (calculated) |
| Enforcement penalties | $3,650.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $3,650.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 94 |
|---|---|
| Permits / alterations | 89 |
| Recorded documents | 0 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | 76 Eleventh Avenue Property Owner LLC |
|---|---|
| Parcel | 1006897501 |
| Block | 689 |
| Lot | 7501 |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 14 Jul 2026 | Enforcement | CLASS - 2 | ACTIVE | $2,400 | AT TIME OF INSPECTION, ONE EXTERIOR FACADE PANEL WAS MISSING AT THE 4TH FLOOR SETBACK ROOF. NO OVERHEAD PROTECTION OR RESTRICTED ACCESS WAS PROVIDED BELOW THE AFFECTED AREA TO SAFEGUARD OCCUPANTS FROM POTENTIAL |
| 31 Oct 2025 | Building | Gas Piping - a local law | Active | — | Cycle 1, Sub-cycle C (premises is in Community District 4 |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Report |
| 7 Aug 2025 | Enforcement | CLASS - 2 | ACTIVE | — | OBSERVED ON FLOORS 4,5, AND 6 NO FIRE PROTECTION SYSTEM, EACH FLOORS ARE PROVIDED WITH ACTIVE STAND PIPE BUT VALVES TO OFFICE SPACES ARE DISCHARGED ,OFF AND CAPPED . MAKING IT A SAFETY HAZARD TO EMPLOYEE'S IN C |
| 31 Jul 2024 | Enforcement | CLASS - 2 | ACTIVE | $1,250 | UPON INSPECTION OBSERVED, AT EXP.2/CORNER OF 10TH AVE. & 18TH ST. A NEW BLACK MONOPOLE (SIGN) STRUCTURE IS ERECTED AND MEASURING APPROX.15FT.(H)X40FT.(W) AND APPROX. 30FT. FROM GRADE. AS PER Building THERE IS NO PER |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 11 Jun 2026 | Loud Music/Party | Noise - Residential | Closed | 12 Jun 2026 |
| 9 Jun 2026 | Street Cleaning - ASP | Street Sign - Missing | Closed | 11 Jun 2026 |
| 9 Jun 2026 | With License Plate | Abandoned Vehicle | Closed | 9 Jun 2026 |
| 28 May 2026 | STAIRS | FLOORING/STAIRS | Closed | 29 May 2026 |
| 28 May 2026 | STAIRS | FLOORING/STAIRS | Closed | 29 May 2026 |
| 28 May 2026 | STAIRS | FLOORING/STAIRS | Closed | 29 May 2026 |
| 28 May 2026 | JANITOR/SUPER | GENERAL | Closed | 27 Jun 2026 |
| 27 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 28 May 2026 |
| 19 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 19 May 2026 |
| 17 May 2026 | Parking Permit Improper Use | Illegal Parking | Closed | 17 May 2026 |
| 17 May 2026 | Driver Complaint - Passenger | Taxi Complaint | In Progress | — |
| 15 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 15 May 2026 |
| 13 May 2026 | Odor | Food Establishment | Closed | 12 Jul 2026 |
| 2 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 2 May 2026 |
| 2 May 2026 | Cone | Obstruction | Closed | 3 May 2026 |
| 2 May 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 2 May 2026 |
| 17 Apr 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 17 Apr 2026 |
| 17 Apr 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 17 Apr 2026 |
| 12 Mar 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 12 Mar 2026 |
| 5 Mar 2026 | Street Cleaning - ASP | Street Sign - Missing | Closed | 19 Mar 2026 |
| 1 Mar 2026 | Loud Music/Party | Noise - Residential | Closed | 1 Mar 2026 |
| 1 Mar 2026 | Loud Music/Party | Noise - Commercial | Closed | 1 Mar 2026 |
| 1 Mar 2026 | Loud Music/Party | Noise - Commercial | Closed | 1 Mar 2026 |
| 1 Mar 2026 | Loud Music/Party | Noise - Residential | Closed | 1 Mar 2026 |
| 13 Feb 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 14 Feb 2026 |
| 13 Feb 2026 | Blocked Hydrant | Illegal Parking | Closed | 13 Feb 2026 |
| 6 Feb 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 6 Feb 2026 |
| 29 Jan 2026 | Loud Talking | Noise - Street/Sidewalk | Closed | 29 Jan 2026 |
| 29 Jan 2026 | Sewer Backup (Use Comments) (SA | Sewer | Closed | 29 Jan 2026 |
