115 Broad Street
Analysis
The property offers solid recent pricing and strong value growth, but the residential over‑building and existing violations constrain its upside and add compliance risk.
The good
- recent arm's‑length sale in 2022 at $250.8 million shows market activity
- assessed value rose 75.5% indicating strong appreciation
- price per unit of $190,005 and average unit size of 754 sq ft are competitive for a large NYC building
The bad
- building is over‑built for residential use, exceeding the residential floor‑area limit
- seven open violations, even though the per‑unit rate is low, represent compliance risk
- over‑built status limits future expansion or rezoning opportunities
Written by a language model from this property's own figures — the same numbers shown on this page. It introduces no facts of its own: every figure it cites is checked against the data before the text is shown. It is a reading of the numbers, not a professional opinion, and it can be wrong about emphasis even when it is right about arithmetic. See our methodology.
What the numbers say
Generated from this property's own figures using the rules set out in our methodology. Every statement below refers to a number shown on this page.
Already larger than residential zoning would allow
The building occupies a floor-area ratio of 19.33, against a residential limit of 10.00 — it is over that limit by 9.33. A building in this position almost always predates the current rules and is legally non-conforming: it may generally remain, but it typically cannot be enlarged for residential use, and it may not be rebuildable as it stands.
A light open-violation load
Only 7 violations are currently open across 1,320 residential units, with $0.00 outstanding. For a building of this age that is a modest figure.
Last recorded sale
Recorded at $250,806,808 on 28 Dec 2022 — $190,005 per residential unit, $240 per built square foot, 1.92× the assessed value.
Assessed value trend
Assessed value has risen 75.5% across the 5 assessment years on record (2023 to 2027), standing at $130,493,250. Because tax is levied on the assessed figure rather than on market value, a sustained move here tends to show up in the bill.
Development & zoning
Floor-area ratio
| Built | 19.33 |
|---|---|
| Residential limit | 10.00 |
| Commercial limit | 15.00 |
| Community-facility limit | 15.00 |
Development headroom (calculated) calculated
| Highest permitted ratio | 15.00 |
|---|---|
| Unused ratio | -4.33 |
| Unused buildable area | — |
| Lot area | 54,023 sq ft |
Value & taxes
Assessment
| Assessed total | $130,493,250 |
|---|---|
| Assessed land | $20,880,000 |
| Assessed building | $109,613,250 |
| Market value on record | $289,985,000 |
| Assessed as % of market | 45.0% |
Tax
| Tax class | 2 |
|---|---|
| Taxable assessed | $128,782,297 |
| Tax rate | 12.502% |
| Estimated annual levy | $16,100,362.77 |
| Tax exemption (assessed value) | 467m 35 Yr Mpda — $117,443,925 (through 2062) |
The levy is an estimate — taxable value × the published rate for the class. It does not account for exemptions or abatements the property may carry, and will not match an actual bill. It is not the property's total debt to the city: unpaid tax and water arrears are not shown anywhere on this page.
Assessed value by year
| Year | Assessed value | Change |
|---|---|---|
| 2027 | $130,493,250 | — |
| 2026 | $108,214,650 | +20.6% |
| 2025 | $75,248,550 | +43.8% |
| 2024 | $84,355,650 | -10.8% |
| 2023 | $74,367,900 | +13.4% |
Building & occupancy
Structure
| Year built | 1969 |
|---|---|
| Floors | 32 |
| Building area | 1,044,351 sq ft |
| Residential area | 995,416 sq ft |
| Commercial area | 48,935 sq ft |
Occupancy
| Total units | 1,323 |
|---|---|
| Residential units | 1,320 |
| Rent-stabilized | 330 |
| Free Market / Other | 990 |
| Storefronts | 2 |
| Residential Avg unit size | 754 sq ft (calculated) |
| Commercial Avg unit size | 16,312 sq ft (calculated) |
| Building class | D5 |
Neighborhood, risk & energy
Neighborhood & transit
| Nearest subway | Whitehall St-South Ferry (R, W) — 0.12 mi |
