17 Battery Place
Analysis
The property’s historic appeal and large units are offset by severe over‑building, significant safety penalties and a high violation count, resulting in a high risk rating.
The good
- Built in 1902, the building has historic character that can command premium rents
- Average unit size of 893 sq ft is large for the market, appealing to families or upscale renters
- Landmarked status can attract tenants seeking a distinctive address
- Assessed value of $118,120,050 reflects substantial equity in the property
The bad
- Residential floor‑area ratio of 18.6 exceeds the 10‑unit limit, meaning the building is over‑built and cannot be expanded
- Total penalties owed of $188,250 (including $182,000 safety violation debt) are material and often missed by buyers
- 102 open violations (0.2 per unit) indicate ongoing compliance issues
- No arm‑length sale and a recorded market value of $0 suggest limited recent transaction data and possible valuation uncertainty
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 18.60, against a residential limit of 10.00 — it is over that limit by 8.60. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
A material outstanding penalty balance
102 open violations carry an outstanding balance of $6,250.00. A balance at this level belongs in the price of any decision about this building. Note that this figure covers enforcement penalties only — it does not include unpaid property tax or water and sewer arrears, which are not shown anywhere on this page and are frequently the larger number.
Development & zoning
Floor-area ratio
| Built | 18.60 |
|---|---|
| Residential limit | 10.00 |
| Commercial limit | 15.00 |
| Community-facility limit | 15.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 15.00 |
|---|---|
| Unused ratio | -3.60 |
| Unused buildable area | — |
| Lot area | 64,633 sq ft |
Landmarked — Individual Landmark + Historic District
| Name | Whitehall Building; Greater Whitehall Building |
|---|---|
| Historic district | Individual Landmark |
| Designated | — |
Landmark status restricts exterior alterations and may require city approval for any work — a real constraint on both cost and timeline.
Value & taxes
Assessment
| Assessed total | $118,120,050 |
|---|---|
| Assessed land | $15,867,000 |
| Assessed building | $102,253,050 |
| Market value on record | $0 |
| Assessed as % of market | — |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $0 |
| Tax rate | 12.502% |
| Estimated annual levy | — |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $0 | — |
| 2026 | $0 | — |
| 2025 | $0 | — |
| 2024 | $0 | — |
| 2023 | $0 | — |
Building & occupancy
Structure
| Year built | 1902 |
|---|---|
| Floors | 31 |
| Building area | 1,202,417 sq ft |
| Residential area | 446,382 sq ft |
| Commercial area | 756,035 sq ft |
Occupancy
| Ownership | Condominium |
|---|---|
| Total units | 623 |
| Residential units | 500 |
| Residential Avg unit size | 893 sq ft (calculated) |
| Commercial Avg unit size | 6,147 sq ft (calculated) |
| Building class | RM |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | Bowling Green (4, 5) — 0.11 mi |
|---|---|
| School district | 2 |
| Police precinct | 1 |
| Nearest firehouse | Engine 10/Ladder 10 — 124 Liberty Street |
Location risk
| Flood zone | High-risk (Zone AE) |
|---|---|
| Hurricane evacuation zone | Zone 1 |
| Projected floodplain | In the projected 2050s floodplain |
| Evictions on record | 8 (most recent 2026) |
Energy & emissions
| Energy grade | B |
|---|---|
| Energy use intensity | 60.8 kBtu/ft² |
| Greenhouse-gas emissions | 8,726 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 20 West Street, 8a | 2026-06-01 | $642,000 | — | — |
| 20 West Street, 41d | 2026-04-24 | $520,000 | — | — |
| 20 West Street, 36e | 2026-03-30 | $580,000 | — | — |
| 20 West Street, 37g | 2026-03-24 | $517,500 | — | — |
| 20 West Street, 27e | 2026-03-16 | $566,000 | — | — |
| 20 West Street, 31c | 2025-12-30 | $565,000 | — | — |
| 20 West Street, 18f | 2025-11-18 | $999,000 | — | — |
| 20 West Street, 35c | 2025-11-14 | $545,000 | — | — |
Record activity
Compliance calculated
| Open violations | 102 |
|---|---|
| Open per residential unit | 0.2 (calculated) |
| Enforcement penalties | $6,250.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $188,250.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 568 |
|---|---|