| 22 Jan 2026 | No Parking, Standing, Stopping | Street Sign - Damaged | Closed | 22 Jan 2026 |
| 14 Jan 2026 | Partial Access | Blocked Driveway | Closed | 14 Jan 2026 |
| 4 Jan 2026 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 7 Jan 2026 |
| 24 Nov 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 24 Nov 2025 |
| 24 Nov 2025 | After Hours Work - Illegal | Emergency Response Team (ERT | Closed | 25 Nov 2025 |
| 22 Nov 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 22 Nov 2025 |
| 21 Nov 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 21 Nov 2025 |
| 14 Nov 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 14 Nov 2025 |
| 13 Nov 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 13 Nov 2025 |
| 3 Nov 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 3 Nov 2025 |
| 31 Oct 2025 | CSC - Monitoring Tracking | Construction Safety Enforcement | Closed | 31 Oct 2025 |
| 29 Oct 2025 | Paper License Plates | Illegal Parking | Closed | 29 Oct 2025 |
| 28 Oct 2025 | ENTIRE BUILDING | HEAT/HOT WATER | Closed | 30 Oct 2025 |
| 25 Oct 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 25 Oct 2025 |
| 25 Oct 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 25 Oct 2025 |
| 21 Oct 2025 | APARTMENT ONLY | HEAT/HOT WATER | Closed | 22 Oct 2025 |
| 18 Oct 2025 | Loud Music/Party | Noise - Residential | Closed | 19 Oct 2025 |
| 11 Oct 2025 | Posted Parking Sign Violation | Illegal Parking | Closed | 11 Oct 2025 |
| 11 Oct 2025 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 11 Oct 2025 |
| 23 Sep 2025 | Loud Music/Party | Noise - Residential | Closed | 23 Sep 2025 |
| 8 Sep 2025 | Loud Music/Party | Noise - Commercial | Closed | 8 Sep 2025 |
Showing the 50 most recent of 94. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 18 Mar 2026 | Structural | Permit Issued | Slab opening on the 1st floor and reinforcing a section of an existing block wall adjacent to this opening at the cellar level as per plans filed herewith. No change in use, egress or occupancy under this application |
| 6 Mar 2026 | Mechanical Systems | Permit Issued | Addition of a dedicated reclamation room exhaust system as per plans filed herewith. No change in use, egress or occupancy under this application |
| 15 Jan 2026 | General Construction | Permit Issued | INTERIOR ALTERATION OF APARTMENT W31C ON THE 29TH CONSTRUCTION FLOOR/31ST MARKETING FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| 13 Jan 2026 | Sprinklers | Permit Issued | Modifications to existing sprinkler system in apt. #PH-36W, as per plans filed herewith. No change in use, egress or occupancy |
| 19 Dec 2025 | Sprinklers | Permit Issued | SPRINKLER MODIFICATIONS AT EXISTING 31ST FLOOR APT PH31A (PH31A_CO/PH33A_M) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 6 Nov 2025 | General Construction | Permit Issued | DEMOLITION AND RENOVATION TO EXISTING 31ST FLOOR APT PH31A (PH31A_CO/PH33A_M) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 6 Nov 2025 | Mechanical Systems | Permit Issued | MECHANICAL MODIFICATIONS TO INCLUDE DUCTWORK MODIFICATIONS AT EXISTING 31ST FLOOR APT PH31A (PH31A_CO/PH33A_M) AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 1 Oct 2025 | General Construction | Signed-off | Interior partitions & finishes as per plans filed here with to 25th floor units. No change to use, occupancy or egress |
| 30 Sep 2025 | General Construction | Permit Issued | Interior build-out of existing apt #PH-36W, as per plans filed herewith. Work to include minor non-structural demolition, general construction and related finishes. No change in use, egress, or occupancy |