|---|---|
| School district | 2 |
| Police precinct | 1 |
| Nearest firehouse | Engine 4/Ladder 15 — 42 South Street |
Location risk
| Flood zone | High-risk (Zone AE) |
|---|---|
| Hurricane evacuation zone | Zone 1 |
| Projected floodplain | In the projected 2050s floodplain |
| City emergency repairs | 1 orders — $0 billed (through 2025) |
Energy & emissions
| Energy grade | B |
|---|---|
| Energy use intensity | 8.9 kBtu/ft² |
| Greenhouse-gas emissions | 1,045 metric tons/yr |
Comparable sales
| Address | Sale date | Price | Sq ft | $/sq ft |
|---|---|---|---|---|
| 125 Broad Street | 2016-04-26 | $129,482,000 | — | — |
Record activity
Compliance calculated
| Open violations | 7 |
|---|---|
| Open per residential unit | 0.0 (calculated) |
| Enforcement penalties | $0.00 |
| Safety-violation penalties | Not available |
| Total penalties owed | $0.00 (calculated) |
| On tax-lien sale list | No |
Activity
| Complaints recorded | 394 |
|---|---|
| Permits / alterations | 257 |
| Recorded documents | 60 |
| Legal proceedings | 0 |
Total penalties owed combines two separate debts — enforcement penalties (from summonses) and safety-violation penalties (unfiled inspections and reports on boilers, elevators, facades and energy use). The second kind accrues quietly and is routinely missed; it is a standing debt on the building, not a fine someone can walk away from. The safety figure could not be retrieved for this property, so no total is shown — we would rather show nothing than a total that silently omits it. Neither figure includes unpaid property tax or water and sewer arrears, which are frequently the largest number of all and appear nowhere on this page. For a true payoff figure, go to the city directly.
Ownership & last recorded sale
Owner of record
| Owner | 25 Water Owner, LLC |
|---|---|
| Parcel | 1000050010 |
| Block | 5 |
| Lot | 10 |
| Mortgage on record | $208,713,753 (2022) — Athene Annuity And Life Company — note assigned |
| Fixture liens | 1 active fixture lien |
Last recorded transfer
| Date | 28 Dec 2022 |
|---|---|
| Recorded price | $250,806,808 |
| Price per unit | $190,005 |
| Price vs assessed | 1.92× |
Owner of record comes from the public land-use record and may lag a recent sale. It is frequently a holding company rather than an individual. If you own or manage this property and believe something here is wrong, tell us — we read and respond to every message of that kind.
Open violations
Open violations only. A violation that was raised and later corrected is not counted — an older building accumulates hundreds of those, and the number says more about its age than its condition.
| Issued | Category | Class | Status | Amount due | Description |
|---|---|---|---|---|---|
| 25 Jun 2026 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENT AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 852, 8th STORY, 1st APARTMENT FROM WEST AT NORTH |
| 25 Jun 2026 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENT AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 852, 8th STORY, 1st APARTMENT FROM WEST AT NORTH |
| 25 Jun 2026 | Housing | B | NOV SENT OUT | — | 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENT AT CEILING IN THE KITCHEN LOCATED AT APT 852, 8th STORY, 1st APARTMENT FROM WEST AT NORTH |
| 25 Jun 2026 | Housing | C | VIOLATION WILL BE REINSPECTED | — | 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 6, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 852, 8th STORY, 1st APART |
| 14 Apr 2026 | Housing | C | NOTICE OF ISSUANCE SENT TO TENANT | — | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1809, 18th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''south |
| 14 Apr 2026 | Housing | B | INVALID CERTIFICATION | — | 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT CELLAR |
| 14 Apr 2026 | Housing | A | NOV CERTIFIED ON TIME | — | 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT CELLAR |
Complaints
A complaint is an allegation, not a finding — many are dismissed. A sustained pattern is nevertheless informative about how a building is run.