| Permits / alterations | 260 |
| Recorded documents | 0 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | 17 Battery Place Condominium Board |
|---|---|
| Parcel | 1000157501 |
| Block | 15 |
| Lot | 7501 |
Last recorded transfer
| Date | — |
|---|---|
| Recorded price | — |
| Price per unit | Not meaningful |
| Price vs assessed | Not meaningful |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 15 Jun 2026 | Building | AEUHAZ | Active | — | FTC-AEU-HAZ |
| 15 May 2026 | Building | AEUHAZ | Active | — | FTC-AEU-HAZ |
| 5 May 2026 | Enforcement | CLASS - 1 | ACTIVE | $1,250 | 97/X/17 CLASS 1 RESTORE TO SERVICE FOR PROPER INSPECTION BY Building |
| 26 Mar 2026 | Enforcement | CLASS - 1 | ACTIVE | $5,000 | MISCELLANEOUS CHAPTER 33 VIOLATIONS. I OBSERVED EXCESSIVE CONSTRUCTION DUST THROUGHOUT 3RD FLOOR PRODUCING A HEALTH HAZARD, TPP IS NOT BEING COMPLIED WITH UNDER THE HEALTH REQUIREMENTS SECTION. ANY ENTRANCE DOO |
| 15 Dec 2025 | Building | Boiler | Active | — | Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction |
| 10 Oct 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction |
| 29 Aug 2025 | Building | Elevators | Active | — | Violation Issued-Failure To File 2024 Cat1 Test Report |
| 31 Dec 2024 | Building | Parking Structures | Active | — | Unsafe report of parking structures filed |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
| 11 Oct 2024 | Building | Elevators | Active | — | Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction |
Showing the 50 most recent of 102. The full set is available in the interactive report.
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 7 Aug 2026 | MOLD | UNSANITARY CONDITION | Open | — |
| 27 Jul 2026 | Congestion/Gridlock | Traffic | Closed | 27 Jul 2026 |
| 22 Jul 2026 | Loud Talking | Noise - Residential | Closed | 23 Jul 2026 |
| 22 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 22 Jul 2026 |
| 15 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 15 Jul 2026 |
| 12 Jul 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 12 Jul 2026 |
| 31 May 2026 | Ticket Seller | Consumer Complaint | Closed | 1 Jun 2026 |
| 29 May 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 9 Jun 2026 |
| 29 May 2026 | Noise: Construction Equipment (NC1 | Noise | Closed | 11 Jun 2026 |
| 24 May 2026 | Noise: Boat(Engine,Music,Etc) (NR10 | Noise | Closed | 26 May 2026 |
| 21 May 2026 | Unauthorized Bus Layover | Illegal Parking | Closed | 21 May 2026 |
| 17 May 2026 | Elevator - Single Device On Property/No Alternate Service | Elevator | Closed | 2 Jul 2026 |
| 17 May 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 17 May 2026 |
| 14 May 2026 | Car/Truck Horn | Noise - Vehicle | Closed | 15 May 2026 |
| 14 May 2026 | Car/Truck Horn | Noise - Vehicle | Closed | 15 May 2026 |
| 13 May 2026 | Food Vendor | Vendor Enforcement | Closed | 13 May 2026 |
| 8 May 2026 | Debt Collection Agency | Consumer Complaint | Closed | 10 Jun 2026 |
| 7 May 2026 | Loud Talking | Noise - Street/Sidewalk | Closed | 7 May 2026 |
| 6 May 2026 | Noise: Construction Equipment (NC1 | Noise | Closed | 18 May 2026 |
| 4 May 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 5 May 2026 |
| 25 Apr 2026 | Graffiti | Graffiti | Closed | 30 Apr 2026 |
| 20 Apr 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 1 May 2026 |
| 19 Apr 2026 | Noise: Jack Hammering (NC2 | Noise | Closed | 26 Apr 2026 |
| 19 Apr 2026 | Engine Idling | Noise - Vehicle | Closed | 19 Apr 2026 |
| 18 Apr 2026 | Elevator - Single Device On Property/No Alternate Service | Elevator | Closed | 7 May 2026 |
| 17 Apr 2026 | Bag/Wallet | Lost Property | Closed | 21 Apr 2026 |
| 16 Apr 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 16 Apr 2026 |
| 14 Apr 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 14 Apr 2026 |
| 5 Apr 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 12 Apr 2026 |
| 4 Apr 2026 | License Plate Obscured | Illegal Parking | Closed | 4 Apr 2026 |
| 31 Mar 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 31 Mar 2026 |
| 30 Mar 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 3 Apr 2026 |
| 30 Mar 2026 | Loud Talking | Noise - Street/Sidewalk | Closed | 30 Mar 2026 |
| 24 Mar 2026 | Elevator - Multiple Devices On Property | Elevator | Closed | 17 Apr 2026 |
| 23 Mar 2026 | Engine Idling | Noise - Vehicle | Closed | 23 Mar 2026 |