| 30 Sep 2025 | Mechanical Systems | Permit Issued | Modification to mechanical systems in apt PH36W to include rerouting of ductwork, relocation of thermostats, revisions to air terminals, revision to kitchen and bathroom exhaust, revisions to fireplace makeup air ductwork, and new humidification system |
| 11 Sep 2025 | Mechanical Systems | Signed-off | HEREWITH FILING FOR MODIFICATION OF MECHANCIAL DUCTWORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 10 Sep 2025 | Plumbing | Permit Issued | Modifications to existing plumbing system in Apt# PH-36W, as per plans filed herewith. No change in use, egress, or occupancy |
| 21 Jul 2025 | A2 | ISSUED | — |
| 2 Jul 2025 | Plumbing | Signed-off | APPLICATION FILED TO INSTALL ONE DRINKING FOUNTAIN. FILED IN CONJUNCTION WITH NB #121190308 |
| 1 Jul 2025 | General Construction | Permit Issued | Renovation of existing private terrace on the 34th floor. Work to include removal and replacement of existing stone pavers on pedestal system as per plans filed herewith. No change in use, egress or occupation |
| 20 Jun 2025 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY INTERIOR WORK PLATFORM E AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 25 Apr 2025 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY OVERHEAD PROTECTION/ PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE OVHP/PLYWOOD FENCE BY THE NEW STEEL STAIR LOCATION ON THE 18TH STREET ELEVATION. THE FENCE IS ON BOTH SIDES UNDER THE DECKING |
| 22 Apr 2025 | Mechanical Systems | Signed-off | Mechanical work as shown on plans (Penthouse 26/PH 26 |
| 10 Apr 2025 | General Construction | Permit Issued | Interior renovation to existing apartment #6A part of the west tower . work involve remove and construct non bearing partitions . and millwork were required , all as per plan. no change in use egress or occupancy |
| 24 Mar 2025 | Structural | Signed-off | Install new concrete pads under new pergola posts for unit 6E East Terrace |
| 12 Mar 2025 | General Construction | Signed-off | RENOVATION OF UNIT #6E, A DUPLEX ON 4TH AND 5TH FLOORS, WITH WORK ON PRIVATE 5TH FLOOR TERRACE. REMOVAL/INSTALLATION OF NON-LOADBEARING PARTITIONS AND CEILING |
| 27 Feb 2025 | Construction Fence | Signed-off | INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 20 Feb 2025 | General Construction | Signed-off | Removal of interior non-structural wall partitions, doors, ceilings, and related finishes in apt #PH-36W, as per plans filed herewith. No change in use, egress, or occupancy |
| 24 Jan 2025 | Sprinklers | Permit Issued | Modifications to an existing sprinkler system (Penthouse 26 / PH 26 |
| 24 Jan 2025 | Plumbing | Signed-off | MODIFICATION OF PLUMBING FIXTURES IN BATHROOMS & KITCHEN IN UNIT PH32B-W AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 16 Jan 2025 | General Construction | Signed-off | PARTIAL RENOVATION OF EXISITNG UNIT PH32B-W. WORK TO INCLUDE REMOVAL & INSTALLATION OF PARTITIONS & FINISHES AS PER PLANS. NO CHANG IN USE, EGRESS OR OCCUPANCY |
| 13 Dec 2024 | General Construction | Signed-off | General Construction work to include interior renovation of Penthouse 26/PH 26 as shown on plans. No change to use, egress, or occupancy |
| 6 Sep 2024 | Sprinklers | Signed-off | HEREWITH FILING FOR MODIFICATION OF PLUMBING FIXTURES AND SPRINKLER HEADS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 4 Sep 2024 | General Construction | Signed-off | HEREWITH FILING FOR INTERIOR PARTITIONS AND DOORS MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION |
| 29 Aug 2024 | Structural | Signed-off | APPLICATION FILED FOR STRUCTURAL WORK ASSOCIATED WITH CONSTRUCTION OF PLAZA. LANDSCAPE COMPONENTS OF THE PLAZA WERE FILED UNDER ALT 3 #123197593. FILED IN CONJUNCTION WITH NEW BUILDING #121190308. COSTS FOR THIS FILING INCLUDED IN NB COSTS |
| 26 Jul 2024 | Plumbing | Signed-off | Plumbing filed in conjunction to GC for apartment combo of units 29A and 29D on 27th floor. No change in use, occupancy or egress |
| 24 Jul 2024 | General Construction | Signed-off | Interior renovation/combo of units 29A and 29D on the 27th floor on an existing MDL building. Renovation includes apartment combination as per TPPN 3/97 and transferred portion of the common hall. No change in use, occupancy or egress |
| 4 Jun 2024 | General Construction | Signed-off | Interior renovations to apartment 29B including the removal and installation on non-load bearing partitions and related finishes. No change in use, egress or occupancy |
| 25 Apr 2024 | Sidewalk Shed | Signed-off | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY |
| 30 Jan 2024 | Sidewalk Shed | Signed-off | INSTALLATION OF SIDEWALK SHED AND FENCE IN ACCORDANCE WITH NYC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY |
| 26 Jan 2024 | Suspended Scaffold | Signed-off | Facade repair, inspection, installation |
| 24 Jan 2024 | Plumbing | Signed-off | INTERIOR RENOVATION OF EXISTING APT. 15D IN THE EAST TOWER. REMOVAL OF BATHTUB AND REPLACEMENT OF (2) LAVATORIES IN EXISTING BATHROOM #1 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| 19 Jan 2024 | General Construction | Signed-off | Proposed interior alteration to existing dwelling unit 15D in the East Tower. Minor demolition of non-bearing walls, doors and finishes. Installation of new non-bearing walls, finishes and doors. No change to use, egress or occupancy |
| 11 Jan 2024 | General Construction | Signed-off | REMOVAL OF ONE (1) NON-LOAD BEARING PARTITION ANDONE (1) DOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS |
| 31 Aug 2023 | A3 | ISSUED | — |
| 14 Aug 2023 | Boiler Equipment | Signed-off | Installation of four (4) gas boilers on the 26th floor of the East Tower as per plans filed herewith. No change in use, egress or occupancy under this application. Filed in conjunction with New Building # 121190308 |
| 26 Jul 2023 | Construction Fence | Signed-off | Installation of a temporarily heavy-duty sidewalk and construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 8 Jun 2023 | Supported Scaffold | Signed-off | INSTALLATION OF PIPE SCAFFOLDING ON EAST TOWER AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014 |
| 8 Feb 2023 | Supported Scaffold | Signed-off | INSTALLATION OF TEMPORARY PIPE SCAFFOLDING EGRESS STAIR TOWER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIRS SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014 |
| 1 Dec 2022 | Supported Scaffold | Signed-off | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 12 Oct 2022 | Supported Scaffold | Signed-off | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY |
| 19 Aug 2022 | Supported Scaffold | Signed-off | INSTALLATION OF PIPE SCAFFOLDING AROUND EAST AND WEST TOWERS SETBACKS AS PER PLANS DURING CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014 |
| 28 Jul 2022 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF ALTERNATIVE COMMON PLATFORM TIE |
| 13 Apr 2022 | Boiler Equipment | Signed-off | Installation of gas boilers as shown drawings filed herewith. No change in use, egress or occupancy |
| 12 Apr 2022 | A2 | ISSUED | — |
Showing the 50 most recent of 89. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 5 days ago. Coverage on this parcel: 14 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.