| Date | Problem | Type | Status | Closed |
|---|---|---|---|---|
| 9 Aug 2026 | Banging/Pounding | Noise - Residential | Closed | 9 Aug 2026 |
| 9 Aug 2026 | Banging/Pounding | Noise - Residential | Closed | 9 Aug 2026 |
| 9 Aug 2026 | Banging/Pounding | Noise - Residential | Closed | 9 Aug 2026 |
| 8 Aug 2026 | Banging/Pounding | Noise - Residential | Closed | 9 Aug 2026 |
| 8 Aug 2026 | Loud Music/Party | Noise - Residential | Closed | 9 Aug 2026 |
| 8 Aug 2026 | Banging/Pounding | Noise - Residential | Closed | 8 Aug 2026 |
| 8 Aug 2026 | Banging/Pounding | Noise - Residential | Closed | 8 Aug 2026 |
| 6 Aug 2026 | Loud Music/Party | Noise - Residential | Closed | 6 Aug 2026 |
| 6 Aug 2026 | Ventilation | Indoor Air Quality | Closed | 7 Aug 2026 |
| 4 Aug 2026 | Banging/Pounding | Noise - Residential | Closed | 4 Aug 2026 |
| 3 Aug 2026 | Loud Music/Party | Noise - Residential | Closed | 3 Aug 2026 |
| 3 Aug 2026 | Partial Access | Blocked Driveway | Closed | 3 Aug 2026 |
| 2 Aug 2026 | Alarm | Noise | Closed | 3 Aug 2026 |
| 30 Jul 2026 | Banging/Pounding | Noise - Residential | Closed | 30 Jul 2026 |
| 30 Jul 2026 | Dog | Noise | Closed | 4 Aug 2026 |
| 29 Jul 2026 | Loud Talking | Noise - Residential | Closed | 29 Jul 2026 |
| 29 Jul 2026 | Dog | Noise | Closed | 4 Aug 2026 |
| 29 Jul 2026 | Privately Owned Public Space/Non-Compliance | Special Projects Inspection Team (SPIT | Open | 29 Jul 2026 |
| 28 Jul 2026 | Banging/Pounding | Noise - Residential | Closed | 28 Jul 2026 |
| 28 Jul 2026 | Loud Television | Noise - Residential | Closed | 28 Jul 2026 |
| 26 Jul 2026 | Posted Parking Sign Violation | Illegal Parking | Closed | 27 Jul 2026 |
| 23 Jul 2026 | Banging/Pounding | Noise - Residential | Closed | 23 Jul 2026 |
| 23 Jul 2026 | Noise, Barking Dog (NR5 | Noise | Closed | 28 Jul 2026 |
| 22 Jul 2026 | Noise, Barking Dog (NR5 | Noise | Closed | 22 Jul 2026 |
| 16 Jul 2026 | Dog | Noise | Closed | 6 Aug 2026 |
| 15 Jul 2026 | Loud Talking | Noise - Residential | Closed | 15 Jul 2026 |
| 14 Jul 2026 | Banging/Pounding | Noise - Residential | Closed | 14 Jul 2026 |
| 13 Jul 2026 | Noise, Barking Dog (NR5 | Noise | Closed | 15 Jul 2026 |
| 13 Jul 2026 | Ventilation | Indoor Air Quality | Closed | 14 Jul 2026 |
| 8 Jul 2026 | Loud Talking | Noise - Residential | Closed | 8 Jul 2026 |
| 7 Jul 2026 | Street Light Out | Street Light Condition | Closed | 10 Jul 2026 |
| 6 Jul 2026 | Elevator - Multiple Devices On Property | Elevator | Closed | 28 Jul 2026 |
| 5 Jul 2026 | Banging/Pounding | Noise - Residential | Closed | 6 Jul 2026 |
| 1 Jul 2026 | Pothole | Street Condition | Closed | 2 Jul 2026 |
| 30 Jun 2026 | Loud Talking | Noise - Residential | Closed | 30 Jun 2026 |
| 30 Jun 2026 | Banging/Pounding | Noise - Residential | Closed | 30 Jun 2026 |
| 29 Jun 2026 | Double Parked Blocking Traffic | Illegal Parking | Closed | 29 Jun 2026 |
| 27 Jun 2026 | Banging/Pounding | Noise - Residential | Closed | 27 Jun 2026 |
| 26 Jun 2026 | Food Vendor | Vendor Enforcement | Closed | 26 Jun 2026 |
| 26 Jun 2026 | Ventilation | Indoor Air Quality | Closed | 29 Jun 2026 |
| 23 Jun 2026 | Banging/Pounding | Noise - Residential | Closed | 23 Jun 2026 |
| 20 Jun 2026 | Noise, Barking Dog (NR5 | Noise | Closed | 22 Jun 2026 |
| 19 Jun 2026 | Loud Music/Party | Noise - Residential | Closed | 19 Jun 2026 |
| 19 Jun 2026 | Loud Music/Party | Noise - Residential | Closed | 19 Jun 2026 |
| 16 Jun 2026 | Banging/Pounding | Noise - Residential | Closed | 16 Jun 2026 |
| 14 Jun 2026 | Banging/Pounding | Noise - Residential | Closed | 14 Jun 2026 |
| 14 Jun 2026 | Banging/Pounding | Noise - Residential | Closed | 14 Jun 2026 |
| 13 Jun 2026 | Loud Talking | Noise - Residential | Closed | 14 Jun 2026 |
| 11 Jun 2026 | Vent/Exhaust - Illegal/Improper | General Construction/Plumbing | Assigned | 4 Aug 2026 |
| 10 Jun 2026 | Blocked - ATM | Sidewalk Condition | In Progress | — |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Permits & alterations
The absence of a permit does not prove no work was done — it may equally mean work was done without one.