| 22 Mar 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 25 Mar 2026 |
| 17 Mar 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 17 Mar 2026 |
| 11 Mar 2026 | Loud Music/Party | Noise - Street/Sidewalk | Closed | 11 Mar 2026 |
| 9 Mar 2026 | After Hours Work - Illegal | Emergency Response Team (ERT | Closed | 24 Mar 2026 |
| 8 Mar 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 15 Mar 2026 |
| 8 Mar 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 11 Mar 2026 |
| 8 Mar 2026 | Loud Music/Party | Noise - Residential | Closed | 8 Mar 2026 |
| 22 Feb 2026 | N/A | Panhandling | Closed | 22 Feb 2026 |
| 19 Feb 2026 | Non-Food Vendor | Vendor Enforcement | Closed | 19 Feb 2026 |
| 19 Feb 2026 | Loud Talking | Noise - Street/Sidewalk | Closed | 19 Feb 2026 |
| 19 Feb 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 26 Feb 2026 |
| 18 Feb 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 20 Feb 2026 |
| 11 Feb 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 25 Feb 2026 |
| 8 Feb 2026 | PESTS | UNSANITARY CONDITION | Closed | 8 Jun 2026 |
| 7 Feb 2026 | Noise: Construction Before/After Hours (NM1 | Noise | Closed | 10 Feb 2026 |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 21 May 2025 | Plumbing | Signed-off | Selective plumbing demolition work as per plans filed herewith. No change in occupancy, use or egress |
| 3 Feb 2025 | Mechanical Systems | Permit Issued | MECHANICAL WORK RELATED TO OFFICE RENOVATION FILED IN CONJUNCTION WITH APPLICATION #M01046140. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 10 Dec 2024 | Sprinklers | Signed-off | Plumbing and sprinkler work associated with eating or drinking establishment tenant fitout work |
| 3 Dec 2024 | Mechanical Systems | Signed-off | Mechanical work associated with apartment and rental office fitouts. No change in occupancy, use or egress under this application |
| 22 Nov 2024 | General Construction | Permit Issued | General construction associated with conversion of existing 1st floor retail space into an Eating or Drinking Establishment |
| 12 Aug 2024 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY SHORING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE |
| 7 Aug 2024 | Plumbing | Permit Issued | Plumbing work associated with conversion of floors 10th-13th to residential use |
| 17 Jul 2024 | Plumbing | Signed-off | Plumbing and sprinkler work assocated with apartment and rental office fitouts. No change in occupancy, use or egress under this application |
| 5 Jul 2024 | General Construction | Signed-off | General construction associated with apartment and accessory rental office fitouts. No change in occupancy, use or egress under this application |
| 26 Jun 2024 | Suspended Scaffold | Permit Issued | SUSPENDED SCAFFOLD FOR FACADE RESTORATION AS SHOWN ON PLANS |
| 17 Jun 2024 | Supported Scaffold | Permit Issued | INSTALLATION OF ELEVATOR SHAFT SCAFFOLDING AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY |
| 8 Apr 2024 | General Construction | Permit Issued | APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 5 Apr 2024 | Plumbing | Signed-off | APPLICATION FILED FOR PLUMBING REMOVAL/MODIFICATIONS ON THE 3RD FLOOR (SUITE 300 & 331) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 12 Mar 2024 | Suspended Scaffold | Permit Issued | Facade Restoration |
| 30 Jan 2024 | Sidewalk Shed | Signed-off | INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF |
| 18 Oct 2023 | Mechanical Systems | Signed-off | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 18 Aug 2023 | Plumbing | Signed-off | APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 18 Aug 2023 | Sprinklers | Signed-off | Temporary sprinkler loop as per plans filed herewith. No change in occupancy, use or egress |
| 14 Aug 2023 | Sprinklers | Signed-off | Sprinkler work associated with conversion of 10th-13th fls to residential use |
| 1 Aug 2023 | Supported Scaffold | Signed-off | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE |
| 10 Jul 2023 | Sidewalk Shed | Signed-off | INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 6 Jul 2023 | Construction Fence | Signed-off | INSTALLATION OF CHAIN LINK FENCE AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPACNY. WE SHALL COMPLY WITH CHAPTER 33 OF 2022 B.C |
| 22 Jun 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE |
| 13 Jun 2023 | General Construction | Permit Issued | General construction associated with conversion of 11th-13th floors to residential use |
| 31 May 2023 | Mechanical Systems | Permit Issued | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 3RD FLOOR (SUITE 323-324) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 5 Apr 2023 | Sign | Signed-off | APPLICATION FILED FOR AN ILLUMINATED BUSINESS SIGN ON WALL. SIGN TO READ LIFE TIME. NOT WITHIN VIEW OF AN ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE EGRESS OR OCCUPANCY |
| 27 Feb 2023 | Mechanical Systems | Permit Issued | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 3RD FLOOR (SUITE 331) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 27 Feb 2023 | Mechanical Systems | Signed-off | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 27 Feb 2023 | Sprinklers | Permit Issued | APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS ON THE 3RD FLOOR (SUITE 323-324) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 16 Feb 2023 | General Construction | Signed-off | Selective Interior demolition of non-load bearing partitions as per plans filed herewith.No change in occupancy, use or egress |
| 14 Feb 2023 | General Construction | Signed-off | APPLICATION FILED FOR FACADE PEDIMENT RESTORATION AND REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| 2 Feb 2023 | General Construction | Permit Issued | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR (SUITE 323/324) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 31 Jan 2023 | Mechanical Systems | Signed-off | INSTALL CHIMNEY REDUCER |
| 7 Dec 2022 | Plumbing | Signed-off | APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 7 Dec 2022 | Sprinklers | Permit Issued | APPLICATION FILED FOR PLUMBING/SPRINKLER MODIFICATIONS/ADDITIONS ON THE 3RD FLOOR (SUITE 331) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 28 Nov 2022 | A2 | ISSUED | — |
| 18 Nov 2022 | General Construction | Permit Issued | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR (SUITE 331) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 4 Nov 2022 | Sprinklers | Signed-off | APPLICATION FILED FOR SPRINKLER MODIFICATIONS/ADDITIONS ON THE 3RD FLOOR (SUITE 305) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 21 Oct 2022 | A2 | ISSUED | — |
| 30 Sep 2022 | General Construction | Permit Issued | APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR (SUITE 300 & 331) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 9 Sep 2022 | Supported Scaffold | Signed-off | INSTALLATION OF SUPPORTED SCAFFOLD AS SHOWN ON DRAWINGS. NO CHANGE IN USE EGRESS OR OCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2014 B.C |
| 18 Aug 2022 | Plumbing | Permit Issued | Plumbing modifications in conjunction with plaza renovation. General construction application filed under #140924908 |
| 18 Jul 2022 | Mechanical Systems | Signed-off | APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 3RD FLOOR (SUITE 305) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 14 Jul 2022 | General Construction | Signed-off | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR (SUITE 305) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 28 Jun 2022 | Plumbing | Signed-off | Plumbing modifications in conjunction with plaza renovation. General construction application filed under #140924908 |
| 27 May 2022 | Construction Fence | Signed-off | HEREWITH TO PROPOSE TEMPORARY WOOD CONSTRUCTION FENCE. NO CHANGES IN OCCUPANCY,USE, GROUP OR EGRESS UNDER THIS APPLICATION |
| 11 Mar 2022 | General Construction | Signed-off | APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 3RD FLOOR (SUITE 305) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 11 Feb 2022 | Plumbing | Signed-off | APPLICATION FILED FOR ADDITIONS/MODIFICATIONS TO PLUMBING/SPRINKLER IN THE EXISTING LOBBY AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| 14 Jan 2022 | Structural | Permit Issued | Structural work in conjunction with plaza renovation. General construction application is filed under #140924908 |
| 6 Oct 2021 | Structural | Signed-off | Application filed for Structural Modifications/additions to existing storefront (Replace existing storefront with new) as per plans filed herewith. No change in use, egress or occupancy |
Showing the 50 most recent of 150. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 6 days ago. Coverage on this parcel: 14 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.