| Issued | Type | Status | Work |
|---|---|---|---|
| 3 Oct 2025 | Sidewalk Shed | Signed-off | INSTALLATION OF HEAVY-DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY |
| 16 Sep 2025 | Suspended Scaffold | Signed-off | Suspended Scaffold for exterior restoration as shown on plans |
| 27 Jan 2025 | Sign | Signed-off | INSTALL NON-ILLUMINATED SIGN ON WALL (25 WATER STREET |
| 7 Jan 2025 | General Construction | Signed-off | This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002. Scope of work include the model units only; Sales office filed separately under M01108031-I1 |
| 30 Dec 2024 | Suspended Scaffold | Signed-off | Installation of Suspended Scaffolding for Facade inspection/repair |
| 14 Nov 2024 | Suspended Scaffold | Signed-off | Installation of Suspended Scaffolding for Facade Work Or Inspection |
| 15 Oct 2024 | Sprinklers | Signed-off | Installation of sprinkler and standpipe systems |
| 14 Oct 2024 | General Construction | Signed-off | This application is filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulletin 2010-002 |
| 3 Oct 2024 | Suspended Scaffold | Permit Issued | Installation of Suspended Scaffolding for Facade Work Or Inspection |
| 30 Sep 2024 | Protection and Mechanical Methods | Signed-off | TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALTERATION, FILED SEP. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. HOIST & ELEVATOR APPL. SUBMITTED SEP |
| 27 Sep 2024 | General Construction | Signed-off | Facade work to include the partial demolition of the existing masonry facade and installation of new window wall and in-swing casement windows |
| 16 Sep 2024 | Boiler Equipment | Signed-off | Installation of (6) six gas boilers |
| 28 May 2024 | Suspended Scaffold | Permit Issued | Suspended Scaffold for exterior restoration as shown on plans |
| 23 May 2024 | Suspended Scaffold | Permit Issued | Installation of Suspended Scaffolding for Facade Work Or Inspection |
| 15 May 2024 | General Construction | Signed-off | Removal of existing brick masonry, back-up wall, and existing windows along future hoist run. No change to egress, use, or occupancy |
| 13 May 2024 | Supported Scaffold | Signed-off | Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 17 Apr 2024 | Suspended Scaffold | Permit Issued | Installation of Suspended Scaffolding for Facade Work Or Inspection |
| 24 Jan 2024 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY RIGGING EQUIPMENT |
| 24 Jan 2024 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF DEBRIS CHUTE. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 23 Jan 2024 | Protection and Mechanical Methods | Signed-off | FILING FOR MECHANICAL EQUIPMENT USE IN CONJUNCTION WITH PARTIAL DEMOLITION: SKID STEER LOADERS, DEMO ROBOTS, MINI EXCAVATORS, AND EXCAVATORS AS PER PLANS |
| 3 Jan 2024 | General Construction | Permit Issued | Vertical enlargement and conversion to residential use of existing 22-story building |
| 4 Dec 2023 | Protection and Mechanical Methods | Signed-off | CARS C&D: TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG ALT, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPL SUBMITTED SEP |
| 4 Dec 2023 | Protection and Mechanical Methods | Signed-off | CARS C&D: DUAL 7250# CAPACITY PERSONNEL/MATERIAL HOISTS DURING BLDG ALTERATION FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT |
| 21 Nov 2023 | Structural | Signed-off | Existing building connection reinforcement for temporary construction loading, as per plans filed herewith |
| 28 Sep 2023 | Protection and Mechanical Methods | Signed-off | TEMPORARY SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 27 Sep 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF DUAL PERSONNEL/MATERIAL HOISTS. CAR # 1 SHALL BE 10000# & CAR # 2 SHALL BE 7000# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEV APP SUB SEP |
| 8 Aug 2023 | Structural | Signed-off | Facade demolition and support |
| 2 Aug 2023 | Standpipe | Signed-off | Conversion of existing combined system to an alarmed air-pressurized dry standpipe system during construction. Removal of existing sprinkler risers, piping, and heads |
| 26 Jul 2023 | Structural | Signed-off | Demolition of rooftop bulkhead and elevator machine room. Demolition means and methods provided under M08027664-S1. Mechanical demolition equipment filed under M08027664-S4. Temporary structural bracing filed separately |
| 18 Jul 2023 | Structural | Signed-off | INSTALLATION OF TEMPORARY BRACING OF THE EXISTING COLUMN, SPANDREL, AND MASONRY WALL SYSTEM ALONG 125 BROAD STREET TO MAINTAIN THE STABILITY OF THE ELEMENTS AFTER DEMOLITION OF THE MOTOR ROOM AND PENTHOUSE ROOF SLAB AND FRAMING |
| 28 Jun 2023 | Supported Scaffold | Signed-off | TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 27 Jun 2023 | Protection and Mechanical Methods | Signed-off | TEMPORARY WINDOW PROTECTION AT THE ADJACENT PROPERTY (125 BROAD STREET) DURING BLDG ALTERATION, FILED SEP. WINDOW PROTECTION SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 27 Jun 2023 | Protection and Mechanical Methods | Signed-off | TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS. NEEDLE BEAM PLATFORM SHALL SERVE AS THE BASE STRUCTURE FOR PIPE SCAFFOLDING & SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. PIPE SCAFFOLD FILED SEP |
| 26 Jun 2023 | Structural | Signed-off | New openings and infill of existing openings |
| 13 Jun 2023 | Structural | Signed-off | Upgrade of lateral systems and existing columns |
| 1 Jun 2023 | General Construction | Signed-off | Partial demolition means and methods. Mechanical demolition equipment filed separately |
| 30 May 2023 | Structural | Signed-off | INSTALLATION OF TEMPORARY STABILIZATION FOR THE PARTIAL DEMOLITION OF THE INTERIOR STRUCTURE |
| 2 May 2023 | Structural | Signed-off | Upgrade of lateral systems and existing columns. Additional structural bracing filed separately under M08027648 |
| 1 May 2023 | Protection and Mechanical Methods | Signed-off | Installation of overhead protection at buildings 1st floor lobby and arcade as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress, or occupancy |
| 18 Apr 2023 | General Construction | Signed-off | MASONRY OPENINGS AS PER PLANS FOR FUTURE HOIST INSTALLATION. HOIST FILED UNDER SEPARATE APPLICATION. REPLACEMENT OF BRICKS BY OTHERS AT COMPLETION OF PROJECT. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 31 Mar 2023 | Mechanical Systems | Signed-off | Demolish all existing mechanical equipment, ductwork, and piping |
| 16 Mar 2023 | General Construction | Signed-off | Interior non-structural demolition to include removal of all interior partitions, furring, and finishes |
| 13 Mar 2023 | Protection and Mechanical Methods | Signed-off | INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT ADJACENT PROPERTIES DURING BLDG ALTERATION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION |
| 13 Mar 2023 | Construction Fence | Signed-off | INSTALLATION OF CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY |
| 1 Mar 2023 | Plumbing | Signed-off | Removal of all existing risers, fixtures, and distribution |
| 20 Jan 2023 | Construction Fence | Signed-off | Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 18 Jan 2023 | Plumbing | Signed-off | Demolition of plumbing fixtures, remove and cap plumbing back to risers |
| 4 Jan 2023 | Sidewalk Shed | Signed-off | Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application |
| 29 Dec 2022 | General Construction | Signed-off | GENERAL CONSTRUCTION WORK AS SHOWN ON PLANS |
| 28 Dec 2022 | Mechanical Systems | Signed-off | Demolition of existing HVAC, ducts, and piping |
Showing the 50 most recent of 150. The full set is available in the interactive report.
Recorded documents
Deeds, mortgages and related instruments recorded against the lot. A recorded amount is not necessarily a market price.
| Recorded | Type | Amount | From | To |
|---|---|---|---|---|
| 9 Dec 2025 | AL&R | $415,000,000 | — | — |
| 9 Dec 2025 | Assignment | — | — | — |
| 9 Dec 2025 | TL&R | — | — | — |
| 9 Dec 2025 | Agreement | $415,000,000 | — | — |
| 26 Nov 2025 | SMIS | — | — | — |
| 6 Oct 2025 | RPTT&RET | — | — | — |
| 21 Mar 2024 | SAGE | — | — | — |
| 21 Mar 2024 | SAGE | — | — | — |
| 21 Mar 2024 | SAGE | — | — | — |
| 16 May 2023 | TERL | $72,000 | — | — |
| 24 Mar 2023 | SMIS | — | — | — |
| 10 Jan 2023 | AL&R | $415,000,000 | — | — |
| 28 Dec 2022 | Deed | $250,806,808 | — | — |
| 28 Dec 2022 | Assignment | — | — | — |
| 28 Dec 2022 | Agreement | $107,012,128 | — | — |
| 28 Dec 2022 | Mortgage | $208,713,753 | — | — |
| 28 Dec 2022 | Mortgage | $99,274,119 | — | — |
| 2 Jan 2018 | Transfer tax return | $28,050,000 | — | — |
| 12 Sep 2017 | Transfer tax return | $772,190 | — | — |
| 11 Mar 2015 | Agreement | — | — | — |
| 11 Mar 2015 | Agreement | — | — | — |
| 11 Mar 2015 | Agreement | — | — | — |
| 11 Mar 2015 | Agreement | — | — | — |
| 11 Mar 2015 | Agreement | — | — | — |
| 3 Mar 2015 | Agreement | — | — | — |
| 23 Feb 2015 | TL&R | — | — | — |
| 23 Feb 2015 | Assignment | — | — | — |
| 23 Feb 2015 | Agreement | $250,000,000 | — | — |
| 23 Feb 2015 | Assignment | — | — | — |
| 23 Feb 2015 | TL&R | — | — | — |
| 23 Feb 2015 | TL&R | — | — | — |
| 23 Feb 2015 | Mortgage | $55,650,000 | — | — |
| 23 Feb 2015 | Assignment | — | — | — |
| 26 Sep 2013 | Mortgage | $10,000,000 | — | — |
| 26 Sep 2013 | AL&R | $10,000,000 | — | — |
| 26 Sep 2013 | Mortgage | $30,850,000 | — | — |
| 26 Sep 2013 | AL&R | $30,850,000 | — | — |
| 12 Sep 2012 | MLEA | — | — | — |
| 28 Jun 2012 | Agreement | $153,500,000 | — | — |
| 28 Jun 2012 | Assignment | — | — | — |
| 28 Jun 2012 | TL&R | — | — | — |
| 28 Jun 2012 | AL&R | $153,500,000 | — | — |
| 28 Jun 2012 | Mortgage | $76,500,000 | — | — |
| 28 Jun 2012 | Agreement | — | — | — |
| 28 Jun 2012 | Deed | $270,000,000 | — | — |
| 18 Mar 2011 | SAGE | — | — | — |
| 10 May 2010 | AALR | — | — | — |
| 10 May 2010 | Assignment | — | — | — |
| 14 Apr 2010 | Agreement | — | — | — |
| 15 Jan 2010 | Deed | $107,000,000 | — | — |
Showing the 50 most recent of 60. The full set is available in the interactive report.
About this page
Compiled from New York City public records — data retrieved 4 days ago. Coverage on this parcel: 15 of 15 record groups populated. The derived figures — unused floor-area ratio, buildable area, the assessed-value trend and the per-unit ratios — are calculated by us and appear in no public dataset; the formulas are in the methodology.
This is a research tool, not advice. It is not a title search, a lien search, a survey or an inspection, and it does not replace any of them. If a figure here matters to a decision, verify it at the source. See Terms.